JASC 5315
Service difficulty reports · 44,213
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR SWI2025F00991Floorbeam · corrodedFS280, THE COCKPIT FLOOR PANEL ANGLE THAT IS ATTACHED TO THE FS280 BEAMS IS CORRODED (MARKED) (C-CHECK RO 07/16/2025)REPLACED FS280, THE CORRODED COCKPIT FLOOR PANEL ANGLE THAT IS ATTACHED TO THE FS280 BEAMS WITH NEW PN CC670-34095-1 PO# 5-31209 PERF CRJ 900 SSDR SWI2025F00988Floorbeam · crackedFS280.00 RBL 9, FLOORBEAM TO CROSS BEAM OUTBD ATTACH ANGLE IS CRACKED. REMOVED AND INSTALLED NEW OUTBD ATTACH ANGLE TO FS280-00 RBL9 FLOORBEAM REF CRJ900 SRM 51-42-21-001-001-A01 & DWG CC670-34010 REV-K. COMPLIED WITH 51-900-1002-SKYSDR SWIA202507170329Floorbeam · crackedFS280.00 LBL 9, FLOOR BEAM TO CROSS BEAM OUTBD ATTACH ANGLE IS CRACKED (MARKED) (C-CHECK RO 07/16/2025)REMOVED AND INSTALLED NEW OUTBD ATTACH ANGLE TO FS280-00 LBL9 FLOOR BEAM REF CRJ900 SRM 51-42-21-001-001-A01 & DWG CC670-34010 REV-K. COMPLIED WITH 51-900-1SDR SWAA2025042850880Floorbeam · crackedPASSENGER CABIN FLOOR LATERAL FLOOR BOARD SUPPORT BEAM IS CRACKED AT FASTENER ON INBOARD END AT STA 540 AND BL 0. REMOVED CRACKED BREAK ASSY. AT STA 540; BL 0 AS PER SRM 51-10-02. REMOVED & REPLACED BREAK ASSY. AT STA 540 AS PER SRM 51-40-02.SDR AALA202503313870Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK IN PASSENGER CABIN FLOOR SUPPORT BREAK ASSEMBLY PANEL AT BS 540, LBL 3. REPLACED BREAK ASSEMBLY PANEL PER SRM 51-40-02.SDR CALA2025040103392Floorbeam · corrodedCABIN FLOOR BEAM AT B/S 328 RBL 2 TO 28 IS CORRODED. NOTE PREVIOUS REPAIR. REMOVED AND REPLACED FLOOR BEAM SECTION AT STA 328 BETWEEN BL 0 TO RBL 50 IAW B737-900ER SRM 53-10-51-2R-7.SDR DALA2025040102398Floorbeam · corroded(LOG 0881847) CORROSION ON FLOOR BEAM AT STA 328, BTW RBL 10- RBL 20 AT PAX CABIN. FLOOR BEAM AT STA 328, BTW RBL 10- RBL 20 WAS REPAIRED PER B737-800 SRM 53-10-51-2R PROCEDURE 7 REPAIR 7.SDR FDEA202503280529Floorbeam · crackedBULK CARGO COMPARTMENT FLOOR BEAM LBL8.73 CRACKED AT STA1395 - STA1417 REPLACED THE CRACKED BULK CARGO COMPARTMENT FLOOR BEAM LBL8.73 AT STA1395 - STA1417 PER DWG:146T5004 (REV.AJ) AND B767 SRM51-40-02. THIS REPEIR WAS CAT A. MAJOR REPAIR IAW FEDEX GMM6-2-1SDR FDEA202503280528Floorbeam · crackedBULK CARGO COMPARTMENT FLOOR BEAM LBL15.48 CRACKED AT STA1395 - STA1417 REPLACED THE CRACKED BULK CARGO COMPARTMENT FLOOR BEAM LBL15.48 AT STA1395 - STA1417 PER DWG :146T5004 (REV.AJ) AND B767 SRM51-40-02.THIS REPAIR WAS CAT A. MAJOR REPAIR IAW FEDEX GMM6-2SDR FDEA202503280527Floorbeam · crackedBULK CARGO COMPARTMENT FLOOR BEAM RBL15.48 CRACKED AT STA1439. REPLACED THE CRACKED BULK CARGO COMPARTMENT TRANSITION SUPPORT RBL15.48 AT STA1439 PER B767 SRM51-40-02. MINOR REPAIR IAW FEDEX GMM6-2-100.SDR IPXA2025040287996Floorbeam · corrodedFAULT: STR-200-MCC FLOOR STA.1200, LBL 0-62.225 HAS