JASC 5315
Service difficulty reports · 44,218
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR AALA202011099029Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE. FOUND 2 INCH LONG BY 1 INCH WIDE CORRODED AREA ON FLOOR BEAM Y1292 AT FR 20, STR 23 AND -Z500. REMOVED AND REPLACED FLOOR BEAM, REF SRM 51-42-11.SDR KCSA202011021164Floorbeam · corrodedCORROSION ON MAIN DECK FLOOR BEAM STA 2240 LBL 40 TO 100.SDR AALA202011209024Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE. FOUND CORROSION ON LAVATORY MOUNT HOLES ON FLOOR BEAM AT FR 66 AND Y-765. REPLACED FLOOR BEAM, REF SRM 51-75-12.SDR SCNA20201116244Floorbeam · corrodedCORROSION ON AFT CABIN FLOOR SUPPORT, STA 947.5+3, LBL 40 TO LBL 46, WL 208 MULTIPLE AREAS. AFT CABIN FLOOR SUPPORT AT BS 947.5+3 LBL 40-46 FOUND TO BE OUT OF LIMITS, IAW B737-800 SRM 53-70-51-1A-1 FIG 104 DETAIL C. REMOVED AND REPLACED FLOOR SUPPORT, IAW B7SDR SCNA20201116242Floorbeam · corrodedCORROSION ON AFT CABIN FLOOR PANEL BREAK, STA 947.5+4, RBL 51, WL 208. AFT CABIN FLOOR PANEL BREAK AT BS 947.5+4 RBL 51 FOUND TO BE OUT OF LIMITS, IAW B737-800 SRM 53-70-51-1A-1. REMOVED AND REPLACED FLOOR PANEL BREAK, IAW B737-800 SRM 51-40-02-0G-0 AND BOEISDR SCNA20201116241Floorbeam · corrodedCORROSION ON AFT CABIN FLOOR PANEL BREAK, STA 947.5+4, RBL 25, WL 208. AFT CABIN FLOOR PANEL BREAK AT BS 947.5+4 RBL 25 FOUND TO BE OUT OF LIMITS, IAW B737-800 SRM 53-70-51-1A-1. REMOVED AND REPLACED PANEL BREAK, IAW B737-800 SRM 51-40-02-0G-0 AND BOEING DRASDR SWIA202054453Floorbeam · corrodedFLOOR SILL AT FS 280 FWD OF PAX DOOR HAS CORROSION IN SEVERAL SPOTS, MARKED. C-CHECK RO 12/04/2020. INSTALLED NEW LT FLOOR SILL, P/N SH670-32171-7 AT FS 280-310, IAW CRJ 700 SRM.SDR YENA2020110400510Floorbeam · corrodedDURING HEAVY MAINTENANCE, CORROSION FLOOR STRUCTURE BEAM LT FRAME 17 IN PASSENGER CABIN. RESOLVED ON W/O: 1072873 TASKCARD: NR-00007, REF ARM N/R 2020-317342 W/O 2020-348/1 TECH 8611312 RII QC 172. PERFORMED REPAIR (3 EA) ON FLOOR BEAM AT LEVEL OF FRAME 16, SDR SWAA2021072127250Floorbeam · pulledCABIN FLOOR SUPPORT UPPER WEB FASTENERS PULLED THRU; BS 540; RBL 45 TO RBL 60; WL 208; MARKED / REMOVED AND REPLACED CABIN FLOOR SUPPORT AT BS 540; RBL 45 - RBL 60; WL 208 IAW SRM 51-40-02-0G-0; DWG 143A0060SDR SWAA2021072127251Floorbeam · pulledCABIN FLOOR SUPPORT UPPER WEB FASTENERS PULLED THRU; BS 540; LBL 45 TO LBL 60; WL 208; MARKED / REMOVED AND REPLACED CABIN FLOOR SUPPORT AT BS 540 LBL 45 TO LBL 60 WL 208 PER SRM 51-40-05-0G-0; SRM 51-40-06-0G-0; SRM 