N796FT, cancelled Oct 27, 2004
Service difficulty reports · 83
Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model. Newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE n_number = 'N796FT' AND deregistration_id = 'N796FT-2004-10-27' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE n_number = 'N796FT' AND deregistration_id = 'N796FT-2004-10-27' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR RRXA010020Fire Loop · malfunctionedSHORTLY AFTER DEPARTURE FROM IAH, EB127/796FT AIR RETURNED TO IAH DUE TO NR 4 FIRE WARNING. REPLACED O/B LOOP ASSY ON LOWER FAN CASE, ADJUSTED WIRE BUNDLES NEXT TO START VALVE DUCT. RAN ENGINE NO MALFUNCTION FOUND. DID BLEED AIR LEAK CHECK. NO LEAK NOTED. SDR RRXA010023Fire Loop · intermittentINTERMITTENT SHORT AND FIRE INDICATION ON NR 4 ENGINE, SHUTDOWN NR 4 ENG PER QRH 1 BOTTLE DISCHARGED. REMOVED AND REPLACED ALL 5 FIRE LOOPS. OPS CKS NORMAL IAW 26-10-1.SDR RRXA002864Structure · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE AND SHEARED FASTENERS ON THE LWR SURFACE AT THE I/B SIDE ON THE LT WING O/B AILERON, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED PART AND INSTALLED IAWSDR RRXA002863Skin · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE LT WING LWR SKIN AT A FASTENER HOLE AT STA XFS 435, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW SERVICE REWORK DWG 08570013 ANSDR RRXA002862Skin · crackedDURING A MAINTENANCE VISIT FOUND A CRACK AT A FASTENER HOLE AT THE LWR L/E CAP AT THE FWD SPAR ATTACHMENT ON THE RT WING L/E 6 INCHES I/B OF STA XFS 710, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED ASDR RRXA002861Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE BOTTOM OF THE FUSELAGE WHERE THE NR 1 ADF ANTENNA MOUNTS, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0SDR RRXA002860Floorbeam · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FLOORBEAM AT FS 920 AND LBL 48 - 53, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED IAW DALFORT AEROSPACE LP XEA X8-53-880 REVSDR RRXA002859Floorboard · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FLOOR PLANK AT FS 41 - 58 AND LBL 31 - LBL 44, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0. (CORROSISDR RRXA002858Frame · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FRAME AT FS 25 AND STR 36, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0 AND 51-1-20D. (CORROSION DAMASDR RRXA002857Skin · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE INNER SKIN OF THE NR 2 ENGINE I/B THRUST REVERSER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 78-31-10.SDR RRXA002856Floorboard · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE LOWER SIDE OF THE FLOOR WEB AT FS 25 - 55 AND LBL 57, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0. (SDR RRXA002855Shear Tie · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE SHEAR TIE AT FS 640 AND STR 27R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0.SDR RRXA002854Angle · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE ATTACH ANGLE AT THE LT WING T/E FLAP WELL PANEL AT STA XCW 69.5, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 51-1-4 ASDR RRXA002853Shear Tie · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE SHEAR TIE AT FS 640 AND STR 27L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0.SDR RRXA002852Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE WEB AT FS 70 AND STR 21R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0 AND 51-1-21.SDR RRXA002851Floorboard · crackedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE AND A CRACK TO THE FLOOR PLANK AT FS 1020 - 1023 AND RBL 17, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0. (SDR RRXA002850Floorbeam · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FLOORBEAM ON THE FWD AND AFT FLANGES AT FS 940 AND RBL 53, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED IAW DALFORT AEROSPACSDR RRXA002849Lever · crackedDURING A MAINTENANCE VISIT FOUND A CRACK AT THE NECK DOWN AREA WITH HFEC ON THE NR 1 THROTTLE LEVER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED PART AND INSTALLED IAW DC-8 SRM 51-1-21.SDR RRXA002848Angle · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE SUPPORT ANGLE IN THE LT W/W FOR THE SPOILER MIXER ASSY, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 51-1-21.SDR RRXA002847Fitting · crackedDURING A MAINTENANCE VISIT FOUND A CRACK ON THE LT WING FLAP HINGE SUPPORT FITTING ASSY ON O/B SIDE OF FITTING AT STA XF 409.667, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED AND INSTALLED NEW PART IAW SDR RRXA002846Fitting · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE LONGERON END FITTING AT FS 8 AND L30R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED PART AND INSTALLED IAW DC-8 SRM 51-1-20D.SDR RRXA002845Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK ON THE FRAME AT FS 260 AND STR 33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0.SDR RRXA002844Lever · crackedDURING A MAINTENANCE VISIT FOUND A CRACK AT THE NECK DOWN AREA WITH HFEC ON THE NR 1 THROTTLE LEVER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. RECEIVED PART AND INSTALLED IAW DC-8 SRM 51-1-21.SDR RRXA002843Angle · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE SUPPORT ANGLE IN THE LT W/W FOR THE SPOILER MIXER ASSY, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED PART IAW DC-8 SRM 51-1-21. SDR RRXA002842Fitting · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE LT WING FLAP HINGE SUPPORT FITTING ASSY ON THE O/B SIDE