JASC 5310
Service difficulty reports · 38,528
Reports filed under 5310 · Fuselage Main, Structure, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5310' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5310' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR LR7A2024032803398Cap · crackedDURING SCHEDULED C-4 CHECK WHILE PERFORMING OTHER MAINTENANCE, FOUND LOWER FRAME CAP CORRODED AT FS657, LBL62-RBL62, WL146. / REPAIR BY REPLACEMENT ACCOMPLISHED IAW LOCKHEED SMP583 SRM, CH. 51-60 & 51-70. NR# 1001086591.SDR LR7A2024032803391Cap · damagedDURING SCHEDULED C-4 CHECK WHILE PERFORMING SP-303, FOUND RH CHINE CAP 10K D-RING HOLES WITH FREEZE PLUGS AT RBL59.7, FS257.0E, 337.0E, 537 & 577, WL146. / REPAIRED IAW LAC MEA 382-53-24-003. NR# 1001086505. / PSE# 53-40-10, AD 2012-06-09SDR LR7A2024032803390Cap · damagedDURING SCHEDULED C-4 CHECK WHILE PERFORMING SP-303, FOUND LH CHINE CAP 10K D-RING HOLES WITH FREEZE PLUGS AT LBL59.7, FS537 &577, WL146. / REPAIRED IAW LAC MEA 382-53-24-003. NR# 1001086504. / PSE# 53-40-10, AD 2012-06-09SDR R61A2024032800131Beam · corrodedWHILE IN HEAVY CHECK - FORWARD SERVICE DOOR FUSELAGE CUT OUT STRUCTURE LOWER HORIZONTAL BEAM CORRODED UNDER THE AFT GIRT BAR FITTING. REPLACED FORWARD SERVICE DOOR FUSELAGE CUT OUT STRUCTURE LOWER HORIZONTAL BEAM REF EMB SRM 51-40-08.SDR AALA202406124799Fitting · crackedAIRCRAFT IN BASE MAINTENANCE: THE FLIGHT DECK CENTER WINDSHIELD FRAMING RIGHT HAND CONTINUITY FITTING BETWEEN FR 2 AND FR 3 AT Y0 IS CRACKED. MAINTENANCE REPLACED THE RIGHT HAND CONTINUITY FITTING PER EA 352961 AND EO 5319Y17-002.SDR AALA202406126212Window Frame · crackedAIRCRAFT IN BASE MAINTENANCE: THE FLIGHT DECK CENTER WINDSHIELD RIGHT HAND FRAMING HAS 2 CRACKS LOCATED AT THE CENTER POST LOWER NODE ATTACHMENT INTERNAL AREA AT THE UPPER TENSION BOLT FASTENER HOLE AND AT THE INBOARD LOWER RADIUS BETWEEN FR 2 AND FR 3 AT Y0. SDR AALA202406112333Window Frame · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED FLIGHT DECK LATERAL WINDSHIELD FRAME RIGHT HAND UPPER HORIZONTAL STIFFENER AT FR 4 AND -Y765. REPLACED FRAME PER EA 353147.SDR IPXA2024041599046Tee Fitting · corroded*** SUPPLEMENTAL SDR *** FAULT: THE CROSS-FLOOR SUPPORT TIE AT STA 1060 LBL ZERO HAS INITAIL SIGNS OF CORROSION. DOT 39-03 INSTALLED SUPPORT FLOOR P/N 144N5005-5 I.A.W. SRM 51-40-02 FASTENRES USED:MS20426AD3-12 BTCH: 0004238822, BACN10JZ3A2U BATCH:004200335.SDR IPXA2024041594591Tee Fitting · corroded*** SUPPLEMENTAL SDR *** FAULT: WTB STRUCTURE - T-CHORD STA 1220 LH HAS CORROSION