Appendix F F.5.3 Capture Then Maintain. ATC can issue a Capture Then Maintain clearance when the IM aircraft and the lead aircraft are on similar routes. The FIM avionics will provide IM speeds to move the IM aircraft to the ASG. A sample IM clearance could be:
“TRAIL 456 capture then maintain 10 miles behind LED123.”
Figure F-2. Capt ure Then Maintain F .5.4 Achieve-by Then Maintain (“Cross”). When ATC needs the ASG achieved by the time the IM aircraft reaches a particular fix, the controller may issue an Achieve-by Then Maintain clearance. The lead aircraft and IM aircraft may be on different paths at the time of the clearance, but will cross a common fix. The clearance will contain the lead aircraft’s planned route and the identification of the fix to cross, and optionally the PCP.
The ASG can be expressed in time or distance. An example could be: “TRAIL 456 Cross HONEE 90 seconds behind LED123 on the BRAVO Transition. Cancel at LASFX.” The IM flightcrew will fly the IM speeds to achieve the ASG by the time they cross the CP.
They will maintain the ASG until the PCP, or until the controller cancels the IM operation.
Figure F-3. Ach ieve-by Then Maintain (Cross) F- 7
Appendix F F.5.5 Final Approach Spacing. ATC may issue a Final Approach Spacing clearance when one or both of the lead aircraft and the IM aircraft will be on the same final approach course.
One aircraft can be on an intercept to final if the other aircraft is already established on the final approach course. The controller will include the lead aircraft identification and the ASG.
Figure F-4. Fin al Approach Spacing F .5.6 IM Suspend. ATC may have a need to interrupt an active IM operation, such as to resolve a developing traffic conflict. IM Suspend is not strictly a clearance type. It is functionality in the FIM avionics that temporarily removes IM speeds, indications, and alerts, but retains the basic IM clearance information.
F.5.7 SafeRoute+ Differences. SafeRoute+ is the Aviation Communication & Surveillance Systems (ACSS) commercial name for the only FIM avionics in production at the time of this writing (2021). It contains a subset of the standard IM functions and has some functionality that differs from the industry standard. The SafeRoute+ avionics only accommodates two of the clearance types (i.e., Capture Then Maintain and Achieve-by Then Maintain) and they differ slightly from the standards invoked in TSO-C195c.
F.5.7.1 Mai ntain Current Spacing and Capture Then Maintain. In the absence of an ASG entry by the flightcrew, the SafeRoute+ FIM avionics calculates IM speeds to maintain the current spacing. A time or distance input must still be made by the flightcrew.
F.5.7.2 Achieve-by Then Maintain. SafeRoute+ Achieve-by Then Maintain clearance differs from the standards in two ways. It does not accept the lead aircraft’s planned route; therefore, the lead aircraft and IM aircraft must be flying direct to a common merge point.
F.5.7.3 No IM Suspend. SafeRoute+ does not include a “suspend” function. Instead the pilot uses the “terminate” (a.k.a. “cancel”) function.
F- 8
Appendix F Table F-2. IM Clearance Types Summarized
Clearance Type Maintain Capture Then Maintain Cross Final Approach Spacing Notional Phraseology “TRAIL 456 Maintain distance behind LED123” “TRAIL 456 Maintain 90 seconds behind LED123” (or “Maintain 10 miles”) “TRAIL 456 Cross HONEE 90 seconds behind LED123 on the BRAVO transition. Cancel at LASFX” “TRAIL 456 Cross GOSER 90 seconds behind LED123” Clearance Elements Lead A/C FLT ID Lead A/C FLT ID Lead A/C FLT ID Lead A/C FLT ID ASG (implied) ASG ASG ASG CP Lead aircraft planned route if different than the IM aircraft planned route Lead aircraft planned route if different than the IM aircraft planned route PCP (optional) PCP (optional) PCP PCP defaulted Notes Underline indicates clearance type cue.
Not in SafeRoute+ Underline indicates clearance type cue.
Lead aircraft is on different route– “BRAVO” transition.
Not in SafeRoute+ F.6 IM Procedure. ATC may initiate an IM operation when operationally beneficial. The IM operations will proceed as follows:
F.6.1 AT C I dentifies IM Pair. Using automation support tools, ATC identifies the potential IM lead aircraft and IM aircraft, ASG, CP (when applicable), and PCP.
F.6.2 ATC Ch ecks Feasibility. ATC, supported by automation, determines the feasibility of the IM operation. Some of the factors used in this determination are current spacing, remaining distance, conflicting traffic, and weather.
F.6.3 ATC Issu es IM Clearance. ATC issues the IM clearance to the IM aircraft flightcrew using one of the four clearance types.
F.6.4 IM Flig htcrew Reads Back Clearance. The IM aircraft flightcrew reads back the IM clearance and enters the IM clearance information into the FIM avionics.
F.6.5 IM Flig htcrew Verifies Lead Aircraft. The flightcrew verifies that they have selected the correct lead aircraft and that they have entered the IM clearance elements correctly.
F -9
Appendix F F.6.5.1 FLT ID Verification. Verifying the correct lead aircraft is an essential step.
