JASC 5315
Service difficulty reports · 44,213
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR AALA202503248633Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK IN PASSENGER CABIN FLOOR SUPPORT BREAK ASSEMBLY PANEL AT STA 540, RBL 4. REPLACED BREAK ASSEMBLY PANEL PER AARD 51-00-05-1.SDR IPXA2025031265344Floorbeam · erodedFS 900 BL 0 TO RBL 72 HAS CHAFING ON T-CHORD AND PAINT ERODED AWAY. INSTALLED 1EA OUTER CHORD & 8EA SPLICE IAW SRM B757-200 TASK: 51-40-02. REVIEWEDSDR DALA2025031201948Floorbeam · corroded(LOG 0850919) CORROSION ON FLOOR SUPPORT (BEAM) STA 328 AND RBL 40 AT FWD CABIN PASSENGER W1. FLOOR SUPPORT (BEAM) STA 328 AND RBL 40 AT FWD CABIN PASSENGER WAS REPAIRED PER B737-800 SRM 53-10-51-2R PROCEDURE 8 REPAIRSDR AALA202503122005Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FORWARD CABIN FLOOR BEAM AT FR 16 AND +Y1292. REPLACED FLOOR BEAM PER SRM 51-42-11.SDR SWAA2025041403035Floorbeam · crackedSTA 540 BREAK PANEL IS CRACKED AT RBL 1; WL 208.1<[01] REPLACED BREAK PANEL AT RBL 1 WL208 I.A.W SRM 737-700 51-40-02-0G-0 AND BOEING DWG 143A0060 REV:A;[02] REPLACED BREAK PANEL AT RBL 1 WL208 I.A.W SRM 737-700 51-10-02-0G-0 SRM 51-40-02-0G-0 AND BOEING DWG 1SDR AALA202503126313Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT CABIN FLOOR BEAM AT FR 68 AND +Y765. REPLACED FLOOR BEAM PER SRM 51-42-11.SDR CALA2025031002658Floorbeam · corrodedCORROSION AFT WET AREA CABIN FLOOR BEAM STA 986 RBL 26-37 DOT 260-008. (REF AAR N/R 9944765)(FOR ESFR PURPOSES) ACCOMPLISHED FLOOR BEAM REPAIR AT STA 986.5 RBL 20" TO RBL 50" AS PER- ESR 5-11622-WI-P1 AND B-737-800-SRM-53-70-51. ACCOMPLISHED FLOOR BEAM REPAIRSDR VNAA202503070025Floorbeam · corrodedAFTER REMOVAL OF FLOOR PANEL SUPPORT ANGLE, CORROSION ON LH CROSSBEAM AT FS 280.00 AT LBL 9. LH CROSSBEAM AT FS 280.00 AT LBL 9.00 WAS FOUND OUT OF LIMITS PER CRJ-900 SRM 53-00-00-101-001-A01 THEREFORE WAS REPLACED PER CRJ-900 SRM 51-42-06-001-001-A01,CRJ-900SDR VNAA202503070011Floorbeam · corroded"CORROSION ON FLOOR PANEL SUPPORT ANGLE UPPER FACE AT FS280.00 BTW RBL 9.00 AND LBL 9.00. FLOOR PANEL SUPPORT ANGLE UPPER FACE AT FS280.00 BTW RBL 9.00 AND LBL 9.00 WAS EVALUATED OUT OF LIMITS PER CRJ/900 SRM 53-00-01-001-001-A01 AND REPLACED PER CRJ-900 SRM SDR JR2R20250307202Floorbeam · crackedFLOOR BEAM 12 FWD SIDE ANGLE CLIP AT LBL36 IS CRACKEDSDR JR2R20250307203Floorbeam · crackedFLOOR BEAM 12 FWD SIDE ANGLE CLIP AT BL0 IS CRACKEDSDR DALA2025031001842Floorbeam · corroded(LOG 0844274) FWD CARGO COMPARTMENT STA 500H FLOOR BEAM LWR CHORD HAS CORROSION FRM LBL 40- RBL 40. C/W ER/A 624118-14 REV ORIGINAL.SDR IPXA2025040777911Floorbeam · crackedMCD FLOOR STRUCTURE CROSSBEAM C74 Y2127 SUPPORT ANGLE HAS A CRACK. DOT 68-06. INSTALLED PANELS: 261PF, 261VF, 261JM,251TU, 261DX,261GX IAW A300 AMM 53-10-23. VERIFIED ACCOMPLISHED PERMANENT REPAIR IN ACCORDANCE WITH EO-93165-REQ1 AND VT-MAE EA 300-5318-27-A3SDR JJBA20250404024Floorbeam · damagedLAT CARGO ENTRY