APPLIED TOPCOAT NEW T-CHORD I.A.W AMM51-21-15 PAINT CUP. #: 02-012-176.SDR CALA2024040300942Door Frame · crackedEMERGENCY EXIT HATCH R/H AFTB HAS CRACKS ON SUPPORT FRAME. REMOVED & REPLACED THE FRAME SEGMENT ON RH AFT EMERGENCY HATCH IAW A 320 SRM 51-72-11-911-001.SDR AALA202404010523Stop Fitting · out of adjustAIRCRAFT IN BASE MAINTENANCE: DURING POST CHECK TEST FLIGHT CREW REPORTED DOOR R1 HAD VIBRATION ABOVE DOOR. MAINTENANCE ADJUSTED DOOR STOP SCREWS PER AMM 52-11-00.SDR AALA202404017443Track · lack of lubeAIRCRAFT IN BASE MAINTENANCE: FIRST OFFICERS SLIDING WINDOW HANDLE MAKES LOUD SPRINGING SOUND WHEN LATCHING CLOSED. MAINTENANCE LUBRICATED THE SLIDING WINDOW TRACK PER AMM 12-22-56.SDR FDEA202403270384Crease Beam · corrodedMAIN DECK, RIGHT CREASE BEAM HAS CORROSION BETWEEN STA.1260-1280. REMOVED CORROSION CREASE BEAM AT STA 1260 TO 1280 IAW B757 SRM 51-10-02-0G, EVALUATED AREA FOUND TO BE OUT OF LIMTIS BETWEEN STA 1260-1280 IAW B757 SRM 53-60-13- 1A DETAIL VIII FIG 101, REPAISDR FDEA202403270383Crease Beam · corrodedLH AFT MAIN CABIN CREASE BEAM HAS POSSIBLE CORROSION BETWEEN BS 1420 THRU BS 1640 REMOVED CORROSION AT CREASE BEAM BETWEEN STA. 1520 - 1605 IAW B757 SRM 51-10-02-0G, FOUND TO BE OUT OF LIMITS IAW B757 SRM 53-60-13-1A DETAIL VIII, REMOVED AND IINSTALLED NEWSDR DALA2024032803891Door Frame · corrodedL1 DOOR FR20 FACING FWD FOUND 8 EACH FASTENERS HOLES CORROSION THROUGH NUT-PLATE. REPAIRED PER PRI 616196-14 REV 0, REV 1, REV 2, REV 3, AND ER/A 616196-14 REV O SECTION I. (LP# 0264773)SDR DALA2024032803862Drain · crackedCRACK ON DRAIN OF LH CLEAR VIEW WINDOW AT COCKPIT. SUMMARY OF NRC 00080: LH CLEAR VIEW WINDOW RETAINER AT COCKPIT WAS REPAIRED PER ERA 616781-14 REV ORIGINAL. ASSOCIATED ER/A 14-616781 ADDED FOR AC 9514. (LP #0264952)SDR IXXA2024032702Door Frame · corrodedAPU DOOR FOUND CORROSION ON AFT FRAMESDR SWIA2024052900326Door Frame · gougedFORWARD BAGGAGE BAY DOOR AFT FRAME GOUGED ON LOWER SIDE (C-CHECK RO 5/25/2024) BLENDED-OUT NOTED GOUGE ON FORWARD BAGGAGE BAY DOOR AFT FRAME ON LOWER SIDE TO A SMOOTH CONTOUR, NDT INSPECTED NO DEFECTS NOTED RESTORED FINISH FOR COMPLETE DETAILS OF WORK PERSDR AALA202405294956Pressure Deck · crackedAIRCRAFT IN BASE MAINTENANCE: CENTER FUSELAGE PRESSURE DECK MEMBRANE HAS 2 CRACKED FASTENER HOLES AT FR 36, BETWEEN +Y1292 PLUS 2 INCHES AND +Y1292 PLUS 3 INCHES. MAINTENANCE REPAIRED PRESSURE DECK MEMBRANE PER EA 353112.SDR AALA202405241460Pressure Deck · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED CENTER FUSELAGE PRESSURE