51-40-02-0G-0 AND DRAWING # 143A5240SDR SWAA2021072127338Floorbeam · corroded***CORROSION*** ON FLOOR SUPPORT SPLICE AT AFT CARGO BAY BS727D+6 LBL19 TO RBL19 WL156. / REMOVED AND REPLACED NEW FLOOR SUPPORT SPLICE AT AFT CARGO BAY BS727D+6 LBL19 TO RBL19 WL156 ITEM# 146A9401-8 IAW SRM 51-10-02-0G-0 SRM 51-40-02-0G-0; AIPC 53-42-11-30SDR SWIA202054530Floorbeam · crackedFS 280.00 FLOOR BEAM DOUBLER CRACKED BETWEEN LBL 9-18, MARKED. C-CHECK RO 12/05/2020. REMOVED AND INSTALLED NEW REPAIR DOUBLER P/N 601R-53-11-171-1 ON FS 280.0 CROSSBEAM AT LBL 9.0-LBL 18.0, REF BOMBARDIER REO, ALL STEPS COMPLIED WITH.SDR SWIA202054529Floorbeam · crackedFS 280.00 BEAM ATTACHING ANGLE TO RBL 9 FLOOR BEAM CRACKED ON TOP AT BEND. C-CHECK RO 12/05/2020. REMOVED AND INSTALLED NEW CLIP P/N 601R-5311-171 -5 AT RBL 9.0 FLOOR BEAM AND FS 280.0 CROSSBEAM, REF CRJ 200 SRM AND BOMBARDIER REO.SDR DALA2020103003535Floorbeam · corrodedDURING INITIAL INSPECTION FOUND LEVEL 2 CORROSION ON FLOOR STRINGERS LBL 7.55 AND LBL 10.45, STA 549 AT FWD CARGO COMPARTMENT. STRINGERS REPLACED, PER SRM.SDR SWIA202054414Floorbeam · corrodedFS 349 FLOOR CROSSBEAM IS CORRODED AT RBL 41. C-CHECK RO 11/24/2020. REPAIRED FLOOR SUPPORT CROSSBEAM AT FS 349 RBL 41, IAW BOMBARDIER REO. COMPLETED TASK CARD AND FORM 337, NO WEIGHT CHANGE.SDR SWIA202054520Floorbeam · corrodedCORROSION ON FLOOR SUPPORT AT FS 559.00, RBL 27-RBL 36, AREAS MARKED. C-CHECK RO 12/05/2020. NEW FLOOR SUPPORT STRAP P/N 601R31025-29 AT FS 559.0 LBL 38.0 INSTALLED, REF CRJ 200 SRM AND BOMBARDIER DWG. ALL CHECKS GOOD, SEE CONTINUATION CARD FOR DETAILS.SDR SWIA202054518Floorbeam · corrodedCORROSION ON FLOOR SUPPORT AT FS 559.00, LBL 27-LBL 36, AREAS MARKED. C-CHECK RO 12/05/2020. REMOVED AND INSTALLED NEW FLOOR SUPPORT STRAP P/N 601R31025-29 INSTALLED AT FS 559.0 LBL 27.0-LBL 36.0, REF CRJ 200 SRM/BOMBARDIER DWG. COMPLIED WITH ALL CHECKS GOOSDR SWIA202054433Strap · corrodedFS 559 RBL 27-36 FLOOR BEAM STRAP IS CORRODED. C-CHECK RO 11/24/2020. REMOVED AND REPLACED FLOOR BEAM STRAP AT FS 559 RBL 27 TO 36, IAW CRJ-200 SRM.SDR SWIA202054432Strap · corrodedFS 559 LBL 27 TO 36 FLOOR BEAM STRAP IS CORRODED. C-CHECK RO 11/24/2020. REMOVED AND REPLACED LT FLOOR BEAM STRAP AT FS 559 LBL 27 TO 36, IAW CRJ-200 SRM.SDR MASA20201028066Floorbeam · corrodedC-CHECK FLOOR SUPPORT ON FS 280 BEAM CORRODED FORWARD E&E BAY. R & R FLOOR SUPPORT BEAM ON FS 280 BEAM.SDR SWIA202055134Floorbeam · corrodedFLOOR SUPPORT CROSSBEAM ASSEMBLY AT FS 985, BETWEEN LBL 27 AND THE FLOOR SILL HAS CORROSION, MARKED. C-CHECK