It can be complicated by two factors. The first factor is that the telephonic, or spoken call sign of the lead aircraft might not easily translate into the FLT ID displayed by the FIM avionics. For example, “Brickyard” does not readily translate to “RPA.” The second factor is that the lead aircraft, or nearby nonparticipating aircraft might have erroneously programmed their FLT ID in their ADS-B Out system. The flightcrew should not accept the IM clearance if there is any doubt that they have correctly identified the lead aircraft as that given in the IM clearance.
F.6.6 FI M Avionics I nternal Check. The FIM avionics performs an internal check to ensure all performance criteria are met. If the performance criteria are met, the FIM avionics displays the first IM speed.
F.6.7 IM Flig htcrew Evaluates IM Speed. The flightcrew evaluates the IM speed to determine whether it is acceptable given operational considerations such as ride conditions and own aircraft limitations.
F.6.7.1 R ejected Clearance. If the flightcrew determines that the IM speed is unacceptable, they will immediately notify ATC that they are unable to accept the IM clearance.
F.6.7.2 Accepted Clearance. If the flightcrew determines that the IM speed is acceptable, they begin complying with the IM speeds with no further instruction by ATC (i.e., further read-back or reporting the implementation of each IM speed). ATC does not require any further acknowledgement by the flightcrew that they have accepted the IM clearance. This is similar to acknowledging a clearance to descend or climb; ATC expects the flightcrew to promptly comply or notify ATC that they are unable to comply.
F.6.8 I M F lightcrew Flies IM Speeds. The FIM avionics calculates IM speeds to maintain or achieve the ASG. In the case of an Achieve-by Then Maintain (a.k.a. “Cross”) clearance, the IM speeds are flown to achieve the ASG by the time the IM aircraft reaches the CP.
In the case of a Capture Then Maintain clearance, the IM speeds are flown to achieve the ASG quickly and then maintain that ASG until reaching the PCP.
F.6.8.1 C ompliance With IM Speeds. It is important to emphasize that flightcrews should resist the temptation to “out-guess” the FIM algorithm by flying speeds other than the IM speed. Flying the IM speeds is how the flightcrew complies with the ATC-issued IM clearance. The FIM algorithm is designed to account for speed changes that result from the lead aircraft trajectory as well as actual winds encountered along the IM aircraft’s route, which inevitably will differ from the forecast winds entered in the FIM avionics. Not complying with the IM speed will make precise IM spacing more difficult and could lead to the need to fly more IM speeds than necessary.
F -10
Appendix F F.6.8.2 Mandatory Published Speeds. The mandatory speeds published on STAR procedure charts are designed to condition the flow of traffic into the terminal arrival area. They are the basis for the speed profile used by the FIM avionics to calculate estimated times of arrival (ETA) at CP when using an Achieve-by Then Maintain clearance type and to calculate speed limits on the IM speed.
The IM speeds supersede the published speeds when operating on an IM clearance. Published speeds are used by the FIM avionics in the calculation of the trajectory of the lead aircraft and, hence the IM speeds. Flightcrews need to continue to comply with the IM speed unless directed by ATC.
F.6.8.3 Compliance With Operational or Regulatory Speed Restrictions. It is the flightcrew’s responsibility to ensure that each IM speed does not conflict with any operational or regulatory speed restrictions. IM speeds do NOT supersede regulatory speed restrictions, such as 250 knots indicated airspeed (KIAS) below 10,000 feet mean sea level (MSL) in the United States. They also do not supersede the aircraft’s various operational speed restrictions. FIM avionics will limit IM speeds to within the operational limits of the aircraft, and not conflict with regulatory speed limits described here.
F.6.9 IM Cancella tion. The IM aircraft flightcrew complies with the IM speeds until the procedure is canceled. When the IM operation is canceled, the FIM avionics no longer provides IM speeds or alerts. Upon IM cancellation, the flightcrew complies with speeds as instructed by ATC, as published, or as the last IM speed displayed. The IM operation will be canceled in one of the following ways:
• Automatically by the FIM avionics upon reaching the PCP;
• Manually by the flightcrew upon ATC instruction;
• Manually by the flightcrew for other operational reasons (which must be followed with a report to ATC); or
• Automatically due to certain off-nominal situations (which must be followed with a report to ATC if the flightcrew determined the operation needed to end).
F.7 Off-Nominal Situations. The IM procedure depends upon multiple factors: accurate wind and temperature profiles, close adherence to IM speed, and both aircraft adhering to their planned flight profiles. FIM avionics incorporates internal checks that verify that the horizontal navigation path of the IM aircraft and the lead aircraft are in acceptable limits for the IM procedure. Speed compliance monitoring by the FIM avionics assists the IM aircraft flightcrew with implementing the displayed IM speed. In the event the flightcrew is unable to continue conforming to the IM clearance by flying the IM speeds, they must notify ATC.
F.8 IM Flight Planning. IM flight planning should take into consideration the capabilities of the aircraft, flightcrew, and the air navigation service providers (ANSP) where IM is conducted. ATC will need to know in advance which aircraft are FIM-equipped and that the flightcrew is approved to conduct IM. To facilitate this, correct aircraft equipment codes will need to be entered on the flight plan.