DECK MEMBRANE FASTENER HOLE 6 AND 7 AT FR 36 AND -Y1292 PLUS 3 INCHES. REPAIRED PRESSURE DECK MEMBRANE PER EA 353112.SDR JJBA20240418052Beam · corrodedCARGO LOWER BEAM FOUND CORRODED BTW FR 65-68. CARGO LOWER BEAM BTW FR 65-68 REPLACEDSDR AALA202406129253Fitting · crackedAIRCRAFT IN BASE MAINTENANCE: FLIGHT DECK CENTER WINDSHIELD FRAMING LEFT HAND CONTINUITY FITTING CRACKED BETWEEN FR 2 AND FR 3 AT Y0. REPLACED CONTINUITY FITTING PER EA 352961.SDR AALA202406126079Window Frame · crackedAIRCRAFT IN BASE MAINTENANCE: FLIGHT DECK CENTER WINDSHIELD FRAME CRACKED AT CENTER POST LOWER NODE ATTACHMENT INTERNAL AREA LEFT HAND SIDE, FROM UPPER TENSION BOLT BETWEEN FR 2 AND FR 3 AT Y0. REPLACED WINDSHIELD FRAME PER EA 352961 AND EO 5319Y017-003.SDR AALA202406117805Window Frame · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED FLIGHT DECK WINDSHIELD FRAMING LEFT HAND WINDSHIELD SIDE POST UPPER ATTACHMENT AT OPEN FASTENER HOLE COMMON TO LATERAL WINDOW FRAME AND VERTICAL FLANGE OF FITTING AT FR 4 AND Y765. REPLACED FRAME PER EA 353141.SDR IPXA2024041560472Tee Angle · corrodedWTB STRUCTURE - T-CHORD STA 1200 -1240 LH HAS CORROSION INSTALLED NEW T-CHORD I.A.W SRM 51-40-02-0G.SDR DALA2024032703838Window Frame · crackedCRACK WAS FOUND ON FRAME ON UPPER AFT CORNER AT RH SLIDING WINDOW CUTOUT. SUMMARY OF NRC 00802: UPPER AFT CORNER AT RH SLIDING WINDOW CUTOUT WAS REPAIRED PER B717-200 SRM 56-10-02-2R PROCEDURE 1 REPAIR 1 PAR 5 FIG 201 OPTION 2 FLAG NOTE E AND F. (LP #0262080)SDR FDEA202403250370Crease Beam · corrodedMAIN DECK RIGHT SIDE CREASE BEAM, HAS CORROSION BETWEEN STA 1580-1620. REMOVED CORROSION ON CREASE BEAM IAW B757 SRM 51-10-02-0G FOUND TO BE OUT OF LIMITS AT AREA BETWEEN STA 1583-1603 RBL 64.20, IAW B757 SRM 53-60-13-1A FIG 101 DETAIL VIII, REPAIR CREASESDR DALA2024032603777Window Frame · cracked(LOG 5556924) ON WALK-AROUND F/O WNIDOW FRAME CRACKED. COMPLETED REPAIR OF CRACK PER ERA 616764-14.SDR CALA2024040200932Tee Angle · crackedRIGHT HAND AFT TI-ANGLE (FR41-FR42) KEEL BEAM SIDE PANEL HAS CRA CK AT BOTTOM FASTENER BEAM FR41-42 TI-ANGLE LOWER HOLE PER PART 2 OF THE LATEST TOTAL AIRCRAFT FLIGHT CYCLES OR 136531 TOTAL AIRCRAFT FLIGHT REVISION OF ECRA 5331-03081 ON OR BEFORE AIRCRAFT REASDR SWAA2024032667236Doubler · crackedGROUND POWER DOOR CUTOUT DOUBLER AFT EDGE FOUND CRACK<[01] PERFORMED HFEC OF THE CUTOUT REF 737 NDT MANUAL PART 6 51-00-00 PROCEDURE 23. NO DEFECTS NOTED AT THIS TIME.;[02] TRIMMED GROUND POWER DOOR SURROUND DOUBLER AS REQUIRED PER SRM 53-10-15-2R-4 ZONE 