JASC 5310
Service difficulty reports · 38,573
Reports filed under 5310 · Fuselage Main, Structure, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5310' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5310' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR 07FDEA03311Fitting · misrepairedNUMEROUS FASTENERS WERE FOUND TO BE NON CONFORMING AND ELONGATED ON FITTING FRAME 12A, FRAME 12A AND CORNERS RT AND LT SIDES. REPAIR PERFORMED BY DETAILED VISUAL AND ROTO TEST INSPECTIONS IN DAMAGED HOLES, REPLACEMENT OF FITTING, CORNER SPLICE AND CORNER SDR 07FDEA03310Fitting · misrepairedNUMEROUS FASTENERS WERE FOUND TO BE NON CONFORMING AND ELONGATED ON FITTING FRAME 12A, FRAME 12A AND CORNERS RT AND LT SIDES. REPAIR PERFORMED BY DETAILED VISUAL AND ROTO TEST INSPECTIONS IN DAMAGED HOLES, REPLACEMENT OF FITTING, CORNER SPLICE AND CORNER ANGLSDR SWAA074366Crease Beam · corrodedDURING SCHEDULED 8Y CHECK, FOUND CREASE BEAM WEB CORRODED BETWEEN BS 328 AND BS 344, STR 17R. REPAIRED WEB PER SRM.SDR SWAA074325Door Frame · crackedDURING SCHEDULED MV4 CHECK, FOUND R1 DOOR CUTOUT FWD FRAME CENTER STUB FRAME CRACKED. REPAIRED FRAME PER SWA EA.SDR KCSA071328Door Frame · crackedMAIN DECK DOOR R-1 HAS STOP DRILL ON VERTICAL CHORD LOCATED AT FWD LOWER CORNER FROM PREVIOUS REPAIR THAT HAS .25 INCH LONG CRACK PAST STOP DRILL HOLE.SDR 07FDEA03290Beam · corrodedCORROSION ON AFT CARGO DOOR SILL BEAM AT FRAME 59A AND NEAR FRAME 60, OUT OF LIMIT REPAIR PERFORMED BY EXTEND THE T-SECTION AND INSTALLING FILLER/SHIM AS PER TD/K4/S1/20580/2006. ALL OTHER REQUIREMENTS AS PER SRM 53-17-18 / FIG 204. APPROVED BY EA 6-5317-992SDR 07FDEA03268Beam · corrodedHEAVY CORROSION AT AFT CARGO DOOR SILL BEAM, BETWEEN FRAME 63-63A, STRG 42-43 RT REPAIR WAS PERFORMED IAW SRM 53-17-18/FIG 205.SDR 07FDEA03262Fitting · crackedCORNER FITTING AT FRAME 30 RT IS CRACKED. REPAIR WAS PERFORMED BY REPLACEMENT OF PART IAW SRM 51-72-10.SDR USAA070709Beam · corrodedTHE 1162/1292 BEAM SEGMENT BETWEEN FR C66 & 68 HAS CORROSION. PART REPLACED WITH LIKE PART PER SRM 53-41-14; CORR TASK JA-260-53500, DEFECT SIZE: 1 INCH SQ (2 EA).SDR 07FDEA03227Beam · corrodedHORIZONTAL WALKWAY BEAM L/SIDE HAS EVIDENCE OF CORROSION AT APPROX STA 320. REMOVED CORROSION ON TOP OF LT WALKWAY BEAM FROM STA 320 TO STATION 330 AND ACCOMPLISHED ULTRASOUND THICKNESS TEST (ACCEPTABLE) IAW 727 200 SRM 53-10-4 FIG 7. MECHANICS WROTE ITEM ASSDR 07FDEA03220Structure · corrodedAFT PIT BETWEEN FRAMES 66 AND 65 T CAP NUT PLATE JUST FWD OF FRAME 66 ABOVE STRINGER 45R CORRODED UNDERNEATH. REMOVED T-CAP IAW A310 SRM 51-40-21, RECEIVED NEW PROFILE P/N A5397426020451 PO J80248.1. INSTALLED NEW PROFILE IAW A310 SRM 51-40-21 PARA 7 AND PARSDR C2XA07SH052Panel · corrodedSHV - DURING C-CHECK MAINTENANCE FOUND PANEL 197CL HAS CORRODED BONDING