JASC 5311
Service difficulty reports · 61,549
Reports filed under 5311 · Fuselage Main, Frame, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5311' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5311' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR A6WA2017010245509Frame · crackedBS 718 FRAME FLANGE CRACKED. REPAIRED THE FRAME.SDR HALA2017122700326Frame · damagedOPEN - FOUND DAMAGE ON FRAME 24 BETWEEN STRINGER 28 & 29L. HFEC DAMAGED AREA. NO DEFECTS NOTED. INTERNAL DETAILED VISUAL CHECK OK. ACCOMPLISHED U.T.SDR DALA2017122608934Frame · crackedINSPECTION FOUND ONE CRACK ON THE RT BS 903.5 FRAME INNER SURFACE AND TRANSITION RADIUS. REPAIRED THE FRAME.SDR DALA2017122408927Frame · crackedINSPECTION FOUND A CRACK APPROXIMATELY 1/4 INCH ON THE FRAME INNER TRANSITION RADIUS BS 903.5, LBL 89 BELOW WL 200. REPAIRED THE FRAME.SDR SWAA2018010918944Frame · crackedEXTERNAL FUSELAGE FAIRING ATTACH STRUCTURE FRAME CRACKED AT BS 500D, BETWEEN STR 18L TO STR 19L. R&R FRAME IAW SRM AND DWG.SDR A6WA2017010245517Frame · crackedFRAME BS 605 IS CRACKED JUST ABOVE AND BELOW STRINGER 9L IN THE CARGO BAY. REPAIRED THE FRAME IAW REO 601R-53-61-5214, REV A.SDR DALA2017122608857Frame · damagedFUSELAGE FRAME AT BS 313 BETWEEN LONGERONS 18R AND 24R DAMAGED. REMOVED DAMAGE. FABRICATED A FRAME SPLICE IAW SRM 53-03 1C AND INSTALLED THE REPAIR IAW SRM 53-03 1C.SDR DALA2017122608856Frame · damagedFRAME BS 332 BETWEEN LONGERONS 20R AND 25R DAMAGED. REMOVED DAMAGE AND FABRICATED A REPAIR IAW SRM 53-03, FIG 45. INSTALLED IAW SRM 53-03D, FIG 45.SDR DALA2017122608855Frame · damagedFUSELAGE FRAME AT BS 256 BETWEEN LONGERONS 18R AND 24R DAMAGED. CUT THE DAMAGE SECTION OF FRAME BETWEEN LONGERON 18R AMD 21R IAW SRM 53-03 FIG 2A MIP302615. PERFORMED DAMAGE CONTAINMENT REF NDTSPM06-10-01-001. NO DAMAGE NOTED. FABRICATED A FRAME SPLICE REPAISDR SCNA20171221325Frame · crackedFOUND FRAME BS 360 CRACKED BETWEEN STRINGERS 7R AND 8R COMMON TO PSU RAIL SUPPORT FASTENER HOLES. REMOVED DAMAGE AND REPAIRED.SDR DALA2017122208811Frame Angle · crackedCRACKED FRAME ANGLE ON BS 1309 BETWEEN LONGERONS 13R - 14R. A REPAIR WAS FABRICATED IAW SRM 53-03, FIG 3. AND DRAWING 9912243, REV JB, AND INSTALLED IAW SRM 51-03 FIG.3, AND 51-30-2 & 51-30-5.SDR DALA2017122208809Frame · damagedFUSELAGE FRAME AT BS 275 BETWEEN LONGERONS 18R AND 24R DAMAGED. FABRICATED A FRAME SPLICE REPAIR IAW SRM 53-03-1C.. INSTALLED FRAME SPLICE IAW SRM 53-03 1C.SDR DALA2017122208808Frame · damagedFUSELAGE FRAME AT BS 294 BETWEEN LONGERONS 18R AND 24R DAMAGED. REMOVED DAMAGE FRAME 294 BETWEEN STR 18R AND 24R CUT LINE BETWEEN STR 25R AND24R. FABRICATED REPAIR PARTS FOR SPLICE REPAIR. COMPLETED SPLICE REPAIR IAW SRM 53-03.SDR DALA2017122208806Frame Angle · crackedCRACKED FRAME ANGLE BS 1309, BETWEEN LONGERONS 13L AND 14L. FABRICATED AND INSTALLED THE SECTION OF THE FRAME AND REPAIR SPLICE SRM 53-03, FIG 3 CLASS A, DRAWING 9912243 REV JB, SRM 51-30-2, & 51-30-5.SDR YENA201712201013Frame · corrodedDURING HEAVY MAINTENANCE, CORROSION WAS DISCOVERED ON R1 FRAME 16 WEB HAS FOUR HOLES WITH CORROSION AT LATCH FITTING. REPAIRED THE FRAME WEB IAW REO-L21135 AND EC NO. A17-1181-01.SDR A6WA2017122145491Frame · crackedFRAME BS 333 BETWEEN STRINGER 2 AND 3 LEFT IS CRACKED.SDR A6WA2017122145493Frame · crackedFRAME AT BS 605 ATTACHMENT FLANGES CRACKED ABOVE AND BELOW STRINGER 9L. REPAIRED THE FRAMESDR SIMA20171219005Frame · crackedFRAME 23 CRACKED AT STRINGER 16R. REPAIRED THE FRAME IAW SRM 53-00-04, ITEM 3.SDR CALA2017122104560Frame · dentedAFT CARGO FRAME AT BS 1560 HAD TWO DENTS, JUST ABOVE STRINGER 26R. ACCOMPLISHED AFT CARGO FRAME REPAIR IAW SRM 53-00-07, FIG 201.SDR SWAA2022020710054Frame · corroded***CORROSION*** CORROSION ON AFT CARGO BAY FORWARD BULKHEAD FRAME AT BS 727+4; RBL 10 TO RBL 12; WL 155 TO WL 154. / CORROSION AT ACB FWD BULKHEAD FRAME 72714U; RBL 10 TO RBL 12; WL 155 TO WL 154. 2' X 1.5'X0.002 NO LIMITS GIVEN IN SRM; REPAIRED PER ATS ER - 1SDR SWAA2022020710053Frame · corroded***CORROSION*** CORROSION ON AFT CARGO BAY FORWARD BULKHEAD FRAME AT BS 727+4; LBL 10 TO LBL 12; WL 155 TO WL 154. / CORROSION AT ACB FWD. BULKHEAD FRAME BS 727+4'; LBL 10 TO LBL 12; WL 155 TO WL 154; REMOVED 2' X 1.5' X 0.004' NO LIMITS GIVEN IN SRM. REPAIREDSDR FOTR20171218172Frame · corrodedCORROSION FOUND IN THE FWD CARGO BAY, ON FRAME BS 500D BETWEEN STRINGERS 27L - 28L.SDR SWAA2018011018961Frame · corrodedFORWARD CARGO BAY FORWARD BULKHEAD LOWER CENTER SUPPORT CORRODED AT BS 396, RBL 18. R&R FRAME ASSEMBLY PER SRM.SDR SCNA20171218317Frame · dentedFWD CARGO BAY FRAME BS 500F FREE FLANGE IS DENTED BETWEEN STRINGERS 24 - 25L. REMOVED THE DENTED AREA FROM FRAME & REPAIRED.SDR DALA2017121908707Frame · chafedMAIN CABIN FRAME BS 1280 CHAFED, BETWEEN STRINGERS 10 AND 13R. REMOVED DAMAGE AND REPAIRED THE FRAME IAW ERA 556467-14AD, REV O.SDR EE4Y201712175414Frame · damagedFRAME BS 440 BETWEEN STRINGERS 19R AND 22R WITH OVERSIZED HOLES. REPLACED IAW MESSAGE COO-TIU-17-0005-09B DTD 22-NOV-2017.SDR SWIA201744217Frame · corrodedFRAME IS CORRODED. THE REPLACED FRAME SECTOR IAW SRM.SDR R61A201712160948Frame · corrodedWHILE IN HVY MX CHECK - AFT WET AREA BELOW FLOOR, FR 88 IS CORRODED IN FRONT OF WASTE WATER BOX ON AFT LOWER SIDE. INSTALLED FRAME 88 NEW LOWER SECTION,SHEAR CLIPS AND 2 EA STANCHIONS
BETWEEN STR26R AND 25L @ FRAME 88 REF SRM 51-40-08 ALSO RE-INSTALLED 4 EA SDR SIMA20171215010Frame · gougedGOUGE IN FRAME 60 BETWEEN STRINGER 4L AND 5L. BLENDED GOUGE, PERFORMED NDT, FABRICATED AND INSTALLED REPAIR DOUBLER AND RESTORED SURFACE PROTECTION IAW NCR EM-53-045 AND ETD 2017-145-107262.SDR C77A20171215001Frame · corrodedDURING BASIC CHECK AT EAMS, CORROSION WAS FOUND TO STRUCTURE IN THE AFT CARGO COMPARTMENT. THIS DAMAGE WAS FOUND IN THE PROCESS OF EVALUATING A PERMANENT REPAIR FOR OTHER DAMAGE TO THE WASTE BOX ASSEMBLY, THE CAUSE OF WHICH WAS A PREVIOUSLY DISCOVERED AND REPASDR FOTR20171214173Frame · corrodedCORROSION IN THE FWD CARGO BAY ON FRAME BS 500B BETWEEN STRINGERS 28R - 28L.SDR FOTR20171214171Frame · corrodedCORROSION FOUND IN THE FWD CARGO BAY, ON THE FRAME AT BS 500D BETWEEN STRINGERS 27R AND 28R.SDR FDEA201712143386Coupling · bentMAIN DECK RH SIDE AT FRAME 22 STR8 AND STR9 FRAME AND SPLICE HAS BENT. REMOVED DAMAGE COUPLING IAW A300-600 SRM 51-40-21, FABRICATED NEW COUPLING P/ FX- A53770903210 ON VTMAE TRAVELER T17/1312426 IAW