N23708
STCs that may be installed · 830
Approved for this aircraft’s airframe or engine model. The registry doesn’t record which STCs an aircraft has; its records do. In force first, then newest.
Query with SQL
duckdb -csv -c "SELECT m.matched_by, s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
FROM (
SELECT stc_number, min(side) AS side, arg_min(matched_by, side) AS matched_by, arg_min(matched_model, side) AS matched_model
FROM (SELECT stc_number, 1 AS side, 'airframe' AS matched_by, matched_model FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet' WHERE aircraft_model_code = '13844BY'
UNION ALL SELECT stc_number, 2, 'engine', matched_model FROM 'https://openairdocs.org/data/latest/faa_engine_model_stc.parquet' WHERE engine_model_code = '13802')
GROUP BY stc_number
) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
ORDER BY m.side, s.status = 'Current' DESC, s.status_date DESC, s.stc_number"Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT m.matched_by, s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
FROM (
SELECT stc_number, min(side) AS side, arg_min(matched_by, side) AS matched_by, arg_min(matched_model, side) AS matched_model
FROM (SELECT stc_number, 1 AS side, 'airframe' AS matched_by, matched_model FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet' WHERE aircraft_model_code = '13844BY'
UNION ALL SELECT stc_number, 2, 'engine', matched_model FROM 'https://openairdocs.org/data/latest/faa_engine_model_stc.parquet' WHERE engine_model_code = '13802')
GROUP BY stc_number
) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
ORDER BY m.side, s.status = 'Current' DESC, s.status_date DESC, s.stc_numberRun it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Airframe · Boeing 737-724
STC ST02892ATFor Boeing 737-700, S/N 29042, 29084, 29085, 29086, 30512 and 30513 aircraft, update of existing Flight Management Computer and installation of second Flight Management Computer to a Xiamen Airlines configuration in accordance with Cascade Aviation Services, Inc. Master Drawing List 03CAS268-MDL, Rev. New, dated May 17, 2004, or later FAA approved revision.STC ST02736ATReplacement of a Collins TPR-901 Mode S ARINC 718-4 Compliant Transponder with a Collins TPR-901 Mode S ARINC 718-A Compliant Transponder.STC ST00174BOInstallation of Goodrich Corporation Float Switch Transient Suppression Device.STC ST01162NYInstallation of Literature Pockets.STC ST09991SCInstallation of a Boeing Business Jet executive interior for the Royal Australian Air ForceSTC ST01894ATRelocation of High Frequency Tranceivers 1 and 2 (HF1 and HF2), Cockpit Voice Recorder (CVR), Flight Data Recorder (FDR), and Auxiliary Power Unit Electronic Control Unit (APUECU); and Removal of E6 Electronics Rack.STC ST00626CHInstallation of replacement immersion heater.STC ST01845NYInstallation of a VIP executive interior.STC ST01757NYInstallation of Zonal Drying System.STC ST00984SE-DInterior reconfigurationSTC ST02335ATInstallation of an Airshow 420 passenger entertainment and information system in accordance with Aircraft Engineering & Installation Services, Inc.'s Master Drawing List, Drawing Number 23-R737-100, Revision C, dated June 11, 2001, or later FAA Approved Revision.STC ST01556LAInstallation of high temperature, semi-rigid, coaxial fire/overheat detection wire harness cable assemblies in accordance with FAA approved Meggitt Safety Systems 737-600/700/800/900 Simi-Rigid, Engine Fire Cable STC Master Drawing List No. 904629, Revision A, dated July 10, 2003, or a later FAA approved revision.STC ST00958LAInstallation of Passenger Oxygen SystemSTC ST00959LAInstallation of Executive Cabin Interior, 737-700 IGW MSN #29024STC ST00960LAInstallation of Airshow Direct Television System on Boeing Business Jet 737-700 IGW.STC ST02596ATInstallation of an Arc Fault Circuit Interrupter into the anti-collision light system in accordance with U.S. Technical Master Drawing List 3804-33-000 Rev. A dated 12/19/02 or later FAA approved revision.STC ST10119SCInstallation of a Recirculating Shower in the forward lavatorySTC ST01039LAInstalation of AMSAFE Restraints System Part Number 4020-1-( )-( ) and 4020-2-( )-( ) on AMI Industries Common Wall-Mounted Flight Attendant Seats, Part Numbers 2110-( ), 2112-( ), and 2115-( ).STC ST02643ATManufacture of service carts for galley stowage.STC ST09966SCInstallation of a Reciruclating Shower in the Forward LavatorySTC ST01086WI-DInterior Wiring Provisions Modification as defined by FAA Approved Boeing Document D800-10610-29, Revision New, or later FAA approved revision. (model 737-7DM only)STC ST01087WI-DFlight DEck/Avionics Modification includes four new antenna installations (TACAN, TARS, INMARSAT, UHF/VHF) and modification to existing IFF antenna installation to add a TCAS interface.STC ST01088WI-DInstalls a passenger communication system with limited functionality as well as provisions for non-certified items accepted by the US Air Force.STC ST01089WI-DInstalls passenger data systems provisions for noncertified items accepted by US Air Force.STC ST01132SEInstallation of PTA-45B Data Printer in accordance with Master Drawing List 756-0150-001, Revision A, dated June 6, 2002, or later FAA approved revisions.STC ST00978LAInstallation of heater kit nipple p/n KH029.STC SA2607SOInstallation of coffee maker P/N 416-1001-29.STC SA2608SOInstallation of rail assembly, P/N 416-0201-15.STC SA3058SOInstallation of coffee maker 416-0001-23 and rail assembly 416-0201-5STC ST01476ATInstallation of coffee maker.STC ST01778ATInstallation of espresso maker p/n 3510-0066-01.STC ST02289ATInstallation of 'Next Generation Coffe Maker'STC ST01089LAInstallation of executive cabin interior. Approved for serial number 29233 ONLY.STC ST09999SCReduction in aircraft Maximum Zero Fuel Weight (MZFW).STC ST10000SCInstallation of a Boeing Business Jet Executive InteriorSTC ST00183LA-DInstallation of a folio storage module in the passenger cabin.STC ST02044AT-DInstallation of Collins CMU-900 ACARS Communications System and VHF-900B Transceiver in a Non-Provisioned Aircraft.STC ST01502NYCompletion of IFE Video System and Class Partition installation. Approved for installation on 737-700, serial number 30282 ONLY.STC ST02508ATManufacture of a service cart for galley stowage, P/N CAF014-101-( ).STC SA629GLInstallation of Grimes galley, Model 1545LW unit 2 and unit 4.STC ST09980SCInstallation of cabin seating area upgrades. Limited to installation on Boeing 737-700 IGW serial number 29139.STC ST01487NYInstallation of a VIP Executive Interior. Approved for model 737-700 IGW serial number 32805 ONLY.STC ST01340NYStructural provisions for installation of a vertical stabilizer tip radome. For model 737-700 IGW and 737-800STC ST00966SE-DInstallation of an interior arrangement and a fixed emergency locator transmitter (ELT).STC ST01047SEInstallation of three overhead life raft storwage compartments (Forward near Type I exit, Mid 1 and 2 near over wing Type III exit).STC ST01429NY116 passengers modification. Approved for model 737-700, serial numer 30279 and 30280 ONLY.STC ST01088LAInstallation of executive cabin interior. Approved for serial number 29054 ONLY.STC ST01332ATInstallation of Galley Service Carts.STC ST01381NYInstallation of a VIP Executive Interior. For model 737-700 IGW.STC ST00785LAInstallation of the Vacuum Toilet Assembly.