F- 11
Appendix F F.8.1 IM Outside the U.S. NAS. In the future, ANSPs outside the United St ates may conduct IM. Before conducting IM operations outside the U.S. NAS, determine whether the destination ANSP provides IM services that are compliant with existing ICAO guidance.
F.8.2 Flight Plan Codes. Cur rently there are no specific flight plan equipment capability codes for IM, only codes that indicate installed ADS-B Out and ADS-B In equipment.
However, in the future there will be codes published in ICAO and FAA guidance that indicate a number of ADS-B In capabilities and flightcrew authorizations. Refer to the Aeronautical Information Manual (AIM), Chapter 5, Air Traffic Procedures, for instructions on filing ADS-B equipment codes.
F.9 Authorization to Conduct IM. FAA authorization is required for all U.S. aircraft operators to conduct IM operations using ADS-B In (14 CFR part 119, § 119.49(a)(5)).
For FAA authorization, refer to FAA Order 8900.1, Volume 3, Chapter 18, Section 3, Operations Specification (OpSpec)/Management Specification (MSpec)/Letter of Authorization (LOA) A355, Automatic Dependent Surveillance-Broadcast (ADS-B) In Operations.
F.9.1 Initial Request for Authorization. U. S. aircraft operators seeking to conduct IM should first contact their assigned FAA office to indicate their intent. At the time of the operator’s initial request, the FAA will provide the operator with an IM Application Checklist, which should be completed with attached supporting documents.
F.9.2 Documentation to Submit With Formal Request. T his section describes the documentation to be submitted with a formal IM proposal.
F.9.2.1 Req uest Letter. The operator’s assigned principal inspector (PI) may ask for additional information based on any unique aspects of their specific operation.
The operator should submit a letter of request for issuance of authorization to the assigned PI. The letter may be in a form acceptable to the Administrator
(e.g., as an electronic document entered into the Operations Approval Portal System (OAPS)). The letter of request should include the following information:
• Type of aircraft (make, model, and series (M/M/S)).
• List of aircraft registration numbers (N-number) associated with the request for authorization.
• ADS-B equipment complies with TSO-C195c or later, or as approved for IM by the Administrator.
• Installation was completed following guidance contained in AC 20-165, Airworthiness Approval of Automatic Dependent Surveillance - Broadcast OUT Systems, and AC 20-172, Airworthiness Approval for ADS-B In Systems and Applications, or other acceptable means.
F-12
Appendix F
• Name of the ADS-B In (IM) software manufacturer and applicable software version(s).
• Intended areas of IM operations, listed by ANSP.
F.9.2.2 Airplane Flight Manual (AFM) Compliance Documentation. Operators will submit documentation that demonstrates applicable aircraft have an ADS-B In system that meets the performance standards of TSO-C195c or later, or as otherwise approved by the Administrator, for IM operations.
F.9.2.3 Operation Manuals and Checklists. The certificate holder (CH)/operator/program manager (as applicable) should submit information
(e.g., Airplane Operations Manual (AOM) bulletin or equivalent) to the flightcrews describing ADS-B to include:
• IM system description;
• Normal procedures; and
• Non-normal or contingency procedures.
F.9.2.4 Maintenance Documentation. See Appendix C, ADS-B In Operations— Aircraft Qualification and Maintenance, for applicable maintenance guidance.
F.9.2.5 Re vision of Minimum Equipment List (MEL). See Appendix C for guidance on the necessary MEL documents to be submitted for authorization of IM.
F.9.2.6 Pilot Training. Submit applicable portions of proposed IM-specific pilot training material and include a description of the methods used to conduct, evaluate, and manage the training. The IM pilot training should include:
1. ADS-B Out/In system overview (if not previously addressed with another ADS-B application).
2. ADS-B IM system operations.
3. IM normal procedures:
• Understanding IM clearance types and clearance elements.
• Compliance with IM speed.
• Response to IM alerts.
• Lead aircraft FLT ID verification.
• Crew coordination during IM.
4. IM MEL procedures (as applicable).
5. IM equipment limitations.
F- 13
Appendix F
6. CDTI interface.
7. Contingency procedures.
F.9.2.7 Dispatch/Flight Follower Training. Submit applicable portions of proposed IM-specific dispatch/flight planning training material to include any appropriate updates to the dispatch operations manual, or equivalent, as well as a description of the methods used to conduct, evaluate, and manage training. The training material should include:
1. General understanding of ADS-B In operations.
2. Correct flight planning codes for IM operations, including the aircraft identification. A correct aircraft identification in the flight plan is essential to the IM operation. Before ATC can commence an IM operation, the transmitted FLT ID from the lead aircraft must exactly match that from the flight plan. While filing aircraft identification refers directly to the ADS-B Out aircraft, it can adversely impact an IM operation.
3. Dispatch of aircraft with the FIM system unserviceable.
4. How flight planning codes are affected with ADS-B or FIM avionics unserviceable.
5. Equipment needed to conduct IM.
6. A NSPs and airspace where IM operations are approved.
F-14