SRM 53-13-13, INSTALLATION COUPLING IAW A300 SRM 51-40-44SDR FDEA201712143387Coupling · bentMAIN DECK RH SIDE AT FRAME 23 BETWEEN STR 8 AND STR9 FRAME SPLICE HAS BENT. REMOVED DAMAGE COUPLING IAW A300 SRM 51-40-21, FABRICATED NEW COUPLING P/N FX- A53770903210 ON VT MAE TRAVELER T17/132376 IAW SRM 53-13-13, INSTALLATION NEW COUPLING IAW SRM A300 SRSDR DALA2017121408622Frame · corrodedCORROSION LEVEL: 2 INTERIOR STRUCTURE AFT CHORD FOUND CORROSION AT STA 1809 BETWEEN S-39L AND S-39R OUT OF LIMITS AND REPLACED CHORD.SDR FOTR20171213174Frame · corrodedCORROSION IN THE FWD CARGO BAY, AT THE BOTTOM OF THE FRAME BS 500D, BETWEEN STRINGERS 28L - 28R.SDR JR2R20171213206Frame · crackedFRAME STA 1418 ABOVE Y DUCT CRACKEDSDR VNAA2017121399907Frame · corrodedFRAME FS 605, LOWER SECTOR, 27-26L FWD FLANGE IS CORRODED. C/A: INSTALLED FRAME SECTOR @ FS 605 IAW CRJ 200 SRM 51-42-06 AND 51-42-21.SDR VNAA2017121399904Frame · crackedFUSELAGE FS 333.0 FRAME IS CRACKED BETWEEN STGR0 AND STGR 1L. C/A: REMOVED AND REPLACED CRACKED FRAME SECTOR BETWEEN STGR 0 AND STGR 1L @ FUSELAGE FS 333.0 IAW BOMBARDIER CRJ 200 SRM REF 51-42-06.SDR VNAA2017121399903Frame · crackedFUSELAGE FS 718 FRAME IS CRACKED AT STGR 11R. C/A: INSTALLED NEW PART F.S 718 P/N 600-36030-24 IAW CRJ200 SRM 51-42-06, 51-42-21, AND 51-41-00.SDR JR2R20171212154Frame · crackedSTA 1437 RT SIDE 3 O'CLOCK POSITION FRAME WEB CRACKED. REMOVED AND REPLACED WEB AND "T" CORD IAW SRM 51-30-2 FIG 19 & FIG 20 AND 51-30-5.SDR JR2R20171212304Frame · crackedSTA 1485 LH SIDE FRAME WEB CRACKED. REPAIRED STA 1485 LH SIDE FRAME WEB IAW MD80 SRM 53-03 FIG 48.SDR FDEA201712113359Frame · crackedMAIN CABIN LT FRAME WEB STA 1681, BELOW CUSP STR 17L CRACKED APPROX 2.5 INCHES LONG (HFEC VERIFIED). REMOVED DAMAGE, FABRICATED AND INSTALLED STA 1681 FRAME REPAIR IAW EA F-5310-T033786P1 FUSELAGE -MAINFRAME -STA 1681 FRAME CRACKED AT STRINGER S-17L.SDR AALA201801199010Frame · crackedCRACK INDICATED ON FRAME 35 BETWEEN STRINGERS 29L AND STRINGER 31L. REPAIRED IAW EA 276053.SDR DALA2017121108544Frame · corrodedCORROSION LEVEL 2, CORROSION FOUND ON FRAME OUTER FLANGE, STA1241, S-16L C/W ERA 563638-14.SDR DALA2017120908543Frame · corrodedHFEC INSPECTION FOUND 01EA CRACK ON RT 859.5 FRAME INNER CHORD SURFACE AND TRANSITION RADIUS AND REPAIRED.SDR DALA2017120908542Frame · corrodedHFEC INSPECTION FOUND 01EA CRACK ON RT 903.5 FRAME INNER CHORD SURFACE AND TRANSITION RADIUS AND REPAIRED.SDR SWIA2017010444123Frame · crackedINDICATION NOTED AT LT FS 235 IN FLIGHT DECK AT THE INTERCOSTAL ATTACH POINT. (C-CHECK) RO: 01/02/2018 INSTALLED NEW SERVICEABLE FRAME IAW SRM.SDR CALA2017120804346Frame · corrodedFRAME AT STA 303.9 AFT FLANGE 2IN UP FROM FLOOR LEVEL HAS CORROSION ACCOMPLISHED INTERIM REPAIR AT FRAME STA 303.9 AFT FLANGE INNER CORD IAW UNITED ECRA 5310-07308 PART 1 INITIATE A DIP TO ACCOMPLISH INSPECTION PER PART 2 OF ECRA 5310- 07308 ON OR BEFORE THE ASDR SWAA2022020428417Window Frame · crackedWHILE ACCOMPLISHING CC#12017-53 HFEC OF OPEN HOLES COMMON TO RIGHT #3 FLIGHT DECK WINDOW FRAME FOUND SECOND HOLE FROM THE BOTTOM TO BE CRACKED RUNNING AFT. / WORK TO BE ACCOMPLISHED ON CUSTOMER CARD 8274-53
Back to JASC 5311