FR67 T FLOOR FOUND DAMAGED. LAT CARGO ENTRY FR67 FLOOR REMOVED AND REPAIRED.SDR IPXA2025032676695Floorbeam · brokenMCD FLOOR STRUCTURE FR80 Y1580 SUPPORT ANGLE IS BROKEN. DOT 68-02. INSTALLED ANGLE IAW A300-600 SRM 51-40-20. P/N MS20246AD6-10 BATCH 0004366677, P/N MS20426AD6-7 BATCH 0004370836, P/N 04-001--0109 BATCH 0004355127.SDR CALA2025030702608Floorbeam · corrodedFWD CABIN WET AREA FLOORBEAM UPPER T CHORD FWD SPOT PITTING CORR @ STA 344 LBL55 MKD DOT REF AAR N/R 9943079 COMPLETED REPAIR INSTALATION AT MAIN CABIN FLOORBEAM STA 344 BETWEEN LBL 33 TO LBL 67 IAW SRM 53-10-51-2R-10.SDR DALA2025030601755Floorbeam · corrodedSHIP 6708 CORROSION OUT OF LIMITS, IN REF NRC 00364 WIP #5: CORROSION ON BEAM STA 377.7 LBL 14 AT FLOOR STRUCTURE OF CABIN PAX (W1), CORRECTIVE ACTION: SUMMARY OF NRC 00478: CORROSION LEVEL 2 BEAM STA 377.7 LBL 14 AT FLOOR STRUCTURE OF CABIN PAX (W1),WAS R5EPASDR DALA2025031001828Floorbeam · corroded(LOG 0840972) CORROSION AT WET AREA STA 967 R/H SIDE RBL48. REPAIRED CHORD P/N 147 A8540-30 IAW ER/A 624587-14 PRI REV.O. RECIEVED FINAL ERA 624587-14.SDR QXEA2025030700059Floorbeam · corrodedAFT WET AREA HAS CORROSION ON 2EA FASTENERS ON LH FLOORBEAM AT FR 87 AS MARKED. REMOVED AND REPLACED (2) EACH CORRODED RIVETS REF SRM PART II 51-40-08.SDR DALA2025030501727Floorbeam · corrodedSHIP 6708 CORROSION OUT LIMITS IN REF TO NRC 00368: CORROSION ON BEAM BTW STA 365 AND RBL 10 AND RBL 31 AT FLOOR STRUCTURE OF CABIN PAX ( W1), AREA IT IS OUT LIMITS PER B757 -200 SRM 53-00-51-1A PROCEDURE 1 ALLOWABLE DAMAGE 1 FIG. 101 DETAIL III. CORRECTIVE ACSDR IXXA20250422007Floorbeam · corrodedFWD CARGO COMPARTMENT STA 520 ATTACH ANGLE BELOW R/H PDU CORRODED O/B NUTPLATE. REF HAECO WO 320011 NR 34726SDR IXXA20250421006Floorbeam · corrodedFWD CARGO COMPARTMENT STA 500 TOP OF FLOOR BEAM CORRODED AND SPLITTING BELOW LOWER SILL OF CARGO DOOR. REF HAECO WO 320011 NON ROUTINE 34724SDR SWAA2025040701623Floorbeam · corrodedCORROSION ON FLOOR BEAM LOCATED BS 986.5 RBL 43 WL 208.1 AT AFT GALLEY AREA 2025-171968<[01] TOOL USED ON STEP 9 EDDY CURRENT EQUIPMENT P/N: NORTEC 600D S:N 210138103 DUE DATE: 10-JUN-25;[02] PERFORMED PERMANENT REPAIR LOCATED ON FLOOR BEAM BS 986.5 AND RBL 43SDR SWAA2025040815063Floorbeam · corrodedCORROSION ON EXISTING REPAIR LOCATED FLOOR BEAM BS 344 BL 0 WL 208.1 AT FWD GALLEY AREA 2025-171798<[01] TOOL USED ON STEP 7 AND 8 ET EQUIPMENT: P/N: NORTEC 600D; S/N: 60007161486; CAL DUE DATE: 06-SEP-25;[02] REPLACED FILLER 1(E/A) AND FASTENERS COMMON TO EXISDR SWAA2025040800777Floorbeam · corrodedCORROSION ON EXISTING REPAIR LOCATED FLOOR BEAM BS 344 BL 0 WL 208.1 AT FWD GALLEY AREA 2025-171798<[01] TOOL USED ON STEP 7 AND 8 ET EQUIPMENT: P/N: NORTEC 600D; S/N: 60007161486; CAL DUE DATE: 06-SEP-25;[02] REPLACED FILLER 1(E/A) AND FASTENERS COMMON TO EXISDR REXA2025031100302Floorbeam · mechanic errorWHILE PERFORMING SB 670BA-53-036 FOUND MUTIPLE HOLES MISALIGNED BETWEEN THE R/H 36 BEAM (PN SH670-36968-2) AND THE R/H PRESSURE FLOOR HALF (PN SH670-36966-1) BETWEEN FS724-FS792. 