JASC 5312

Service difficulty reports · 20,045

Reports filed under 5312 · Fuselage Main, Bulkhead, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5312'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR SWAA2019083036444Angle · crackedLOWER VAPOR BARRIER COMPOSITE BULKHEAD UPPER ATTACH ANGLE CRACKED AT BS. 663, LBL 9. REPAIRED ANGLE PER ER AND EA.Jul 24, 2019 · N781WN · Boeing 7377H4SDR SWAA2019081936041Bulkhead Web · crackedLOWER COMPOSITE BULKHEAD CRACKED AT BS. 663, RBL 34. / REPAIRED BARRIER IAW SRM AND DWG.Jul 24, 2019 · N294WN · Boeing 7377H4SDR AALA201907259015Pressure Deck · crackedAIRCRAFT WAS GROUNDED: RIGHT HAND WHEEL WEEL FORWARD BULKHEAD PRESSURE DECK CRACKED AT BS 663.75 AT RBL 41. REPAIRED PRESSURE DECK PER SRM 57-10-10-2R-4.Jul 24, 2019 · N980AN · Boeing 737823SDR AALA201907259014Bulkhead · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED PRESSURE BULKHEAD AT BS 663.75 AND LBL 31.83. REPAIRED BULKHEAD PER SRM 57-10-10-2R-4.Jul 24, 2019 · N849NN · Boeing 737823SDR AALA2019082629059Bulkhead Web · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED VERTICAL PRESSURE DECK WEB AT BS 663 BETWEEN RBL 40 AND RBL 45.64. REPAIRED VERTICAL PRESSURE DECK WEB PER SRM 57-10-10-2R-3.Jul 23, 2019 · N967AN · Boeing 737823SDR SWAA2019082236183Bulkhead Web · crackedMAIN WHEEL VERTICAL PRESSURE WEB CRACKED AT BS. 663, RBL 42. / REPAIRED WEB PER SRM.Jul 23, 2019 · N294WN · Boeing 7377H4SDR SWAA2019080535620Bulkhead Web · crackedCENTER WING SECTION REAR SPAR VAPOR BARRIER CRACKED AT BS. 663, BETWEEN RBL 12 TO RBL 20. REPAIRED BARRIER IAW SRM.Jul 23, 2019 · N411WN · Boeing 7377H4SDR SWAA2019080535619Bulkhead Web · crackedWING CENTER SECTION REAR SPAR VAPOR BARRIER CRACKED AT BS. 663, LBL 38. REPAIRED BARRIER PER SRM.Jul 23, 2019 · N411WN · Boeing 7377H4SDR CALA2019072401248Bulkhead · crackedCRACK INDICATIONS FOUND [2EA] AT CENTER WING REAR SPAR VERTICAL PRESSURE WEB BETWEEN RBL 31.83 AND RBL 40. NOTE: PREVIOUS EXISTING REPAIR BETWEEN RBL 40 AND RBL 45.64 REPAIRED CENTER WING REAR SPAR VERTICAL PRESSURE WEB BETWEEN RBL 31.83 & RBL 40 PER SRM 57-10Jul 23, 2019 · N26208 · Boeing 737824SDR CALA2019072401247Bulkhead · crackedCRACK INDICATIONS [3EA] FOUND AT CENTER WING REAR SPAR VERTICAL PRESSURE WEB BETWEEN LBL 31.83 AND LBL 45.64 NOTE: EXISTING PREVIOUS REPAIR BETWEEN LBL 45.64 AND LBL 40 REPAIRED CENTER WING REAR SPAR VERTICAL PRESSURE WEB BETWEEN LBL 31.83 & LBL 45.64 PER SRM Jul 23, 2019 · N26208 · Boeing 737824SDR SWAA2019081335807Bulkhead Web · crackedLOWER