PLATES. MAINTENANCE REPAIRED PANEL 197CL IAW EC 5750-01315 REV D. AIRCRAFT WAS APPROVED TO RETURN TO SERVICE.SDR C2XA07SH054Panel · corrodedSHV - DURING C-CHECK MAINTENANCE FOUND PANEL 197 AB HAS CORRODED BONDING PLATES. MAINTENANCE REPAIRED PANEL 197 AB IAW EC 5750-01315 REV D. AIRCRAFT WAS APPROVED TO RETURN TO SERVICE.SDR C2XA07SH053Panel · corrodedSHV - DURING C-CHECK MAINTENANCE FOUND PANEL 197 DR HAS CORRODED BONDING PLATES. MAINTENANCE REPAIRED PANEL 197 DR IAW EC 5750-01315 REV D. AIRCRAFT WAS APPROVED TO RETURN TO SERVICE.SDR C2XA07SH055Panel · corrodedSHV - DURING C-CHECK MAINTENANCE FOUND PANEL 193 AAB WITH BAD BONDING PLATES. MAINTENANCE REPAIRED PANEL 193 AAB IAW EMB 145 EC 5750-01315. AIRCRAFT WAS APPROVED TO RETURN TO SERVICE.SDR COEA0707821Crease Beam · damagedFOUND DURING HEAVY CHECK. FOUND TOOLING DAMAGE FIVE PLACES ON CREASE BEAM WEB. FABRICATED AND INSTALLED REPLACEMENT CREASE BEAM WEB. (K)SDR COEA0703900Crease Beam · corrodedLEVEL 2 CORROSION IN HEAVY CHECK: FLIGHT DECK CREASE BEAM AT FRAME 10-13 RT SIDE ANGLE HAS SURFACE CORROSION. REMOVED AND INSTALLED NEW CREASE BEAM ANGLE AT FRAME 5-13 RT SIDE. WO NR 69312, NR100016. (K)SDR COEA0702900Crease Beam · corrodedFOUND LEVEL 2 CORROSION IN HEAVY CHECK: FLIGHT DECK CREASE BEAM AT FRAME 13 LT SIDE. INSTALLED FABRICATED CREASE BEAM ANGLE AT FRAME 13. WO NR 69312, NR 100015. (K)SDR 07FDEA04012Door Frame · corrodedAFT CARGO COMPARTMENT DOOR FRAME FOUND CORRODED, FR59A, BETWEEN STRG27 RT AND 36 RT. THE AFFECTED FRAME WAS REPAIRED BETWEEN STRG 27-36RT.SDR VNAA0708021Structure · damagedCREW REPORTED A BIRD STRIKE TO THE RIGHT SIDE OF THE NOSE AREA. MAINTENANCE INSPECTED AND CONFIRMED THE BIRD STRIKE HAD DONE EXTENSIVE DAMAGE TO THE NOSE AREA. THE AIRCRAFT WAS TEMP. REPAIRED AND FERRIED FOR FURTHER EVALUATION AND REPAIR. MAINTENANCE REPASDR 07FDEA03200Beam · corrodedHORIZONTAL WALKWAY BEAM R/SIDE STATION 320 HAS EVIDENCE OF CORROSION. REMOVED CORROSION ON TOP OF RT WALKWAY BEAM FROM STA 328 TO STATION 336 AND ACCOMPLISHED ULTRASOUND THICKNESS TEST (ACCEPTABLE) REFERENCE 727-200 SRM 53- 10-4 FIG 7.SDR USAA070675Door Frame · crackedBS 492.4 STR 24R FWD CARGO DOOR FRAME HAS CRACK. DEFECTIVE PART REPLACED WITH IDENTICAL PART; INSTALLED NEW FRAME PER SRM 5-40-00, 53-00-53, DEFECT SIZE: .75 INCH.SDR COEA0739821Crease Beam · corrodedFOUND DURING HEAVY CHECK. MAJOR REPAIR. LEVEL 2 CORROSION ON LT OB FLOORBOARD ANGLE, COMMON TO CREASE BEAM. SPLICED IN NEW REPLACEMENT ANGLE SECTION FROM FRAME 34L TO FRAME 36L. WO 72242, NR 200056. (K)SDR COEA0732821Crease Beam · gougedFOUND DURING HEAVY CHECK. MAJOR REPAIR: TOOL DAMAGE (DRILL STARTS) 10 PLACES TO RT CREASE BEAM WEB UPPER SIDE. 5 ON PLACES TO WEBS ON FORWARD SECTION AND 5 PLACES TO WEBS ON AFT SECTION. REMOVED AND REPLACED WEBS. CREASE BEAMS PN FWD