RO 1/5/2021. DAMAGE FOUND TO BE OUT OF LIMITS, PER CRJ 700 SRM 53-00-00-101-001-A01. FLOOR SUPPORT CROSSBEAM REPAIRED, REF REO 670-53-61-1759, REV: SDR R61A2020111300758Floorbeam · crackedDURING HEAVY MAINTENANCE FOUND FWD FUSELAGE FLOOR STRUCTURE CRACK FOUND ON ANGLE SUPPORT AT FLOOR BEAM 12 AND BL 0. FWD FUSELAGE FLOOR STRUCTURE ANGLE SUPPORT AT FLOOR BEAM 12 AND BL 0 REPLACED, IAW SRM 51-41-01. A/C REMAINS IN CHECK.SDR SWIA202055132Floorbeam · corrodedLEFT SIDE FLOOR SUPPORT CROSSBEAM ASSEMBLY AT FS 1051, LBL 27 TO LBL 45 HAS CORROSION, MARKED. C-CHECK RO 1/5/2021. REMOVED CORROSION ON LBL 27-LBL 45 AT FS 1051, REF CRJ-700 SRM 51-21-06-001-001-A01. COMPLIED WITH MHIRJ REO 670-53-61-1753 REV- DATED: 2020-SDR SWAA2020111726123Floorbeam · crackedCRACKED FLOOR SUPPORT AT BS 540 BL 0-RBL 24.5 WL 208.1. REPLACED CRACKED FLOOR SUPPORT AT BS 540 BL 0-RBL 24.5 WL 208.1, PER SRM 51-40-02-0G-0 DWG 143A0060. 57449U 03NOV20.SDR SWAA2020111726122Floorbeam · crackedCRACKED FLOOR SUPPORT AT BS 540 BL 0-LBL 24.5 WL 208.1. REPLACED CRACKED FLOOR SUPPORT AT BS 540 BL 0-LBL 24.5 WL 208.1, PER SRM 51-40-02-0G-0 DWG 143A0060. 57449U 02NOV20.SDR REXA2020111600767Floorbeam · corrodedTHE FS 280 FLOOR BEAM HAS SEVERAL CORRODED RIVETS BETWEEN LBL 12 AND RBL 12. REMOVED AND REPLACED LT AND RT FS 280 CROSSBEAMS, IAW CRJ 900 SRM 51-42-06-001-001-A01 AND 51-42-13-001-001-A01.SDR R61A2020111300763Floorbeam · corrodedDURING HEAVY MAINTENANCE FOUND AFT CARGO COMPARTMENT CORROSION FOUND ON FLOOR SUPPORT RT BRACKET AT FR 77 BETWEEN STR 29L-29R. AFT CARGO COMPARTMENT FLOOR SUPPORT RT BRACKET AT FR 77 BETWEEN 29L-29R REPLACED, IAW SRM 51-41-01. A/C REMAINS IN CHECK.SDR SWIA202055110Floorbeam · corrodedCORROSION ON LT AND RT FLOORBEAM AT FS 280. C-CHECK RO 1/5/2021. CORROSION ON FS 280.00 LT AND RT FLOOR BEAMS ARE 100% THROUGH AND CORROSION FOUND ON MULTIPLE ELEMENTS THEREFORE FOUND OUT OF LIMITS, IN REF CRJ700 SRM 53-00-00-101-001-A01. REMOVED AND REPLACSDR SWIA202055083Floorbeam · corrodedFLOOR SUPPORT STRUCTURE, CROSSBEAM AT FS 333 BETWEEN LBL 9 AND LBL 27 HAS CORROSION, MARKED. C-CHECK RO 1/5/2021. REMOVED CORROSION AND EVALUATED, FOUND TO BE OUT OF LIMITS, REF CRJ700 SRM. REMOVED AND PERFORMED REPAIR ON THE FLOOR SUPPORT CROSSBEAM ST FS 3SDR SWIA202055066Floorbeam · corrodedFS 280 FLOOR PANEL SUPPORT ANGLE CORRODED. C-CHECK RO 1/5/2021. REMOVED AND REPLACED FS 280.00 FLOOR SUPPORT ANGLE, IN REF DWG, CRJ700 SRM. SEE CONTINUATION CARD FOR WORK PERFORMED. ST CARD COMPLETE.SDR SWIA202054106Floorbeam · crackedRBL 12.00 FS 274 FLOOR BEAM IS CRACKED, FOUND WHILE REMOVING 221ALF FLOOR SUPPORT ANGLE AT FS 280 ON JOB: 71028674 OP: 16 MX TRANS NR 21720630. C-CHECK RO 11/16/2020. REPAIRED RBL 12.00 FS 274 FLOOR BEAM, REF CRJ-700 SRM. COMPLIED WITH TASK CARD.SDR SWIA202054105Floorbeam · corrodedRT 280 FLOOR BEAM IS CORRODED, FOUND DURING REMOVAL OF 221ALF FLOOR SUPPORT ANGLE ON JOB: 71028674 OP: 16 MX TRANS NR 21720630. C-CHECK RO 11/16/2020. REMOVED AND REPLACED RT 280 FLOOR BEAM, REF DWG CRJ 700 SRM. COMPLIED WITH TASK CARD.SDR A6WA202011067393Floorbeam · corrodedRT HAND FLOOR SILL ANGLE AT FS 426 RBL 37 HAS CORROSION. AIRCRAFT REMOVED FROM SERVICE. REMOVED CORROSION ON PRESSURE FLOOR SILL ANGLE AT FS 426 RBL 37, REF REO 601R-53-41-666 REV-C DATED: 2012-11-06 AND CRJ 200 SRM 51-21-06 REV 38. PERFORMED HFEC INSPECTIOSDR JR2R20201024959Floorbeam · corrodedLT FLOOR BEAM FOUND TO BE CORRODED OUT OF LIMITS. REPAIRED FLOOR BEAM.SDR SCNA20201116249Floorbeam · corrodedFWD CABIN FLOOR BEAM HAS CORROSION STA 328, RBL11.5, WL 207. CORROSION ON FLOOR BEAM AT BS 328 RBL 11.5 WL 207 FOUND TO BE OUT OF LIMITS, IAW B737-800 SRM 53-10-51-1A-1. REMOVED AND REPLACED UPPER CHORD AND FASTENER, PER 737-800 SRM 51-40-02 AND 737-800 SR, SDR SCNA20201116248Floorbeam · corrodedFWD CABIN FLOOR BEAM HAS CORROSION STA 328, RBL 54, WL 207. CORROSION ON FLOOR BEAM AT BS 328 RBL 54 WL 207 FOUND TO BE OUT OF LIMITS, IAW 53-10-51-1A-1. REMOVED AND REPLACED UPPER CHORD AND FASTENERS, PER 737800 SRM 51-40-02 AND 737-800 SRM 53-10-51-2R-7.SDR R61A2020110800727Floorbeam · corrodedCORROSION FOUND ON CENTER FUSELAGE III FLOOR STRUCTURE SUPPORT CLIP AT FR 87 RT SIDE. REPLACED IAW SRM 51-43-01.SDR FDEA202010232627Floorbeam · crackedMAIN DECK STA 1050 RBL 38 FLOOR SUPPORT CRACKED AFTER REMOVAL OF TOP PLATE AND FURTHER EVALUATION NO DAMAGE FOUND AT FLOOR SUPPORT STA 1050 RBL 24 TO RBL 44. DAMAGE ONLY ON TOP PLATE, IAW B757 SRM 51-10-02. FABRICATED AND INSTALLED NEW TOP PLATE AT STA 1050 SDR CALA2020102901214Floorbeam · corrodedFWD CARGO COMPT MAIN CABIN FLOOR BEAM LOWER SURFACE STA 500B LBL 34 HAS CORROSION (DOT #212-022) REF. REPAIRED FLOOR BEAM LOWER SURFACE AT STA BS 500B LBL 34 REF ECRA 5351-02039.SDR SWIA202054419Floorbeam · crackedFS 280 FLOOR CROSSBEAM IS CRACKED AT LBL 12 AND RBL 12. C-CHECK RO 11/24/2020. REPAIRED IAW GREO. COMPLETED TASK CARD AND ATTACHED 337. WEIGHT CHANGE OF 1.25 LBS AT FS 280.SDR SWIA202054099Floorbeam · corroded221ALF FLOOR SUPPORT ANGLE ON FWD SIDE OF FS 280 BEAM HAS EVIDENCE OF CORROSION. C-CHECK RO 11/16/2020. 