CORROSION.REMOVED NUTPLATE (11EA) ON STR-200-MCC FLOOR STA.1200, LBL 0-62.225 IAW B757-200 SRM 51-40-02-0G-0.REMOVED CORROSION IN THE AREA PER SRM 51-10-02.ACCOMPLISHED HFEC SURFACE ON FLOOR STA. 1200, LBL 0-SDR AALA202504140773Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOOR BEAM AT BS 986, LBL 44. REPAIRED FLOOR BEAM PER SRM 53-70-51-2R-6 AND EA 363558.SDR AALA202504144487Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOOR BEAM AT BS 986, RBL 44. REPAIRED FLOOR BEAM PER SRM 53-70-51-2R-6 AND EA 363558.SDR DALA2025033102371Floorbeam · corroded(LOG 0880934) FLOOR FRAME AT RBL 24.75 JUST AFT OF FLOOR BEAM 312 HAS AREAS OF CORROSION. REMOVED AND REPLACED FLOOR FRAME IAW B737 SRM 51-40-05 AND B737 SRM 51-40-02.SDR AALA202505130584Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON CABIN FLOOR BEAM BETWEEN FR 47.4 AND FR 47.5 AT +Y1732. REPLACED FLOOR BEAM PER SRM 51-42-11.SDR SWAA2025050553972Floorbeam · corrodedCORROSION ON FLOOR BEAM LOCATED BS 986.5 LBL 45 WL 208.1 AT AFT GALLEY AREA 2025-232173<[01] TOOL USED ON STEP 7 AND STEP 8:EDDY CURRENT EQUIPMENT P/N: NORTEC 600D; S/N: 240524311; DUE DATE: 13/NOV/2025;[02] PERFORMED REPAIR ON FLOOR BEAM LOCATED ON BS 986.5 LSDR AALA202505010017Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FLOOR BEAM UPPER CHORD (T-CAP) AT BS 947, RBL 24. REPAIRED FLOOR UPPER CHORD BEAM PER SRM 53-70-2R-5 AND EA 363511.SDR AALA202505015446Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FLOOR BEAM UPPER CHORD (T-CAP) AT BS 947.5, RBL 52. REPAIRED FLOOR BEAM UPPER CHORD PER SRM 53-70-2R-5 AND EA 363511.SDR AALA202505013865Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FLOOR BEAM UPPER CHORD (T-CAP) AT BS 947, LBL 24. REPAIRED FLOOR BEAM UPPER CHORD PER SRM 53-70-2R-5 AND EA 363511.SDR SWI2025F00494Floorbeam · corrodedFRAME 84 CROSSBEAM BETWEEN R/H FLOOR BEAM AND OTBD SILL CORRODED AS MARKED. (C-CHECK RO 04/21/2025)PERFORMED CUTOUT SPLICE REPAIR TO THE FRAME 84 CROSSBEAM BETWEEN RH FLOOR BEAM AND RH OUTBOARD SILL AND TRIMMED OUT NUTPLATE BRACKET OB EDGE P/N 170-66797-001 SDR SWI2025F00461Floorbeam · corrodedCENTER FUSELAGE III AFT CARGO FR 74 BETWEEN STGR 29R AND 29L R/H FLOOR SUPPORT CORRODED (C-CHECK RO 4/11/2025) REMOVED AND REPLACED CENTER FUSELAGE III AFT CARGO FR 74 BETWEEN STGR 29R TO 29L R/H FLOOR SUPPORT REF. EMB SRM 51-40-08. SEE CONTINUATION CASDR AALA202504072800Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOOR BEAM UPPER CHORD (T-CAP) AT STA 947.5, LBL 52. REPAIRED CHORD PER SRM 53-70-51-2R-5.SDR HNAA2025051200325Floorbeam · corrodedF036822 LH FLOOR BEAM LWR FLANGE CORRODED BETWEEN FR33-34. FABRICATED DOUBLER REPAIAR FOR LH FLOOR BEAM LWR FLANAGE, INSTALLED SERVICEABLE DOUBLER REPAIR ON LH FLOOR BEAM LWR FLANGE BETWEEN FR. 33-34 IAW EMB 145 SRM 53-22-10RE, ETD2025-145-905975 AND PIEDMONTSDR HNAA2025051200324Floorbeam · corrodedF036819 LH FLOOR BEAM WEB AND LOWER FLANGE CORRODED AT FR38. ACCOMPLISHED REPAIR ON L/H FLOOR BEAM AT FR38 IAW EMB 145 SRM 53-00-10RE, FIGIRE 202, SHEET 2 AND EO1-53-25-0155SDR HNAA2025051200323Floorbeam · corrodedF036818 CENTER FLOOR BEAM WEB CORRODED AT FR38. ACCOMPLISHED REPAIR OF CENTER CROSSBEAM AT FR38 IAW ETD2025-145-906383 AND EO1-53-25-0154SDR ASAA2025032557441Floorbeam · corrodedMAIN CABIN FLOOR BEAM AT STA. 947.5 LBL24 IS CORRODED. GROUNDED - YES. REMOVED DAMAGE & CHECKED LIMITS ORI MAT .180,REMOVED MAT .050,REMAINING MAT .130 FOUND TO BE OUT OF LIMITS. CUT OUT UPPER CHORD OF THE FLOOR BEAM STA 947.5 FROM RBL51 TO LBL51.FABRICATED,LOSDR DALA2025032802326Floorbeam · crackedSHIP 6708 CRACK ON FLOOR BEAM BTW FS 700 RBL22 AND RBL44. CORRECTIVE ACTION: SUMMARY OF NRC 00426: FLOOR BEAM BTW FS 700 RBL22 AND RBL44 AT PASSENGER CABIN WAS REPAIRED PER PRI 624762-14 REV. 2 AND ERA 624762-14 REV. ORIGINAL. (0877474)SDR DALA2025032702254Floorbeam · corroded(LOG 0877306) CORROSION ON BEAM (UPPER CHORT) PREVIOUS REPAIR BTW STA 947 LBL 51 TO LBL 55 AND RBL 51 TO RBL 55 AT AFT CABIN PASSENGER (W2). BEAM UPPER CHORT PREVIOUS REPAIR BTW STA 947 LBL 51 TO LBL 55 AND RBL 51 TO RBL 55 AT AFT CABIN PASSENGER WERE REPLACEDSDR CALA2025032703248Floorbeam · corrodedAFT CABIN WET AERA FLOOR BEAM UPPER FLANGE HAS CORROSION AROUND SCREW HOLE STA 947 RBL 49.DOT521-005 REF AAR N/R 9942581 CUT OUT DAMAGED AREA AND INSTALLED REPAIR AT STA 947.5 RBL 37.5" TO 59.5" REF. USED B737 SRM 53-70-51-2R-5 FIG 206 ALTERNATIVE 2, AAR ESR-WSDR SWAA2025050154304Floorbeam · crackedCRACK ANGLE LOCATED BS540 RBL1 AT CENTER WING BOX 2025-224187<[01] REPLACED BRAKE PANEL AND FASTENERS LOCATED BS 540 BETWEEN BL 0 AND RBL 24.75 AT PASSENGER CABIN. IAW B737-700 SRM: 51-40-02 AND DWG:143A0060;SHEET:44;REV:A SEE INDIVIDUAL SIGN OFF BELOW;[02] TASDR SWAA2025050154305Floorbeam · crackedCRACK ANGLE LOCATED BS540 LBL1 AT CENTER WING BOX 2025-224186<[01] REPLACED BRAKE PANEL AND FASTENERS LOC FLOOR STRUCTURE BS 540 BETWEEN BL O AND LBL 24.75 AT PASSENGER CABIN IAW B737-700 SRM 51-40-02 AND DWG: 143A0060; SHEET:44;REV:A. SEE INDIVIDUAL SIGN OFF SDR CALA2025032603206Floorbeam · corrodedAFTER REMOVAL OG THE FLOORBEAM AST AFT WET AREA FOUND CORROSION UNDER HARD POINT GALLEY FITTINGS AT STA 947 LBL 50 TO RBL50. (REF AAR NR 1000032300) REPAIRED DAMAGE CORROSION AT THE AFT WET AREA FLOORBEAM STA 947 BTW LBL 50 TO RBL 50 IAW SRM 53-70-51-2R-5. THISDR AALA202504078448Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOOR BEAM UPPER CHORD (T-CAP) AT STA 947, RBL 26. REPAIRED CHORD PER SRM 53-70-51-2R-5.SDR AALA202504074882Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOOR BEAM UPPER CHORD (T-CAP) AT STA 947, LBL 4. REPAIRED CHORD PER SRM 53-70-51-2R-5.SDR AALA202504071440Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOOR BEAM UPPER CHORD (T-CAP) AT STA 947, RBL 10. REPAIRED CHORD PER SRM 53-70-51-2R -5.SDR AALA202504077189Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOOR BEAM UPPER CHORD (T-CAP) AT STA 947, RBL 23. REPAIRED CHORD PER SRM 53-70-51-2R-5.SDR AALA202503242872Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK IN PASSENGER CABIN FLOOR SUPPORT BREAK ASSEMBLY PANEL AT STA 540, BL 0. REPLACED BREAK ASSEMBLY PANEL PER AARD 51-00-05-1.SDR SWI2025F01280Floorbeam · corrodedTHE COCKPIT FLOOR SUPPORT ANGLE ON THE FWD SIDE OF FS280 IS CORRODED (C-CHECK RO 09/07/2025)INSTALLED NEW COCKPIT FLOOR SUPPORT ANGLE FWD OF FS 280 CROSSBEAM REF CRJ 900 SRM 51-42-06-001-001-A01, CRJ 900 SRM 51-42-21-001-001-A01 AND DWG. NO. CC670-33052 REV.GSDR AALA202504070058Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOOR BEAM UPPER CHORD (T-CAP) ANGLE AT STA 947, LBL 26. REPAIRED CHORD PER SRM 53-70-51-2R-5.SDR AALA202504073887Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOOR BEAM UPPER CHORD (T-CAP) ANGLE AT STA 947, RBL 50. REPAIRED CHORD PER SRM 53-70-51-2R-5.SDR AALA202504071714Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOOR BEAM AT STA 987, LBL 43. REPAIRED PER SRM 53-70-51-2R-6.SDR FDEA202503220470Floorbeam · crackedHIGH FREQUENCY EDDY CURRENT INSPECTION ON OVERWING FLOOR BEAM ON STATION 1256 AT X= 109 UPPER FLANGE FOUND CRACK APPROXIMATE 0.2". OVERWING FLOOR BEAM ON STATION 1256 AT X=109 UPPER FLANGE CRACKED AREA REPAIRED AS PER EA # 1-5310-T0382645 P1 REPAIR CLASSSDR REXA2026072801205Floorbeam · corrodedCORROSION ON FLOOR PANEL SUPPORT ANGLE BTW LBL 11 TO RBL11 AT CROSSBEAM FS280. FLOOR PANEL SUPPORT ANGLE BTW LBL 11 TO RBL11 AT CROSSBEAM BS 280 WAS REPLACED IAW SRM 51-42-06-001-001-A01 AND SRM 51-42-21-001-001-A01.SDR AALA202504113137Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOOR BEAM AT STA 947.5, RBL 48. REPAIRED FLOOR BEAM PER SRM 53-70-51-2R-1.SDR AALA202504071895Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOORBEAM UPPER CHORD AT STA 947.5, RBL 51. REPAIRED CHORD PER SRM 53-70-51-2RSDR JJBA20250404034Floorbeam · corrodedRH FLOORBEAM CAP CORRODED UNDER BULKHEAD AT LAV. REMOVED CORRODED FLOORBEAM CAP, LOCATED AND DRILLED AND INSTALLEDSDR JJBA20250404033Floorbeam · corrodedRH FLOORBEAM AT F.S 23 CORRODED. REMOVED AND REPLACED WITH NEW REPAIR DOUBLER ON RH FLOORBEAM AT F.S. 23SDR JJBA20250404030Floorbeam · corrodedFLOOR SILL AT MOUNT BOLT AT F.S. 22 CORRODED. REMOVED AND REPLACED CAP ON FLOORSILL AT FS22SDR JJBA20250404028Floorbeam · corrodedRH FLOORBEAM CAP CORRODED AT MOUNT HOLES FOR LAV. REMOVED RH FLOORBEAM CAP FOR REPLACE, LOCATED, AND DRILLED AND INSSTALLEDSDR JJBA20250404027Floorbeam · corrodedCENTER FLOORBEAM CAP CORRODED AROUND MOUNT HOLES AT LAV. REMOVED CORRODED FLOORBEAM CAP, LOCATED AND DRILLED NEW
Back to JASC 5315