JASC 5311
Service difficulty reports · 61,549
Reports filed under 5311 · Fuselage Main, Frame, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5311' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5311' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR CALA2015022000115Frame · crackedFUSELAGE FRAME CRACKED BETWEEN STRINGER 8R & 9R AT STATION 727BR, INBD FASTENER HOLE. REPAIRED IAW EA 5310-04716 REV L OP 3.SDR CALA2015022000114Frame · crackedFUSELAGE FRAME CRACKED BETWEEN STRINGER 8L & 9L AT STATION 727BL, INBD FASTENER HOLE. REPAIRED IAW EA 5310-04716 REV L OP 3.SDR DALA2015021801410Angle · corrodedCORROSION ON CLIP FRAME AFT AND FWD FACE AT BS 1307 BETWEEN LONGERONS 28R - 28L. CORROSION WAS REMOVED BUT REWORKED AREA WAS OUT OF LIMITS. DAMAGE AREA WAS R & R WITH NEW REPAIR PARTS IAW SRM 53-03D, FIG 3, 51-10-3 PAR 14,21 AND 38, 51-30-2.SDR V0XD20150217059Frame · corrodedFRAME AT FS 295 BETWEEN STRINGER 26R & 25R CORRODED. REPAIRED FRAME IAW REO 670-53-21-799 REV DATED 2012-01-30.SDR CALA2015021800109Frame · crackedFUSELAGE FRAME CRACKED, BETWEEN STRINGER 8 & 9 AT STATION 500FL, INBD FASTENER HOLE. REPAIRED IAW EA 5310-04716 OP 3. SEE TASKS & WIPS FOR WORK PERFORMED.SDR CALA2015021800108Frame · crackedFUSELAGE FRAME CRACKED, BETWEEN STRINGER 8 & 9AT STATION 500HR, INBD FASTENER HOLE. REPAIRED IAW EA 5310-04716 REV L OP 3.SDR CALA2015021800107Frame · crackedFUSELAGE FRAME CRACKED, BETWEEN STRINGER 8L & 9L AT STATION 500HL, INBD FASTENER HOLE. REPAIRED IAW EA 5310-04716 REV L OP 3.SDR V0XD20150217055Frame · corrodedFS 364.00 AT STRINGER 26L CORRODED. REMOVED & REPAIRED SECTION IAW REO 670-53-21-687 REV DATED 2012-08-03.SDR V0XD20150217054Frame · corrodedCORROSION FOUND AT FS 333, STRINGER 25R. REPAIRED FRAME IAW REO 670-53-21-1160 REV DATED 2015/02/13. SEE WO 80270 WC 1081.SDR ASOA2015031112353Frame · corrodedFRAME AT FS 319.70 CORRODED BETWEEN STR 27 + 26R. UPON REMOVAL, FOUND CORROSION DAMAGE TO BE OUT OF LIMITS IAW SRM 53-21-06-101-002-A02 AND 51-21-06-001-001-A01. REPAIRED FRAME STN 319.7 IAW REO 670-53-21-799-02 BY COMPLYING WITH ECTC REO 670-53-21-799-02.SDR ASOA2015031112352Frame · corrodedFRAME AT FS 310.00 CORRODED BETWEEN STR 26L & 26R. REMOVED CORROSION AT FRAME 310.00 STG 26L & 27 IAW SRM 900 51-21-06-001-001-A01. FS 310.00, FRAME OUT OF ALLOWABLE LIMITS IAW SRM 53-21-06-101-002-A02. RECEIVED AND VERIFIED ALL WORK ACCOMPLISHED ON ECTC EASDR ASOA2015030512340Frame · corrodedFS 333.00 CORRODED BETWEEN STR 27 + 26R, FRAME. REMOVED CORROSION ON FS 333.00 FROM STR 27-26R IAW SRM 51-21-06-001-001-A01. EVALUATED TREATED LOCATION IAW SRM 53-21-06-101-002-A02. COMPLIED WITH EA 32-2015-067.SDR ASOA2015030512338Frame · corrodedFRAME CORRODED AT FS 295.00, BETWEEN STR 27 + 26R. REMOVED CORROSION AT STA 295.00 STR27 & 26R IAW SRM 51-21-06-001-001-A01. COMPLIED WITH STS EA 32-2015-065, REV NC DATED 2/20/15.SDR DALA2015021801404Frame · crackedCRACKED FRAME BS 1510 AT 1 AND 7 HRS POSITION. FRAME WAS REMOVED, DRILLED, TREATED, PAINTED, AND INSTALLED IAW SRM 51-30-02, 51-10-04, AND 51-10-3 PAR 14 