FUSELAGE WEB CRACKED AT BS. 663.75, BETWEEN RBL 6 TO RBL 72. / R&R WEB PER SRM AND DWG.Jul 22, 2019 · N411WN · Boeing 7377H4SDR AALA201907239018Pressure Deck · crackedAIRCRAFT WAS GROUNDED: CRACKED FORWARD BULKHEAD IN THE RIGHT HAND MAIN LANDING GEAR WHEEL WELL PRESSURE DECK AT BS 663.75, RBL 41 AND WL 200. **SUPPLEMENTAL REPORT: REPAIRED PRESSURE DECK PER SRM 57-10-10-2R-4** (CLOSED)Jul 21, 2019 · N980AN · Boeing 737823SDR SWIA2019080546137Angle · crackedCRACKED ANGLE AT THE FS621 BULKHEAD COMMON TO THE CARGO DOOR BEAM LOWER ANGLE. REMOVED AND REPLACED THE CRACKED ANGLE AT FS621 BULKHEAD CARGO DOOR BEAM LOWER ANGLE IAW SRM. LEAK CHECKS GOOD.Jul 20, 2019 · N903SW · Cndair CL6002B19SDR SWAA2019080735710Attach Angle · crackedLOWER COMPOSITE WEB UPPER ATTACH ANGLE CRACKED AT BS. 663, LBL 43. / REPAIRED ANGLE PER ER AND EA.Jul 19, 2019 · N913WN · Boeing 7377H4SDR FDEA2019082011634Doubler · crackedFUSELAGE - CENTER LANDING GEAR COMPARTMENT FORWARD BULKHEAD LEFT HAND WEB DOUBLER FOUND CRACKED AT STATION Y = 1381. CENTER LANDING GEAR COMPARTMENT FORWARD BULKHEAD LEFT HAND WEB STATION Y =1381 DOUBLER FABRICATED BY MACHINING AS PER DOUGLAS DRAWING AEA 0Jul 18, 2019 · N609FE · Doug MD11FSDR FDEA2019071801634Doubler · crackedCARGO COMPARTMENT FWD BULKHEAD WEB DOUBLER FOUND CRACKED AT BS 1381. CENTER LANDING GEAR COMPARTMENT FORWARD BULKHEAD LEFT HAND WEB STATION BS 1381 DOUBLER FABRICATED BY MACHINING AS PER DOUGLAS DRAWING AEA 0526 REVISION NC CRACKED DOUBLER REMOVED AND FABRIJul 18, 2019 · N609FE · Doug MD11FSDR REXA20190814219Stiffener · chafedFS 621 REAR PRESSURE BULKHEAD AFT VERTICAL STIFFENER AT B.L. 0 AT WL 140 IS CHAFED APROX -.5 WIDE & 0.030 DEEP. REPAIRED AREA IAW REO 601R-53-61-7060, AND GREO 601R-53-61-1523.Jul 18, 2019 · N980EV · Cndair CL6002B19SDR SWAA2019081335788Attach Angle · crackedLOWER COMPOSITE BULKHEAD UPPER ATTACH ANGLE CRACKED AT BS. 663, RBL 8. / REPAIRED ANGLE PER EA & ER.Jul 18, 2019 · N7811F · Boeing 73776NSDR SWAA2019080535524Bulkhead Web · crackedPRESSURE WEB CRACKED AT BS. 663, LBL 38. REPAIRED WEB IAW SRM.Jul 18, 2019 · N701GS · Boeing 7377H4SDR SWAA2019080135478Bulkhead Web · crackedLOWER COMPOSITE BULKHEAD CRACKED AT BS. 663, RBL 44. REPAIRED BULKHEAD IAW SRM.Jul 18, 2019 · N912WN · Boeing 7377H4SDR SWAA2019081936035Bulkhead Web · crackedLOWER COMPOSITE BULKHEAD CRACKED AT BS. 663, LBL 45. / R&R BULKHEAD VAPOR BARRIER IAW SRM & DWG.Jul 17, 2019 · N781WN · Boeing 7377H4SDR A6WA2019080946783Bulkhead Web · crackedFOUND REAR PRESSURE BULKHEAD WEB HAS 2 AREAS THAT HAVE MULTIPLE INDICATIONS NOTED. 