S53575110201, AFT S535SDR COEA0714821Crease Beam · damagedFOUND DURING HEAVY CHECK, MAJOR REPAIR, FOUND TOOLING DAMAGE ONE PLACE ON UPPER SURFACE OF CREASE BEAM WEB. FABRICATED REPLACEMENT CREASE BEAM WEB. (K)SDR COEA0726821Crease Beam · damagedFOUND DURING HEAVY CHECK. FOUND TOOL DAMAGE TO CREASE BEAM WEB ON UPPER SURFACE BETWEEN FR 28B, 28C. REMOVED AND INSTALLED NEW FABRICATED WEB. (K)SDR COEA0719821Crease Beam · corrodedFOUND DURING HEAVY CHECK. FOUND LEVEL 2 CORROSION LT CREASE BEAM CORD ANGLES UPPER SURFACE. REPLACED CREASE BEAM ANGLES. (K)SDR COEA0713821Crease Beam · damagedFOUND DURING HEAVY CHECK. FOUND TOOLING DAMAGE 3 PLACES ON CREASE BEAM WEB. FABRICATED REPLACEMENT CREASE BEAM WEB. WO NR 72242, NR 200063. (K)SDR COEA0712821Crease Beam · damagedFOUND DURING HEAVY CHECK. FOUND TOOLING DAMAGE 3 PLACES ON CREASE BEAM WEB. FABRICATED REPLACEMENT CREASE BEAM WEB. (K)SDR COEA0711821Crease Beam · damagedFOUND DURING HEAVY CHECK. FOUND TOOLING DAMAGE (5) PLACES ON CREASE BEAM, WEB. FABRICATED REPLACEMENT CREASE BEAM WEB. (K)SDR GLBA20060992Angle · crackedRT HEAVY ANGLE CRACKED APPROXIMATELY 1.5 INCHES AT FS 288.0. MAINTENANCE INSTALLED DOUBLER ON RT HEAVY ANGLE IAW. SRM 53-90-23. REPAIR APPROXIMATELY 13.8 INCHES IN LENGTH FROM NEW HEAVY ANGLE.SDR CALA0700459Door Frame · corrodedINSPECTION FOUND C-2 DOOR CUTOUT CORRODED AT LOWER AFT CORNER ON BELTFRAME AT STA 847, S25R TO S26R. THE FRAME WAS REPLACED IAW ECRA 5310-04652.SDR COEA0747821Crease Beam · corrodedFOUND DURING HEAVY CHECK, MAJOR REPAIR AND LEVEL 2 CORROSION ON RT CREASE BEAM, IB ANGLE WHERE IT ATTACHES TO FRAME 27. REPLACED WITH NEW, THE FWD END OF THE CORD ANGLE. CUT OFF THE FWD 20 INCHES OF THE ANGLE AND ADDED A SINGLE SPLICE TO THE ANGLE AT THE CUTSDR COEA0759821Crease Beam · corrodedFOUND DURING HEAVY CHECK. LEVEL 2 CORROSION: CORROSION ON SEVERAL ANGLES ALONG SIDE WALLS WHERE THE FLOOR MEETS FRAMES. 1 IN THE COCKPIT AND 2 IN THE CABIN. REMOVED AND REPLACED THE FOLLOWING STRUCTURES. COCKPIT, FR 13R AND STR 14R CREASE BEAM ANGLE TIE PNSDR COEA0753821Crease Beam · corrodedFOUND DURING HEAVY CHECK. LEVEL 2 CORROSION: FOUND CORROSION ON THE FOLLOWING RT CREASE BEAM SUPPORTS. INNER CORD ANGLE FROM FRAME 16 TO 18R AND IB SUPPORT CHANNEL BETWEEN FRAMES 16 AND 17R FROM FR 36 TO 38R. REPLACED CORD ANGLE PN S53373000212 AND CHANNEL SDR COEA0752821Crease Beam · corrodedFOUND DURING HEAVY CHECK. LEVEL 2 CORROSION: FOUND CORROSION ON THE FOLLOWING CREASE BEAM WEBS. LT CREASE BEAM, 2 WEBS FROM FR 39 TO 41. RT CREASE BEAM, 1 WEB FROM FR 39 TO 40. REPLACED WEBS, LT PN S53671217334, AND S53671217316. RT PN S43671318210. (K)SDR 07FDEA03111Angle · crackedFWD PIT BILGE BODY SKIN STIFFENER IS BUCKLED/CRACKED, BS 720B PLUS 13" 5", IB OF STR 28R, WL 148. REMOVED DAMAGE SUPPORT ANGLE AND INSTALLED NEW SUPPORT