36 BEAM REQUIRES REPLACEMENT. REMOVED AND REPLACED NEW SERVICEABLE RBL 36 FLOOSDR AALA202503076923Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON UPPER CHORD OF FLOOR BEAM AT BS 295, LBL 11. REPAIRED FLOOR BEAM UPPER CHORD PER SRM 53-10-51-2R-14.SDR AALA202502282082Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK IN PASSENGER CABIN FLOOR SUPPORT BREAK ASSEMBLY AT BS 540, LBL2. REPLACED BREAK ASSEMBLY PANEL PER AARD 51-00-05-1.SDR AALA202502282765Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK IN PASSENGER CABIN FLOOR SUPPORT BREAK ASSEMBLY AT BS 540, RBL2. REPLACED BREAK ASSEMBLY PANEL PER AARD 51-00-05-1.SDR JJBA20250507024Floorbeam · corrodedFRAME 60 BUTTLINE 0 FLOORBEAM HAS CORROSION AROUND NUTPLATES. REMOVED CENTER BEAM FOR FLIGHT CONTROL CABLES AT FR61. REMOVED BOTTOM CARBON FIBER PIECE ON FR61. REMOVED AND REPLACED GUSSET BETWEEN FR60 AND 61. INSTALLED BOTTOM CARBON FIBER PIECE ON FR61. INSTALSDR AALA202503058342Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK IN PASSENGER CABIN FLOOR SUPPORT BREAK ASSEMBLY PANEL AT STA 540 FROM BL 0 TO RBL 24. REPLACED BREAK ASSEMBLY PANEL PER AARD 51-00-05-1.SDR AALA202503046233Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK IN PASSENGER CABIN FLOORBOARD SUPPORT BREAK ASSEMBLY PANEL AT BS 540 FROM LBL 0 TO LBL 24. REPLACED BREAK ASSEMBLY PANEL PER AARD 51-00-05-1.SDR FDEA202502260296Floorbeam · noneEXISTING REPAIR ON MAIN DECK CROSSBEAM AT FR64 BETWEEN -Y1456 AND -Y1959 REQUIRES EVALUATION FOR CONFORMITY. THE EXISTING REPAIR ON MAIN DECK CROSSBEAM AT FR64 BETWEEN -Y1456 AND -Y1959 WAS EVALUATED AND FOUND IN CONFORMITY WITH A300-600F SRM53-10-15-201 SDR FDEA202502260295Floorbeam · crackedMAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE - CROSSBEAM CRACKED AT FR32, BETWEEN Y1456 AND Y1959 COMPLIED WITH EA:6-5310-T0382537 P1. TITLE: FUSELAGE - MAINFRAME - CRACK ON FR32 CROSSBEAM, BETWEEN Y1456 AND Y1959. REPAIRED THE CRACKED CROSSBEAM AT MAIN DECSDR FDEA202502260294Floorbeam · crackedMAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE - CROSSBEAM CRACKED, AT FR30, BETWEEN Y1456 AND Y1959. COMPLIED WITH EA:6-5310-T0382538 P1. TITLE: FUSELAGE - MAINFRAME - CRACK ON FR30 CROSSBEAM, BETWEEN Y1456 AND Y1959. REPAIRED THE CRACKED CROSSBEAM AT MAIN DSDR N6WA2025022703Floorbeam · corroded280 BEAM IS CRACKED AND CORRODED. REMOVED AND REPLACED 280 BEAM IAW CRJ SRM 51-42-06, SRM 51-42-21 AND SRM 51-42-10.SDR N6WA2025022604Floorbeam · crackedLH COCKPIT FLOOR BEAM LBL 280.00 IS CRACKED. PERFORMED REPAIR ON LH COCKPIT FLOOR BEAM AT LBL 280.00 IAW EO-C550-53MR-052.SDR SWI2025F00501Floorbeam · corrodedLBL 9.00 IS CORRODED ON THE INBOARD FLANGE FROM F.S. 409-00 TO F.S. 409.00+112 (C-CHECK RO 04/21/2025)REPLACED LBL 9 FLOOR BEAM CAP AT FS 409 - FS 409+112 IAW CRJ 200 SRM 51-42-21, 51-42-22. AND 51-42-36. COMPLETED TASK CARD 51-900-1003-SKY