1) BL0.0 WL112-106 6 INCHES LONG 90% FSH, 2) RBL 18.00 . 2 INCHES LONG 50% FSH. BOTH FAILED NDT INSPECTION.Jul 17, 2019 · N466AW · Cndair CL6002B19SDR CALA2019071801216Pressure Panel · crackedDURING INSPECTION AND MODIFICATION PER EA 5330-05216 OP2 AT LT PRESSURE PANEL AT FR35-36 HOLES SHOWN FIGURE 1 WERE FOUND WITH CRACK INDICATIONS DAMAGE IS BEYOND EA LIMITS PER NON ROUTINE 9293540 ACCOMPLISHED INTERIM REPAIR AT LH PRESSURE PANEL FR 35-36 HOLES IJul 17, 2019 · N428UA · Airbus A320232SDR CALA2019071901223Pressure Panel · crackedDURING INSPECTION AND MODIFICATION PER EA 5330-05216 OP3 AT RT PRESSURE PANEL AT FR35-36 HOLES SHOWN IN FIGURE 1 WERE FOUND WITH CRACK INDICATIONS DAMAGE IS BEYOND EA LIMITS PER NON ROUTINE 9293541 ACCOMPLISHED REPAIR AT RT PRESSURE PANEL AT FR 35-36 HOLES IAWJul 17, 2019 · N428UA · Airbus A320232SDR SWAA2019071935098Vapor Barrier · crackedLT MAIN LANDING GEAR WHEEL WELL FORWARD BULKHEAD VAPOR BARRIER CRACKED AT BS. 663, LBL 31.83. REPAIRED BARRIER PER EA.Jul 17, 2019 · N272WN · Boeing 7377H4SDR FDEA201907161584Bulkhead · crackedFUSELAGE - LEFT HAND AIRCON COMPARTMENT PRESSURE BULKHEAD STATION 594.875 X=42 WEB CRACKED. FUSELAGE LEFT HAND AIRCON COMPARTMENT PRESSURE BULKHEAD STATION 594.875 X=42 WEB REPAIRED AS PER EA 1-5310-T0348395 P1 TITLE: FUSELAGE - MAINFRAME - STA 594.875 AFT PREJul 16, 2019 · N609FE · Doug MD11FSDR SWAA2019080635689Web · crackedL/H MAIN WHEEL WELL HORIZONTAL PRESSURE DECK WEB CRACKED AT BS. 663+2, LBL 32. / REPAIRED WEB PER SRM.Jul 16, 2019 · N295WN · Boeing 7377H4SDR SWAA2019073035421Pressure Deck · crackedRT MAIN WHEEL WELL HORIZONTAL PRESSURE DECK WEB CRACKED AT BS. 663+2, RBL 38. REPAIRED DECK WEB IAW SRM.Jul 16, 2019 · N295WN · Boeing 7377H4SDR SWAA2019072935370Bulkhead · crackedLOWER COMPOSITE BULKHEAD CRACKED AT BS. 663, RBL 20. REPAIRED BULKHEAD IAW SRM.Jul 16, 2019 · N781WN · Boeing 7377H4SDR SWAA2019072935320Vapor Barrier · peelingLT LOWER VAPOR BARRIER PEELED AT BS. 663. REPAIRED WEB IAW SRM.Jul 16, 2019 · N750SA · Boeing 7377H4SDR SWAA2019081335757Angle · crackedREAR SPAR VERTICAL PRESSURE DECK CRACKED AT BS. 663, BETWEEN RBL 25 TO RBL 45. REPAIRED ANGLE IAW EA.Jul 15, 2019 · N568WN · Boeing 73776NSDR SWAA2019072535299Vapor Barrier · crackedVAPOR BARRIER CRACKED AT BS. 663.75, BETWEEN LBL 40.00 TO LBL 24.92. REPAIRED VAPOR BARRIER PER SRM.Jul 15, 2019 · N295WN · Boeing 7377H4SDR R61A201907150718Firewall · crackedAPU, RT FIREWALL CRACKED ON L-PROFILE. REMOVED DAMAGE WITH