221ALF FLOOR SUPPORT ANGLE ON FWD SIDE OF FS 280 BEAM. REPLACED AND INSTALLED WITH NEW FASTENERS, REF CRJ 700 SRM AND DRW.SDR SWIA202054098Floorbeam · crackedFS 280 BEAM TO FLOOR BEAM ATTACH BRACKET AT BL 12.0 LT HAS EVIDENCE OF CRACK IN RADIUS AT UPPER END. C-CHECK RO 11/16/2020. FS 280 BEAM TO FLOOR BEAM ATTACH BRACKET AT BL 12.0 LT REPLACED WITH NEW, REF CRJ 700 SRM. COMPLIED WITH TASK CARD.SDR IPXA2020102261568Floorbeam · crackedINSPECTION TYPE: A300 MCD FLOOR SUPPORT OF FR 51 BETWEEN -Y450 AND -Y953 HAS CRACK. REMOVED & REPLACED MCD FLOOR SUPPORT AT FR 51 -Y450 TO -Y153, IAW SRM 51-40-21.SDR DALA2020102303443Floorbeam · corrodedCORROSION LEVEL: 2 DURING INSPECTION FOUND CORROSION ON UPPER CHORD BEAM, STA 365.25 BETWEEN BL 0 TO RBL 2 AT FLOOR PASSENGER CABIN STRUCTURE. REPARIED PER ERA 588248-14.SDR A6WA202010267353Floorbeam · corrodedCORROSION ON FLOOR ANGEL AT STATION 517, LBL 36, TO LBL 37. AIRCRAFT REMOVED FROM SERVICE. REMOVED CORROSION ON FLOOR ANGEL AT STATION 517, LBL 36, LBL 37, REF CRJ 200 SRM 51-21-06. MEASURE OF REWORK AREA L=0.851" W=0.080" D=0.005", ORIGINAL THICKNESS 0.08SDR A6WA202010267357Floorbeam · corrodedCORROSION ON FLOOR ANGLE AT STATION 468 & RBL 42. AIRCRAFT REMOVED FROM SERVICE. REMOVED CORROSION ON FLOOR ANGLE AT STATION 461.50, & RBL 42, REF CRJ 200 SRM 51-21-06. MEASURE OF REWORKED AREA L=0.900" W=0.950" D=0.013" ORIGINAL THICKNESS 0.080" REMAINING SDR FDEA202010202567Floorbeam · crackedFLOOR BEAM SUPPORT ANGLE CRACKED IN THE E&E BAY LEFT SIDE TUNNEL. REMOVE AND REPLACED FLOOR SUPPORT ANGLE, PER BAC DWG 141T5600 REV E.SDR SWIA202054348Floorbeam · corrodedLBL 27.00 FLOORBEAM IS CORRODED AT (1) LOCATION BETWEEN FS 559.00+96 AND FS 559.00+112. C-CHECK RO 11/24/2020. PERFORMED A MAJOR REPAIR TO FLOOR BEAM AT LBL 27 BETWEEN FS 559.00+96 AND FS 559.00+112, IAW CRJ200 SRM. COMPLETED SKYWEST MAJOR REPAIR TASK CARD.SDR DALA2020102003417Floorbeam · damagedDURING INSPECTION FOUND CORROSION ON PREVIOUS REPAIR FLOOR BEAM UPPER AND LOWER STA=986 RBL 43 AT AFT PASSENGER COMPARTMENT. FILLER OF PREVIOUS REPAIR FLOOR BEAM (UPPER AND LOWER) STA=986 RBL 43 AT AFT PASSENGER COMPARTMENT WAS REPLACED, PER ER/A 464736-14MA SDR SWIA202054356Floorbeam · corrodedRBL 27.00 FLOORBEAM CAP IS HEAVILY CORRODED AT FS 559.00+80, INBOARD AND OUTBOARD SIDE OF BEAM. C-CHECK RO 11/24/2020. REMOVED AND REPLACED RBL 27.00 FLOORBEAM CAP AT FS 559+64 TO FS 559+112, IAW CRJ200 SRM. FORM 337 AND MAJOR REPAIR TASK CARD COMPLETED AND
Back to JASC 5315