1;[03SDR DALA2024032603776Window Frame · cracked(LOG 0260024) LH #3 WINDOW FRAME CRACKED2ND FASTENER FROM BOTTOM. REPAIRED #3 LH WINDOW FRAME IAW DELTA ER/A 616263-14.SDR CALA2024032500853Lock · misinstalledON MARCH 24, 2024 WHILE PERFORMING A CABIN CHECK, 2 SERVICE, AND LIFE VEST WRITE UPS ON A/C 4022 FOUND MULTIPLE SEAT ASSEMBLY ATTACH BOLT SAFETY LOCKS NOT PROPERLY INSTALLED OR DAMAGED. WHILE TRYING TO INSTALL CLIPS THE CORRECT WAY DISCOVERED 7 ROWS OF SEATS, SDR FDEA202403220342Crossbeam · corrodedAFT CARGO COMPARTMENT CROSS BEAM FR60 CORRODED AT Y-140 ~ Y-805 REPAIRED THE AFT CARGO COMPARTMENT CORRODED CROSS BEAM FR60 AT Y-140 ~ Y-805 PER A300-600 SRM53-10-15-201 PARA.10. AND SRM 51-76-10. THIS IS A CATEGORY A REPAIR. MAJOR REPAIR IAW FEDEX GMM 6-2SDR DALA2024032603779Window Frame · cracked(LOG 0257467) #1 RH WINDSHIELD FRAME CRACKED. REPAIRED FRAME PER ERA 616794-14.SDR DALA2024032603760Door Frame · crackedAD RELATED: AA 5311-01216, LH FRAME 68 DOORSTOP FITTING #1, HOLE #1 HAS CRACK INDICATION. HOLE DIAMETER .260. ACTIONS REQUIRED PRIOR TO FURTHER FLIGHT. C/A: ACCOMPLISHED ER/A 616511-14 AD PRI REV O USING A320 SRM 53-41-12 - AS BASE REPAIR JOB COMPLETE. (LP: 02SDR FDEA202403220343Crossbeam · corrodedAFT CARGO COMPARTMENT CROSS BEAM FR56 CORRODED AT Y140 - Y1470. REPAIRED THE AFT CARGO COMPARTMENT CORRODED CROSS BEAM FR56 AT Y-140 ~ Y1470 PER SRM53-10-15-201 PARA.9 & SRM51-76-10 AND EA:6-5321-T0378696 P1. TITLE: FUSELAGE - CARGO COMP FLOOR - AFT CARGSDR FDEA202403220341Crossbeam · corrodedAFT CARGO COMPARTMENT CROSS BEAM FR63 CORRODED AT Y-140 - Y1470. REPAIRED THE AFT CARGO COMPARTMENT CORRODED CROSS BEAM FR63 AT Y-140 ~ Y1470 PER A300-600 SRM53-10-15-201 & SRM51-76-10 AND EA 6-5321-T0378732. TITLE: FUSELAGE - CARGO COMP FLOOR - AFT CARGOSDR DALA2024032503713Door Frame · crackedSHIP 3262 DISC: AD RELATED: L/H FR.68, STGR. 22, FRAME WEB HORIZONTAL FLANGE LOWER SURFACE RADIUS CRACKED APROX" 1 INCH IN LENTHG.REQUESTING REPAIR DISPOSITION.ADITIONAL ENGENIRING DOCUMENTATION IS REQUIRED, AND REPAIR MUST BE ACOMPLISHED PRIOR TO FURTHER FLIGSDR DALA2024032503711Door Frame · crackedSHIP 3262 DISC: AD RELATED: R/H FR.68, STGR. 22, FRAME WEB HORIZONTAL FLANGE LOWER SURFACE RADIUS CRACKED APROX" 1.5 INCH IN LENTHG.REQUESTING REPAIR DISPOSITION.ADITIONAL ENGENIRING DOCUMENTATION IS REQUIRED, AND REPAIR MUST BE ACOMPLISHED PRIOR TO FURTHER FLSDR DALA2024032503710Door Frame · crackedSHIP 3262 DISC: AD RELATED: AA 5311-01216, RH FRAME 68 DOORSTOP FITTING #1, HOLE #1 HAS CRACK INDICATION. HOLE