AND ATTCHED COMPLESDR SWI2025F00500Floorbeam · corrodedRBL 9.00 IS CORRODED ON THE INBOARD FLANGE FROM F.S. 409.00 TO F,S. 409.00+112. (C-CHECK RO 04/21/2025) REPLACED RBL 9 FLOOR BEAM CAP AT FS 409 - FS 409+112 IAW CRJ 200 SRM 51-42-21, 51-42-22. AND 51-42-36. COMPLETED TASK CARD 51-900-1003-SKY AND ATTCHED COMSDR DALA2025022701518Floorbeam · corroded(LOG 0827038) CORROSION ON FLOOR BEAM WL-208, STA-986.5, FROM RBL-29 TO RBL-44. COMPLIED AND ACCOMPLISHED ER/A 624221-14 REV 0 ON FLOOR BEAM STA 986.5 FROM LBL 50-RBL 50.SDR JR2R20250224633Floorbeam · crackedANGLE CLIP ON THE FWD SIDE OF FLOOR BEAM 12 BL 0 CRACKED.SDR SWI2025F00510Floorbeam · dentedFS 280.00 LBL 9.0 INBOARD FLOOBEAM CLIP IS CRACKED (C-CHECK RO 04/21/2025)INSTALLED NEW SERVICABLE FS 280 LBL 9 CLIP P/N 601R-53-11-171-2 IAW SRM 51-42-21 AND 51-42-22. COMPLETED TASK CARD 51-900-1003-SKY AND ATTACHED FORM 337. NO WEIGHT CHANGESDR SWI2025F00509Floorbeam · crackedFS 280.00 RBL 9.0 INBOARD AND OUTBOARD FLOORBEAM CLIPS ARE CRACKED (C-CHECK RO 04/21/2025)REPLACED FS 280 RBL9 CLIP IAW CRJ 200 SRM 51-42-21 AND 51-42-22. COMPLETED TASK CARD 51-900-1003-SKY AND ATTACHED COMPLETED 337. NO WEIGHT CHANGESDR SWI2025F00504Floorbeam · corrodedFLOORBEAM CAP CORRODED AROUND NUTPLATE AT RBL27 BETWEEN FS605.00 AND FS621.00. (C-CHECK RO 04/21/2025)REPAIRED FLOORBEAM CAP CORRODED AROUND NUTPLATE AT RBL 27 BETWEEN FS 605.00 AND FS621.00 IAW CRJ 200 SRM 51-21-06 AND REO 601R-53-00-005 REV B DATED 2011/01/SDR SWI2025F00503Floorbeam · corrodedRH FLOORSILL CORRODED JUST FWD OF FS621.00. (C-CHECK RO 04/21/2025)REPAIRED RH FLOOR SILL CORROSION JUST FWD OF FS 621.00 IAW GREO 601R-53-00-526 REV -- DATED 22 MAY-2013. COMPLETED TASK CARD 51-900-1003-SKY AND COMPLETED FORM 337. NO WEIGHT CHANGESDR SWI2025F00502Floorbeam · corrodedFLOORBEAM CAP CORRODED AT RBL9 BETWEEN FS559+16 TO FS559+64. (C-CHECK RO 04/21/2025)REPAIRED FLOORBEAM CAP CORRODED AT RBL 9 BETWEEN FS 559+16 TO FS559+64 IAW CRJ 200 SRM 51-21-06 REO 601R-53-00-005 REV B DATED 2011/01/00 REF ATTACHED CONTINUATION CARD FOR DESDR DALA2025022601496Floorbeam · corroded(LOG 0824296) CORROSION ON AREAS SEVERAL OF FLOOR BEAM IN STA 947.5 AND BTW RLB 55/LBL 55 AT PAX CABIN. (W-2). FLOOR BEAM IN STA 947.5 AND BTW RBL 55 TO LBL 55 AT PAX CABIN WERE REPAIRED PER B737-800 SRM 53-70-51-2R PROCEDURE 5 REPAIR 5.SDR SWI2025F00514Strap · corrodedFS 559.00 STRAP UPPER SURFACE CORRODED RBL 36.0- RBL 45.0 (C-CHECK RO 04/21/2025)REPLACED RBL 36 -45 FS 559 STRAP IAW CRJ 200 SRM 51-42-06 AND 51-42-22. COMPLETED TASK CARD 51-900-1003-SKY AND ATTACHED COMPLETED FORM 337. NO WEIGHT CHANGE NOTED.SDR AALA202503269494Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FORWARD CABIN FLOOR BEAM AT FR 16 AND +Y765. REPLACED FLOOR BEAM PER SRM 51-42-11.SDR AALA202503104780Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOORBEAM UPPER CHORD (T-CAP) AT STA 947, LBL 30. REPAIRED CHORD PER SRM 53-70-51-2R-5 AND EA 362687.
Back to JASC 5315