JASC 5321
Service difficulty reports · 49,350
Reports filed under 5321 · Fuselage Floor Panel, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5321' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5321' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR DALA2023030601644None · noneSHIP 694 CORROSION ON RH SIDE PANEL FROM STA 1310 TO 1380 AT AFT CARGO COMPARTMENT. CORRECTIVE ACTION: SUMMARY OF NRC 00244: SIDE PANEL ON FROM STA 1310 TO 1380 AT AFT CARGO COMPARTMENT WAS REPAIRED PER DWG 146N5391 AND B757-200 SRM. (2654020)SDR DALA2023030601643None · noneSHIP 694 CORROSION ON FLOOR STRINGERS LBL 16, 7, AND RBL 7, 16 BTW STA 1460 TO 1480 AT AFT CARGO COMPARTMENT. CORRECTIVE ACTION: SUMMARY OF NRC 00245 LEVEL CORROSION 2: FLOOR STRINGERS LBL 7, AND RBL 7, 16 BTW STA 1468.5 TO 1471.5 AT AFT CARGO COMPARTMENT WERESDR DALA2023030601642None · noneSHIP 694 IN REFERENCE TO NRC 00238: CORROSION AT FLOOR STRINGERS LBL 10, RBL 7 FROM STA 1330 AND RBL 7, RBL 16 AND LBL 16 ON STA 1375 AT AFT CARGO COMPARTMENT WAS FOUND OUT OF LIMITS. CORRECTIVE ACTION: SUMMARY OF NRC 00609: FLOOR STRINGERS LBL 10, RBL 7 FROM SDR DALA2023030301607None · noneSHIP 694 CORROSION ON PREVIOUS REPAIR FLOOR STRINGER LBL 2 AND LBL 10 BTW STA 1460 TO 1480 AT AFT CARGO COMPARTMENT. CORRECTIVE ACTION: SUMMARY OF NRC 00246: CORROSION ON PREVIOUS REPAIR FLOOR STRINGER LBL 2 BTW STA 1460 TO 1480 AT AFT CARGO COMPARTMENT WAS RESDR DALA2023030301605None · noneSHIP 658 CORROSION AT FLOOR SUPPORT BTWEN STA 680 AND STA 700 LBL 45 APROX UPPER AND LOWER SECTION, PASSENGER CABIN. CORRECTIVE ACTION: SUMMARY OF NRC 00540: FLOOR SUPPORT WAS FABRICATED AND REPLACED PER DWG AND PER B757- 200 SRM. (2652358)SDR SWAA2023041117190Panel · crackedPANEL 212HW HAS CRACK ON END. 8-7<[01] PREPARED FOR REPAIR PANEL 21 HW AS PER B 737 AMM 25-00-00-300-802;[02] CORRECTION#1 PREPARED FOR REPAIR PANEL 212HW; AS PER B737 AMM 25-00-00-300-802;[03] VERIFIED STEP 2. OK TO APPLY REPAIR.;[04] REPAIRED PANEL 212 HW; ASDR DALA2023030301602None · noneSHIP 694 INITIAL INSPECTION: CORROSION ON FRAME DOUBLER BTW STA 1480 AND S-26L TO S-25L AT AFT CARGO COMPARTMENT. CORRECTIVE ACTION: SUMMARY OF NRC 00182: FRAME DOUBLER BTW STA 1480 AND S-26L TO S-25L AT AFT CARGO COMPARTMENT WAS REPLACED PER B757-200 SRM. (26SDR SWAA2023031010944Floor Panel · pulledDOT A24-1 MID CABIN FLOOR PANEL 241AF HAS PULLED COMPOSITE FIBERS ON UPPER SURFACE.<[01] EVALUATED AND FOUND PULLED FIBERS ON UPPER SURFACE TO BE REPAIRABLE IAW SRM 53-00-50-2R-0 REPAIR GENERAL TABLE 201 REPAIR 1<BR>CLEANED AND PREPPED UPPER SURFACE IAW SRM 53SDR SWAA2023031010945Floor Panel · pulledDOT A24-2 MID CABIN FLOOR PANEL 241BF HAS PULLED COMPOSITE FIBERS ON UPPER SURFACE.<[01] EVALUATED AND FOUND MISSING FIBERS AND MULTIPLE DENTS ON UPPER SURFACE. TAP TEST GOOD. FOUND TO BE REPAIRABLE IAW SRM 53-00-50-2R-1.<BR><BR>CLEANED AND PREPPED IAW SRM 53-SDR SWAA2023031010946Floor Panel · pulledDOT A24-3 MID CABIN FLOOR PANEL 231XF HAS PULLED COMPOSITE FIBERS ON UPPER SURFACE.