CUTOUT AND REPAIRED PER SRM 51-31-21, TYPE 1 FIG 102 REPAIR 2.Jul 15, 2019 · N824MD · Emb ERJ170200SUSDR V0XR20190716001Bulkhead · corrodedFRAME SYTATION BULKHEAD RT AFT LOWER WEB HAVE SIGNS OF CORROSION. CORRECTIVE ACTION: REPAIRED RT AFT LOWER WEB BY CUTTING DAMAGED AREA, FABRICATED AND INSTALLED REPAIR PARTS IAW REO 670-53-11-594 REV.A DATED 2011/04/27 AND IAW AMM 20-70-00, SRM 51-42-06, 51-42Jul 14, 2019 · N379CA · Cndair CL6002C10SDR CALA2019071501200Pressure Panel · crackedRT CENTER WING REAR SPAR VERTICAL WEB HAS CRACK INDICATION LOCATED AT STA 663 RBL-42.5 WL-197. REPAIR PER SRM 57-10-10 REPAIR 3, ALTERNATIVE 2 (SEE FLEET CYCLE N/R LP -9679517) C/W INSPECTED REPAIRED ARE SEE LOG PAGE 9679517.Jul 14, 2019 · N27205 · Boeing 737824SDR SWAA2022031273236Support Angle · crackedLEFT MLG WHEEL WELL STA 663 LBL25 WL 150; VERTICAL SUPPORT ANGLE IS CRACKED AT BOTTOM END. / REMOVED & REPLACED LEFT MLG WHEEL WELL STA 663 LBL 25 WL 150 VERTICAL SUPPORT STIFFENER IAW SRM 51-40-02-0G-0; 51-40-05-0G-0 & DWG 111A1000 REV-Jul 13, 2019 · N962WN · Boeing 7377H4SDR DALA2019071404205Pressure Panel · crackedA CRACK THAT EXCEEDS THE AUTHORIZED REPAIR AREA WAS FOUND AT THE PRESSURE PLATE PANEL BETWEEN FR35LH AND FR36LH. HOLE #3.AA5311-01171SB A320-53-1263AD-2018-06-04. COMPLIED WITH PRI 579496-14AD REV O, REV 1, REV 2, REV 3 AND REV 4, ALSO ER/A 579496-14AD REV O.Jul 13, 2019 · N348NW · Airbus A320212SDR DALA2019071404204Pressure Panel · crackedA CRACK THAT EXCEEDS THE AUTHORIZED REPAIR AREA WAS FOUND AT THE PRESSURE PLATE PANEL BETWEEN FR35LH AND FR36LH. HOLE #14.AA5311-01171SB A320-53-1263AD-2018-06-04. COMPLIED WITH PRI 579496-14AD REV O, REV 1, REV 2, REV 3 AND REV 4, ALSO ER/A 579496-14AD REV O.Jul 13, 2019 · N348NW · Airbus A320212SDR DALA2019071404203Pressure Panel · crackedA CRACK THAT EXCEEDS THE AUTHORIZED REPAIR AREA WAS FOUND AT THE PRESSURE PLATE AREA BETWEEN FR35LH AND FR36LH. HOLE # 26. AA 5311-01171SB A320-53-1263AD-2018-06-04. COMPLIED WITH PRI 579496-14AD REV O, REV 1, REV 2, REV 3 AND REV 4, ALSO ER/A 579496-14AD REV Jul 13, 2019 · N348NW · Airbus A320212SDR DALA2019071504202Pressure Panel · crackedA CRACK THAT EXCEEDS THE AUTHORIZED REPAIR AREA WAS FOUND AT THE PRESSURE PLATE PANEL BETWEEN FR35RH AND FR36RH. HOLE # 4. -M- AA5311-01171 SB A320-53-1263 AD -2018-06-04. REPAIRED PER PRI 579495-14AD REV 0 AND 1 AND ER/A 579495-14AD REV 0.Jul 13, 2019 · N348NW · Airbus A320212SDR SWAA2019071534794Vapor Barrier · crackedLT MAIN WHEEL WELL FORWARD BULKHEAD VAPOR BARRIER CRACKED