DIAMETER .260. ACTIONS REQUIRED PRIOR TO FURTHER FLIGHT. C/A: ACCOMPLISHED ER/A 616531-14AD REV 0 PRI USING A320 SRM 53-41-12 AS BASE REPAIR JOB ACCOSDR AALA202405079729Fitting · crackedAIRCRAFT IN BASE MAINTENANCE: FLIGHT DECK CENTER WINDSHIELD FRAMING RIGHT HAND CONTINUITY FITTING CRACKED BETWEEN FR 1 AND FR 3 AND Y0 REPLACED CONTINUITY FITTING PER EO 5319Y017-002.SDR AALA202405074300Fitting · crackedAIRCRAFT IN BASE MAINTENANCE: FLIGHT DECK CENTER WINDSHIELD FRAMING LEFT HAND CONTINUITY FITTING CRACKED BETWEEN FR 1 AND FR 3 AND Y0. REPLACED CONTINUITY FITTING PER EO 5319Y017-002.SDR AALA202403289496Support Fitting · wornAIRCRAFT IN BASE MAINTENANCE: PASSENGER / CREW DOOR 832 UPPER SUPPORT ARM FITTING HAS MIGRATED BEARINGS / WORN AT FR 66. REPLACED SUPPORT FITTING PER AMM 52-13-12.SDR WX0A2024032531998Door Frame · damaged(MAJOR REPAIR- DISCREPANCY NOTED DURING HEAVY MX VISIT) PASSENGER COMPARTMENT, FR68 WEB LH SIDE, CRACK FOUND AT STOP FITTING #1 LOWER INBD HOLE. / PASSENGER COMPARTMENT, FR68 WEB LH SIDE AT STOP FITTING #1 LOWER INBD. HOLE PERMANENTLY REPAIRED PER SRM 53-41-12SDR SCNA20240325159Window Post · crackedUPPER POST CRACK BETWEEN WIND 1R AND 2R WAS FOUND CRACKED ON A WINDOW CHANGE. PERMANENT REPAIR INSTALLED REF 737-53-1336-01-GRP3CFG1&2-RH. WORK COMPLETED ON W/O 85892 AND ATS JOB 728977.SDR FDEA202403210336Deck Plate · gougedMAIN CABIN AFT DECK PLATE FOUND GOUGE OUT OF LIMITS AT STA 1682 LBL 7. REPAIRED AREA OUT OF LIMITS ON DECK PLATE AT STA. 1682 LBL 7 IAW B-757 SRM 53-60-51-2R REPAIR 2 ALTERNATIVE I FIG. 201. MAJOR REPAIR.SDR FDEA202403210335Deck Plate · gougedMAIN CABIN AFT DECK PLATE FOUND GOUGE OUT OF LIMITS AT STA 1711, LBL 7. REPAIRED AREA OUT OF LIMITS ON DECK PLATE AT STA 1711 LBL 7 IAW B-757 SRM 53-60-51-2R REPAIR 2 ALTERNATIVE I FIG. 201. MAJOR REPAIRSDR FDEA202403210334Crease Beam · corrodedR/H MAIN CABIN CREASE BEAM HAS CORROSION BETWEEN BS 840 THRU BS 880. MAIN CABIN CREASE BEAM BETWEEN BS 733-900 REMOVED CORROSION IAW B757 SRM 51-10-02- 0G, FOUND TO BE OUT OF LIMITS IAW B757 SRM 53-30-13-1A DETIAL VIII, REMOVED AND REPLACED SECTION CREASE BSDR DALA2024032303697Fillet · crackedSHIP 3262 DISC: FUSELAGE/LH FR68 AT STGR22L/ RADIAL FLANGE FILLET LOWER RADIUS - CRACKD I. FOLLOW ON ACTION IS REQUIRED. C/A: C/W ER/A 616511-14 (LP: 0256063)SDR DALA2024032303696Fillet · crackedSHIP 3262 DISC: DAMAGE TOLERANCE EVALUATION ( DTE ) FUSELAGE/LH FR68 AT STGR22L/ RADIAL FLANGE FILLET LOWER RADIUS - CRACK. C/A: C/W ER/A 14-616511. (KP: 0256059)
Back to JASC 5310