AND 21 AND DWG 9911843, REV AC.SDR DALA2015021801397Frame · crackedCRACKED FRAME BS 1322 AND LONGERON 17R. FRAME REPAIRED IAW ER/A 493697-14 MA, REV "B".SDR DALA2015021701396Frame · wornWORN FRAME BS 1401 BETWEEN LONGERON 20 - 22R. FRAME REPLACED IAW SRM 53-14-4, FIG 1 AND 51-10-3 PAR 21 AND 14.SDR CALA2015021800106Frame · crackedFUSELAGE FRAME CRACKED, BETWEEN STINGER 8 & 9 AT STATION 480R, INBD FASTENER HOLE. REPAIRED FRAME IAW ECRA 5310- 04716.SDR CALA2015021800103Frame · crackedFUSELAGE FRAME CRACKED AT STATION 380R BETWEEN STRINGER 8 & 9. REPAIRED CRACKED FRAME AT STATION 380R IAW ECRA 5310 04716 REV L OP 3. ALL WIP`S & PARTIAL WORKED ARE COMPLETED.SDR SWAA2015050739431Frame · corrodedAFT CARGO COMPARTMENT FRAME CORRODED BS 1028, BETWEEN STRINGER 29R - 29L. REPAIRED FRAME IAW SRM.SDR IPXA2015030686707Frame · mechanic errorINSPECTION TYPE:4C, HOLE DRILLED THROUGH EDGE OF FRAME AND INTERCOSTAL AT STA 1712 L49R. REPAIRED FRAME AND INTERCOSTAL IAW EA 011-5310-01-A5753, REV IR AND EO MD11-5310-56881-A.SDR SWAA2015051139562Frame · corrodedAFT CARGO COMPARTMENT FRAME AFT FLANGE CORRODED AT BS 870, 6 O'CLOCK POSITION. REPAIRED FRAME IAW FAS EA.SDR SWAA2015051139561Frame · corrodedAFT CARGO COMPARTMENT FRAME LOWER FLANGE CORRODED AT BS 889, BETWEEN STRINGER 29L - 29R. REPAIRED FRAME IAW FAS EA.SDR SWAA2015032337685Frame · corrodedAFT PRESS BULKHEAD LOWER FRAME CORRODED AT BS 1016, BETWEEN STRINGER 26R - 22R. REPAIRED FRAME IAW EA.SDR COEA2015021408913Frame · corrodedHEAVY CHECK MINOR REPAIR DISCREPANCY. RT FRAME 23A AFT SURFACE HAS LEVEL 2 CORROSION STRINGER 16 - 19. REPLACED WITH OEM PARTS.SDR DALA2015021701373Frame · crackedCRACKED FRAME ANGLE BS 1437 LONGERONS 16 - 17R. FRAME ANGLE WAS REPLACED IAW DWG 9911840, REV DC AND SRM 51-30-2 , 51-30-5 , 51-10-3, PAR 21 AND 14.SDR SWIA201540773Frame · crackedFRAME AT STR 0-1L AND FS 333 HAS POSSIBLE CRACK AT TOOLING HOLE, MARKED. C-CHECK, RO 2/28/15. REMOVED DAMAGE AND INSTALLED REPAIR DOUBLER, PN; " EA 24-2015-55-1 DOUBLER", STS EA . ALL STEPS AND ITEMS COMPLIED WITH. COMPLIED WITH ST, WEIGHT OF PARTS, REMOVESDR GLBA2015021300497Frame · crackedDURING A SCHEDULED INSPECTION MX FOUND A CRACK IN THE U CHANNEL SPLICE OF THE FRAME AT FS 7654.7 AT FLOOR LEVEL, JUST FWD OF THE 5TH WINDOW BACK ON THE RT SIDE, 1.5 INCHES IN LENGTH. REPAIRED THE AFFECTED AREA AND PERFORMED ALL REQUIRED RII INSPECTIONS IAW EOSDR DALA2015021401457Frame · crackedCRACKED FRAME ANGLE BS 1380, L15L. THE FRAME ANGLE WAS REMOVED, WITH NO CRACKS FOUND AND REINSTALLED IAW SRM 51-30-5.SDR DALA2015021301237Frame · crackedDURING SPECIAL VISIT, FOUND MAIN FRAME BS 674 RT CRACKED, HFEC VERIFIED. REPAIRED IAW ER/A 530437-14MA AND AMDS WC 5310-01436-03B.SDR SWIA201540774Frame · corrodedFS 333 FRAME, LOWER SECTION FORWARD OF AVIONICS BAY DOOR, SUSPECTED CORROSION ON FWD FACE BL 0-RBL15. BUBBLING PAINT, C-CHECK, RO 2/28/15. REPLACED LOWER SECTION FRAME AT FS 333, LBL15-RBL15, PN 601R32004-55, FWD OF AVIONICS BAY DOOR, REF SRM. COMPLIED WITH SDR SWAA2015021336616Doubler · debondedFRAME DOUBLER DISBONDED AT