BETWEEN LBL 54.21 TO LBL 50. REPAIRED BARRIER PER EA.Jul 12, 2019 · N7843A · Boeing 737752SDR SWAA2022031183796Bulkhead · corroded***CORROSION*** ON FWD BULKHEAD AT APU COMPARTMENT JUST UNDER FUEL SUPPLY LINE BS1088 LBL14 WL215. MARKED. / CORROSION ON FWD BULKHEAD AT APU COMPARTMENT AT BS 1088 LBL 14 WL 215 WAS REPAIRED IAW ATS ER 19-04139 REV IR DATED 29JUL19 AND EA 1-753-35316 REV IRJul 11, 2019 · N752SW · Boeing 7377H4SDR ASAA2019080230274Angle · crackedR/H ECS BAY AFT BULKHEAD STA. 633 UPPER ANGLE IS CRACKED AT I/B END RBL 12. GROUNDED - YES. REPAIRED IAW ALASKA AIRLINES EA 900ER-57EA-21892 REV 00.Jul 11, 2019 · N457AS · Boeing 737990ERSDR ASAA20190802969Angle · crackedL/H ECS BAY AFT BULKHEAD STA. 633 UPPER ANGLE IS CRACKED AT I/B END LBL 12. GROUNDED - YES. REPAIRED IAW ALASKA AIRLINES EA 900ER-57EA-21892 REV 00.Jul 11, 2019 · N457AS · Boeing 737990ERSDR CALA2019071401192Splice Plate · defectiveAD2016-13-3 SUPPORT TASK EA 5380-01118 REV A STA1582 39R FOUND 1EA FASTENER HOLE IN POOR CONDITION(THE THIRD HOLE COUNT FROM O/ B).REF NR LP 9131593 STA1582 S39R TO STR39L APB PRESSURE CHORD SPLICE PLATE REPAIRED AS PER ECRA 5311-02195 ATTACH MAINTENANCE WORK Jul 11, 2019 · N685UA · Boeing 7673CBSDR CALA2019071301183Pressure Panel · crackedWHILE AT DLH DURING C-2 CHECK, HOLE CRACKS WERE DISCOVERED DURING ACCOMPLISHMENT OF EA5330-05216. OUTSIDE OF CUTOUT AREA AT HOLES 1, 2 & 4 ON LT FRAME 35/36 ACCOMPLISHED REPAIR OF ALL HOLES IAW EC/RA 5331-02412 TO LT FR35-36 PRESSURE PANEL HOLE CRACKS. ACCOMPLJul 11, 2019 · N824UA · Airbus A319131SDR VGCA2019112619001Pressure Deck · corrodedLEFT MAIN LANDING GEAR WELL PRESSURE DECK UPPER WEB CORRODED BETWEEN BODY STATION 940-950 AND LOWER BODY BUTTOCK LINES 30-70.Jul 10, 2019 · N281FL · Boeing 727281SDR SWAA2019073135448Pressure Deck · crackedHORIZONTAL PRESSURE DECK CRACKED BETWEEN BS. 663 TO BS. 675, BETWEEN LBL 25 TO LBL 60. REPAIRED DECK PER SRM.Jul 10, 2019 · N7811F · Boeing 73776NSDR AALA20190711004Pressure Panel · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED VERTICAL PRESSURE WEB AT BS 663 BETWEEN RBL 25 AND RBL 45.64. REPAIRED VERTICAL PRESSURE WEB PER EA 295944 AND SRM 57-10-10-2R-4.Jul 10, 2019 · N901AN · Boeing 737823SDR COEA2019070911816Bulkhead · corrodedWO 198725 NR 100037 HEAVY CHECK COE/MAJOR REPAIR: FORWARD PRESSURE BULKHEAD UPPER BONDING POINT AT LBL 187.5 HAS LEVEL 2 CORROSION. CORRECTIVE ACTION: REPAIR PER SRAS DO/TS-3897/05...3326 ISSUE C, DATED 9/12/2019.Jul 9, 2019 · N816FX · Aerosp ATR72212
Back to JASC 5312