N76021
STCs that may be installed · 391
Approved for this aircraft’s airframe or engine model. The registry doesn’t record which STCs an aircraft has; its records do. In force first, then newest.
Query with SQL
duckdb -csv -c "SELECT m.matched_by, s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
FROM (
SELECT stc_number, min(side) AS side, arg_min(matched_by, side) AS matched_by, arg_min(matched_model, side) AS matched_model
FROM (SELECT stc_number, 1 AS side, 'airframe' AS matched_by, matched_model FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet' WHERE aircraft_model_code = '1385225'
UNION ALL SELECT stc_number, 2, 'engine', matched_model FROM 'https://openairdocs.org/data/latest/faa_engine_model_stc.parquet' WHERE engine_model_code = '30036')
GROUP BY stc_number
) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
ORDER BY m.side, s.status = 'Current' DESC, s.status_date DESC, s.stc_number"Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT m.matched_by, s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
FROM (
SELECT stc_number, min(side) AS side, arg_min(matched_by, side) AS matched_by, arg_min(matched_model, side) AS matched_model
FROM (SELECT stc_number, 1 AS side, 'airframe' AS matched_by, matched_model FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet' WHERE aircraft_model_code = '1385225'
UNION ALL SELECT stc_number, 2, 'engine', matched_model FROM 'https://openairdocs.org/data/latest/faa_engine_model_stc.parquet' WHERE engine_model_code = '30036')
GROUP BY stc_number
) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
ORDER BY m.side, s.status = 'Current' DESC, s.status_date DESC, s.stc_numberRun it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Airframe · Boeing 777-224
STC ST01140SEInstall an overhead flight crew rest at door 1STC ST01493SEInstallation of new seats and interior reconfigurationSTC ST01779SEInstallation of an overhead flight attendant crew rest at door 3STC ST02004SEInstallation of an overhead attendant rest above Door 3STC ST02032SEInstallation of an interior reconfigurationSTC ST02061SEInstallation of an interior reconfigurationSTC ST02165SEInstallation of Overhead Attendant Rest above Door 3STC SA7076NMInstallation of Stretcher Carrier.STC ST02445ATInstallation of external door, access panel and window security locks.STC ST02176SEInstallation of an interior reconfigurationSTC ST11055SCInstallation of an IMS RAVE seat-centric IFE systemSTC ST00679DEInstallation of one 32-inch and three 47-inch LCD monitors, center monument mounted, for Boeing 777-200 both labor Market and Business market configurations and three 42-inch LCD monitors for Boeing 777-300 configuration (Standard Definition or High Definition System)STC ST02462SEInstallation of an Interior Reconfiguration.STC ST02876CHInstallation of BE Aerospace, Inc., Vacuum Toilet Assembly Retrofit Kit in accordance with BE Aerospace, Inc., Installation Instructions as listed on AML No. ST02876CH, or later FAA approved revisions.STC ST03290NYWireless Broadband System InstallationSTC ST02115SEIn-Flight Entertainment retrofitSTC ST02540LAInstallation of Telair International LLC light weight P/Ns PMC100 and PAG100 series cargo palletsSTC ST02489LAInstallation of Telair International Inc. light weight LD3 (NAS3610 / SAE36100 - 2K2) cargo container P/N LD3100-31000ZZZSTC ST02268SEInstallation of an Interior ReconfigurationSTC ST03453CHInstallation of an interior reconfiguration from 12 First Class/ 35 Business Class/ 232 Tourist Class seating arrangement to a 6 First Class/ 35 Business Class/ 34 Economy Plus Class/ 204 Tourist Class seating arrangementSTC ST02257SEInterior reconfigurationSTC ST03619ATInstallation of an EMS Technologies HD-710 High Speed Data Terminal/High Power AmplifierSTC ST03619TInstallation of an EMS Technologies HD-710 High Speed Data Terminal/High Power Amplifier into a Boeing 777-200 and 777-300 Series Aircraft and associated hardwareSTC ST00751DEInstallation of an e-Enabled systemSTC ST01771WIModification of Rockwell Collins, Inc. Tailwind 500/550 Satellite TV SystemsSTC ST01876LAInstallation of Continuous CO2 Measurement and Automatic Air Sampling Atmospheric Observation SystemsSTC ST03487NYInstallation of the AVOX LavOx Passenger Lavatory Oxygen System.STC ST02401SEInterior reconfiguration of Singapore Airlines Boeing Model 777-200 aircraftSTC ST02919NYInstallation of a Heath Tecna Cabin InteriorSTC ST03483ATInstallation of a Portable Beverage Dispensing System, P/N B43-FA-001.STC ST03384NYInstallation of Zonal Drying SystemSTC ST00526WI-DModification of Collins VHF COMM Receiver InstallationSTC ST00300BOInstallation of an Electronic Flight Bag (EFB) systemSTC ST10972SCInstallation of an Iridium Communications SystemSTC ST10974SCInstallation of a Terminal Wireless Local Area Network UnitSTC ST01899SEInstallation of IFE and ISPS on economy class seatsSTC ST03350NYActivation of OnAir GSM/Internet systemSTC ST03178CHCertification of Compatibility with Cellular and Wireless Data TechnologiesSTC ST03332NYInstallation of provisions of OnAir GSM/Internet systemSTC ST11039SCInstallation of half size meal trolleys, part numbers TL567001 and TL567003STC ST02243SEInstallation of an interior modificationSTC ST02263SEInstallation of coffee maker 2420AR100-001STC ST03079NYInstallation of AFIRS 228 SystemSTC ST03105NYEconomy Class Seat ReconfigurationSTC ST10159SC-DInterior reconfiguration.STC ST02261SEInstallation of an interior modificationSTC ST03237NYInstallation of New Cabin InteriorSTC ST01802SE-DInstallation of an interior reconfigurationSTC ST02339LAThe alteration replaces the existing Cockpit Voice Recorder (CVR) with a Honeywell Two-Hour CVRSTC ST02428LAModification of existing Thales Avionics IFS TopSeries In-flight Entertainment (IFE) System