RIB LOCATION BS 727A, BETWEEN STRINGER 1 TO 4R. REPAIRED DOUBLER IAW DWG.SDR SWAA2015033037964Frame · crackedFRAME CRACKED AT BS 360, STRINGER 8R. REPAIRED FRAME IAW EA.SDR SWAA2015032737917Frame · crackedFUSELAGE FRAME CRACKED AT STATION 360, STRINGER 8L. REPAIRED FRAME IAW EA.SDR SWAA2015031637464Frame · crackedLEFT FRAME OTBD CHORD LOWER FWD CRACKED AT BS 727. R & R CHORD IAW EA.SDR SWAA2015030937247Frame · crackedFRAME CRACKED AT BS 827, STRINGER 9L. REPAIRED FRAME IAW EA.SDR SWAA2015030937246Frame · crackedFRAME CRACKED AT BS 747, STRINGER 9L. REPAIRED FRAME IAW EA.SDR SWAA2015030937245Frame · crackedFRAME CRACKED AT BS 727D, STRINGER 9L. REPAIRED FRAME IAW EA.SDR DALA2015021201189Frame · crackedCRACKED FRAME ANGLE BS 1380 LONGERON 14L. FRAME ANGLE WAS FABRICATED AND INTALLED IAW SRM 53-14-4, FIG 1 AND 51-30-2 AND 51-30-5.SDR DALA2015021201174Frame · crackedCRACKED FRAME BS 1455, LONGERON 1. FRAME REMOVED AND REPLACED IAW SRM 51-30-2 AND 51-30-5 AND DWG 9911860.SDR HDNA201502110003Frame · crackedCRACK FOUND DURING INSPECTIONS IN TAIL CONE ON FRAME AT STATION X6616 3 O'CLOCK POSITION LOOKING IN TAIL CONE. REPAIR COMPLETED IAW FORM 8110-3 AHI15-026 DATED 1-29-2015, HELICOPTERS GMBH FORM ESDM-09 01-02, RDAS-AHI1500102 REV C DATED 01-29-2015, REPAIR DOCUSDR UHLA2015021000149Frame · misinstalledDURING INSPECTION, THE WORKING RIVETS ON FRAME 79 BETWEEN STRINGERS 4R AND 6R WERE REPLACED IAW ETD 2015-145-017668.SDR IPXA2015022186204Frame · corrodedINSPECTION TYPE:C, CHORD FRAME STA 1220 ON THE RT SIDE HAS CORROSION. CHAFED LIMITS AREA THE CORROSION IS THRU ALL THICKNESS 100 PERCENT FOUND TO BE OUT OF LIMITS IAW SRM 53-00-71-1A-1, FIG 101, DETAIL VII . REMOVED OUTER CHORD IAW SRM 51-40-02-06. RECEIVEDSDR DALA2015021101221Frame · crackedON HFEC INSPECTION OF OVERWING FRAME, BS 962, HAD A CRACK INDICATION. R & R THE FRAME, IAW AMDS 5310-01375-09 LT.SDR DALA2015021101219Frame · crackedHFEC INSPECTION OF OVERWING FRAME HAS A CRACK INDICATION. FRAME REPLACED IAW DWG SR90530027.SDR DALA2015021201180Former · crackedCRACKED FORMER ON VENTRAL PANEL SUPPORT PROJECTION STAIR TUBE TORQUE BEAM. FORMER WAS REMOVED, REPLACED, OPEN NEW HOLES TREATED AND PAINTED, AND INSTALLED IAW SRM 51-30-2, 51-10-4, 51-10-3 PAR 14 AND 21 AND 51-30-5 AND IAW DWG 9911953.SDR FDEA201502100504Frame · corrodedFORWARD CARGO COMPARTMENT BS 740, STRINGER 26 - 27R FRAME UPPER FLANGE HAS CORROSION. CORROSION WAS OUT OF LIMITS IAW SRM 53-00-07 FIG 101 DETAIL II. MAJOR REPAIR.SDR DALA2015021101135Frame · corrodedCORROSION ON FRAME AFT FACE AT BS 1287 BETWEEN LONGERONS 29R TO 28L. FRAME ANGLE WAS REPLACED IAW SRM 53-03D, FIG 3, 51-30-2, 51-10-3 PAR 14,21 AND 38.SDR SWAA2015032537777Frame · corrodedFRAME WEB CORRODED AT BS 993, STRINGER 17R. REPAIRED FRAME IAW ER & EA.SDR DALA2015021001284Frame · crackedFRAME INNER CHORD TRANSITION RADIUS CRACKED. CRACK LENGTH APPROXIMATELY 0.32" ON RT SIDE BS 903.5. L89R BELOW WL 200, REPAIRED.SDR DALA2015020901077Frame · corrodedFRAME ANGLE FOUND CORRODED AT BS 1285 BETWEEN S19 - 20R. REPLACED.
Back to JASC 5311