ANGLE, REF BOEING DWG NR 65-54577 AND SRM 51-30-2, THIS IS CLASSIFIED AS A MAJOR REPAIR.SDR 07FDEA03101Shear Plate · corrodedCORRODED SHEAR PLATE ANGLE IN BILGE AREA FRAME 54.2-55/58, STRG.45 RT REPAIR PERFORMED BY REMOVING CORROSION AND REPLACEMENT OF ANGLE IAW SRM 51-52-10.SDR A6WA200740531Support Beam · crackedCARGO DOOR SUPPORT BEAM LOWER ANGLE, P/N 601R35050-109, CRACKED IN RADIUS APPROX 1.2 INCHES LONG. MAINTENANCE REMOVED AND REPLACED BRACKET (ANGLE) P/N 601R-35050-109 IAW CRJ 200 SRM 51-42-21. (M)SDR 2007UALA03359Crease Beam · damagedCREASE BEAM INNER CHORD AND WEB CRACKED AT BS 616R RBL 64. MAJOR REPAIR ACCOMPLISHED: REMOVED DAMAGED SECTION OF INBOARD CHORD. FABRICATED & INSTALLED ANGLE REPAIR. REMOVED DAMAGED WEB. FABRICATED & INSTALLED REPLACEMENT WEB.SDR 2007UALA03351Door Frame · crackedFWD ENTRY DOOR AFT FRAME STOP SIXTH STOP FITTING CUTOUT HOLE FRAME CRACKED. MAJOR REPAIR ACCOMPLISHED: REMOVED CRACK. INSTALLED ANGLE REPAIR.SDR 2007UALA03348Door Frame · crackedFWD CARGO DOORWAY CUTOUT, AFT FRAME IS CRACKED AT LWR STOP FITTING. MAJOR REPAIR ACCOMPLISHED: REMOVED & INSTALLED NEW FRAME.SDR 2007UALA03347Door Frame · crackedAFT CARGO DOOR CUTOUT, FWD FRAME IS CRACKED AT LWR STOP FITTING. MAJOR REPAIR ACCOMPLISHED: REMOVED & REPLACED FWD FRAME BS 794.SDR 07FDEA03080Beam · crackedMAIN CARGO DOOR SPOOL NR 7, AFT OUTBOARD ATTACH HOLE SHOWS SIGN OF CRACK INDICATION IAW NTSPM 06-10-01.0003 REAMED HOLE UP TO .520 AND ACCOMPLISHED A BHEC INSPECTION. NO CRACK NOTED IAW NTSPM 06-10-01.0003. FABRICATED, INSTALLED AND REAMED TO SIZE REPAIR BUSDR 07FDEA03033Scoop · crackedINT CAC CRACK ON SUGAR SCOOP. REPAIR AREA IAW SRM 53-40-00 VOL I FIG 8.SDR 07FDEA03028Beam · corrodedFWD CARGO COMPT BILGE AREA ON BEAM FOUND SEVERE EXFOLIATION CORROSION. REPAIRED AREA IAW SRM 53-60-01 VOL 1 FIG 3.SDR 07FDEA03020Structure · damagedFOUND DAMAGED HOLES (COUNTERSUNK) IAW SB A300-53-6063 AT C40-41 RT, HOLE 24, 25, 26 AND 27. REPAIR PERFORMED BY REMOVING FASTENERS, ROTO-TEST AND INSTALLING FASTENERS HL13VF10 WITH NEW COUNTERSUNK IAW EA 6-5315-103324.SDR 07FDEA03017Structure · damagedFOUND OLD TOOLING MARKS AT GANTRIES 4 AND 5 RT AND 5 LT, FRAME 47-48. REPAIR PERFORMED WITH SMOOTH REWORK AND INSTALLING CORNER ANGLES AND STRAPS IAW EA 6-5315-103326 AND RAS: 046958/010/2006 ISS "A".SDR UPS07850538Doubler · failedINSPECTION TYPE:C2 FOUND INTERNAL DOUBLER CUT IN TWO PLACES L28R, STA 1720. REMOVED INTERNAL DOUBLER AT STA 1720, L28R IAW SRM 51-1-21. FABRICATED AND INSTALLED REPAIR INTERNAL DOUBLER AT STA 1720 L28R IAW DWG 5649328, AND SRM 51-1-21.SDR 2007UALA03312Crease Beam · corrodedCREASE BEAM CORRODED: RT SIDE 1 INCH - 3 INCHES FWD OF STA 727E WL 208.5 STR 17R. MAJOR REPAIR ACCOMPLISHED: REMOVED & REPLACED CREASE BEAM WEB FROM STA 727D TO 727E RT SIDE.
Back to JASC 5310