OF FITTING AT STA XF 409.667, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED PART AND INSTALLED IAW SDR RRXA002841Fitting · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE END FITTING OF LONGERON 30R AT FS 8, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8S RM 51-1-8. RECEIVED PART AND INSTALLED IAW DC-8 SRM 51-1-20D.SDR RRXA002840Floorboard · crackedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE AND A CRACK TO THE FLOOR PLANK AT FS 1260 AND LBL 17, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0.SDR RRXA002839Seat Track · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE SEAT TRACK AT FS 770 AND BL 0, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-3. (CORROSION DAMAGE RECORDSDR RRXA002838Skin · crackedDURING A MAINTENANCE VISIT FOUND A CRACK AT FASTENER HOLE ON THE RT WING L/E LWR SURFACE AT STA XFS 301.888, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED IAW DALFORT AEROSPACE LP XESDR RRXA002837Pressure Panel · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE RT WHEEL WELL PRESSURE FLOOR AT FS 930 - 943 AND RBL 56 - 64 WL-1, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED IAW DALFORT SDR RRXA002836Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE FRAME AT FS 260 AND STR 33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0.SDR RRXA003414Floor Panel · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE AT FWD LAV AREA BETWEEN STA'S 35.000 AND 55.000 AND X-44 AND -66, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED PART AND INSTALLED IAW DC-8 SRM 51-20-01 SDR RRXA003415Stringer · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FWD AND AFT END OF STRINGER AT STA 35 TO 55 AND STR 26R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 51-1-20SDR RRXA003452Floorboard · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FLOORBOARD PLANKS NEAR LAVATORY AT FS 41-57, X-31 TO -44, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED IAW DC-8 SSDR RRXA003450Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE UNDER 'A' BIN CROSSSLIDE DOOR BILGE AREA AT FS 280-360, X54-X30, Z-34 TO -50 AND L27L TO L31L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8.SDR RRXA003459Doubler · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE BOTTOM OF FUSELAGE WHERE NR 2 ADF ANTENNA IS MOUNTED AT FS 136 TO 160 AND L35L TO L35R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8.SDR RRXA003458Doubler · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE ATC TRANSPONDER ANTENNA PLATE AND RING AT FS370.5 TO 379.5 AND L35.8L TO 35.8R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. RECEIVED PARTS ANDSDR RRXA003457Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE BOTTOM SIDE OF FUSELAGE WHERE NR 1 ADF ANTENNA MOUNTS AT FS X360 TO 380, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTSDR RRXA003456Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE AT THE AFT LWR BAG BIN AT CROSSSLIDE BILGE AREA AT STA 1214 TO 1220, X6 TO -6 AND L36, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. CORROSION DAMAGE WISDR RRXA003455Shear Tie · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE AFT PIT INTERCOSTAL STR 31L O/B FACE BETWEEN STA'S 1340-1360 , DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. CORROSION DAMAGE WITHIN LIMITS.SDR RRXA003454Frame · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE AFT PIT LOWER CAP OF FRAME FWD AT FS 1020-1040 AND STR 35R-35L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. RECEIVED PART AND INSTALLED IAW DCSDR RRXA003453Floorbeam · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE LOWER PORTION OF FLOOR BEAM AT STA 920, X-48 TO -53 AND Z-4 TO -7, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED.SDR RRXA003416Stringer · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE ON STRINGER AND PNEUMATIC DUCT SUPPORT AT STA 25 TO 35, STR 25R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. MATERIAL LOSS WAS WITHIN LIMITS IAW DC-8 SRM 53-2-0SDR RRXA003449Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE INNER SKIN AT STA 30 AND STR 27L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. MATERIAL LOSS WITHIN LIMITS. (CORRSDR RRXA003448Floor Panel · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE LWR SIDE OF FLOOR AT STA 25-55 AND LBL 51, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED PART IAW DC-8 SRM 51-3-0.SDR RRXA003447Stringer · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FWD AND AFT END OF STRINGER REPAIR AT STA 35-55 AND STR 26R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DSDR RRXA003446Floorbeam · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FWD UPPER FLANGE OF FLOOR BEAM AND LOWER SIDE OF FLOOR AT STA 45-55 AND LBL15-30, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. MATERIAL LOSS WISDR RRXA003445Floorbeam · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FWD UPPER FLANGE OF FLOOR BEAM AND LOWER SIDE OF FLOOR AT STA 55-57 AND LBL10 TO RBL10, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8.SDR RRXA003444Stringer · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO STRINGER 25R AND PNEUMATIC DUCT SUPPORT AT STA 25 TO 35 AND STR 25R, DAMAGE EXCEEDEDN LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. CORROSION DAMAGE WITHIN LIMITS.SDR RRXA003443Stringer · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO STRINGER 31R AT STA 660, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. CORROSION DAMAGE WITHIN LIMITS.
Back to N796FT, cancelled Oct 27, 2004