<[01] EVALUATED AND FOUND PULLED FIBERS ON UPPER SURFACE TO BE REPAIRABLE IAW SRM 53-00-50-2R-0 REPAIR GENERAL TABLE 201 REPAIR 1<BR>CLEANED AND PREPPED UPPER SURFACE IAW SRM 53SDR SWAA2023031010947Floor Panel · pulledDOT A24-4 MID CABIN FLOOR PANEL 231YF HAS PULLED COMPOSITE FIBERS ON UPPER SURFACE.<[01] EVALUATED AND FOUND MISSING FIBERS AND MULTIPLE DENTS ON UPPER SURFACE. TAP TEST GOOD. FOUND TO BE REPAIRABLE IAW SRM 53-00-50-2R-1.<BR><BR>CLEANED AND PREPPED IAW SRM 53-SDR SWAA2023031010948Floor Panel · pulledDOT A24-5 MID CABIN FLOOR PANEL 241CF HAS PULLED COMPOSITE FIBERS ON UPPER SURFACE.<[01] EVALUATED AND FOUND PULLED FIBERS ON UPPER SURFACE TO BE REPAIRABLE IAW SRM 53-00-50-2R-0 REPAIR GENERAL TABLE 201 REPAIR 1<BR>CLEANED AND PREPPED UPPER SURFACE IAW SRM 53SDR SWAA2023031010949Floor Panel · pulledDOT A24-6 MID CABIN FLOOR PANEL 232SF HAS PULLED COMPOSITE FIBERS ON UPPER SURFACE.<[01] EVALUATED PANEL 232SF AND FOUND PULLED FIBERS AND DENTS ON UPPER SURFACE. FOUND TO BE REPAIRABLE. IAW B737-700 SRM 53-00-50-2R-1. CLEAN AND PREP. IAW B737-700 SRM 53-00-50SDR SWAA2023031010950Floor Panel · pulledDOT A24-7 MID CABIN FLOOR PANEL 232RF HAS PULLED COMPOSITE FIBERS ON UPPER SURFACE.<[01] EVALUATED PANEL 232RF AND FOUND PULLED FIBERS ON UPPER SURFACE AND DAMAGE TO CORE AT O/B CORNER. FOUND TO BE REPAIRABLE. IAW B737-700 SRM 53-00-50-2R-1 & 53-00-50-2R-10.CLSDR DALA2023030301592None · noneCORROSION FLOOR BEAM +Y765 LOCATED BTW FR 64 TO FR 66 AT AFT GALLEY A. REPLACED FLOOR BEAM Y765 LOCATED BTW FR 64 TO FR 66 AT AFT GALLEY AREA AS PER A321 SRM 51-42-11 , SRM 51-72-11, DWG D53472000ISSUE AF RELEASE DATE 06-JAN-03 AND DWG D53472904 ISSUE G RELEASSDR DALA2023030201572None · noneSHIP 694 SEVERAL CORROSIONS ON FLOOR STRUCTURE CHANNEL (UPPER/LOWER SKIN) BTW STA 1640-1661 BL 0.0 AT PAX CABIN. CORRECTIVE ACTION: SUMMARY OF NRC 00320 FLOOR STRUCTURE CHANNEL ( UPPER/LOWER SKIN) BTW STA 1640-1661 BL 0.0 AT PAX CABIN WAS REPLACED PER B757-200SDR DALA2023030201571None · noneSHIP 694 IN REFERENCE NRC 00268 : CORROSION OUT OF LIMITS ON WEB BTW STA 1180 AND 1200, AT PAX CABIN. CORRECTIVE ACTION: SUMMARY OF NRC 00571: WEB BTW STA 1180 AND 1200, AT PAX CABIN WAS REPAIRED PER ER/A 606278-14 REV. ORIGINAL SECTION I: PERMANENT REPAIR. (2SDR DALA2023030201570None · noneSHIP 694 CORROSION ALONG ALL FLOOR STRUCTURE BEAM (UPPER FLANGE) ON STA 1640 AT PAX CABIN. CORRECTIVE ACTION: SUMMARY OF NRC 00325: FLOOR STRUCTURE BEAM (UPPER FLANGE) ON STA 1640 AT PAX CABIN WAS REPAIRED PER ER/A 606155-14 REV. ORIGINAL SECTION I: PERMANENT SDR DALA2023030201569None · noneSHIP 694 CORROSION ON LH SIDE PANEL FROM STA 1410 TO 1540 AT AFT CARGO COMPARTMENT. CORRECTIVE ACTION: SUMMARY OF NRC 00236: LH SIDE PANEL FROM STA 1410 TO 1540 AT AFT CARGO COMPARTMENT WAS REPLACED PER B757-200 SRM. (2648415)SDR DALA2023030101536Support Fitting · corroded(LOG 2649613) DURING INSPECTION FOUND CORROSION ANGLE - SUPPORT LOCATED STA 500L AND BTW STR 26L TO STR 26R AT FWD CARGO COMPARTMENT. REPLACED ANGLE - SUPPORT LOCATED STA 500L AND BTW STR 26L TO STR 26R AT FWD CARGO COMPARTMENT AS PER B737-900ER SRM 51-40-02 ASDR DALA2023030101528None · noneSHIP 3354 CORROSION FLOOR STRUCTURE YB1 BTW FR73 TO FR74 AT AFT GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM YB1 LOC. BTW FR73 TO FR74 IN AFT GALLEY AREA. (2649581)SDR DALA2023030101542None · noneSHIP 694 AFTER REMOVAL OF RH SIDE PANEL (STA 1440-1540) AT AFT CARGO COMPARTMENT. CORROSION WAS FOUND ON UPPER ANGLE OF INTERCOSTAL BTW STA 1440-1460 AND STGR 26R-27R IN REF.00235. CORRECTIVE ACTION: SUMMARY OF NRC 00606: INTERCOSTAL ANGLE BTW STA 1440-1460 ANSDR DALA2023030101541None · noneSHIP 694 AFTER REMOVAL OF RH SIDE PANEL (STA 1440-1540) AT AFT CARGO COMPARTMENT. CORROSION WAS FOUND ON UPPER ANGLE OF INTERCOSTAL BTW STA 1480-1500 AND STGR 26R-27R IN REF.00235. CORRECTIVE ACTION: SUMMARY OF NRC 00603: ANGLE OF INTERCOSTAL STA Y=1480 TO Y=1SDR DALA2023022701468None · noneSHIP 3354 CORROSION FLOOR STRUCTURE -Y381 BTW FR75 TO FR76 AT AFT GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM -Y381 BTW FR75 TO FR76 AT AFT GALLEY AREA. (2646941)SDR SWAA2023040510355Structure · crackedCRACK ON WEB FLOOR STRUCTURE LOCATED BTW BS 312 TO BS 328 RBL33 AT FWD GALLEY AREA 2023-142728<[01] REPLACED WEB FLOOR STRUCTURE LOCATED BTW BS 312 TO BS 328 RBL33 AT FWD GALLEY AREA IAW B737-700 SRM 51-10-02 AND SRM 51-40-02 DWG 141A5400 SHEET : 39 REV - . SESDR DALA2023022801505None · noneSHIP 694 CORROSION ON SKIN DOUBLER BTW STA 1480 TO 1500 AND S-28L TO S-29L AT AFT CARGO COMPARTMENT. CORRECTIVE ACITON: SUMMARY OF NRC 00233: SKIN DOUBLER BTW STA 1480 TO 1500 AND S-28L TO S-29L AT AFT CARGO COMPARTMENT WAS REPLACED B757-200 SRM. (2644185)SDR DALA2023022801504None · noneSHIP 694 CRACKED BEAM (UPPER INNER AREA) ON STA 700 BTW RBL 45 AT CPAX CABIN. CORRECTIVE ACTION: SUMMARY OF NRC 00399: CRACKED BEAM (UPPER INNER AREA) ON STA 700 BTW RBL 45 AT CPAX CABIN WAS REPAIRED PER ER/A 606062-14 REV. ORIGINAL SECTION I: PERMANENT REPAIRSDR DALA2023022701428None · noneCRACKED PAN ON AFT EDGE BELOW STOP FITTING #2 AT PASSENGER ENTRANCE DOOR INTERNAL STRUCTURE. SUMMARY OF NRC 00235: PAN ON AFT EDGE BELOW STOP FITTING #2 AT PASSENGER ENTRANCE DOOR INTERNAL STRUCTURE WAS REPAIRED PER B717-200 SRM 52-10-02-2R REPAIR 3. (LP #2644SDR DALA2023022701437Angle · cracked(LOG 2644830) DURING INSPECTION FOUND CRACK ANGLE LOCATED FWD FACE FRAME STA 500I AND STR 26R AT FWD CARGO COMPARTMENT. REPLACED ANGLE AND FASTENERS LOCATED FWD FACE FRAME STA 500I AND STR 26R AT FWD CARGO COMPARTMENT AS PER B737-900ER SRM51-40-02-0G AND DRAWISDR DALA2023022701435Angle · corroded(LOG 2644824) DURING INSPECTION FOUND CORROSION ANGLE - SUPPORT LOC BTW BS 767 AND BS 787 AND AT LEVEL RBL 2 5.2 AT AFT CARGO COMPARTMENT. REPLACED ANGLE - SUPPORT LOC BTW BS 767 AND BS 787 AND AT LEVEL RBL 25.2 AFT CARGO COMPARTMENT AS PER B737-900ER SRM 51-4SDR SWIA2023041000224Unknown · corroded* FLOOR BEAM AT LBL27 HAS CORROSION ON FLOOR PANEL ATTACH FLANGE AT FS559, MARKED (C-CHECK RO 4/5/2023) REPAIRED CORRODED FLOOR PANEL ATTACH FLANGE ON FLOOR BEAM AT LBL27 AT FS559 WITH REPAIR ANGLE AND JOGGLE STRAP PER REO 601R-53-41-3138 REV -- 2023-0SDR SWAA2023040510047Floor Panel · crackedCRACK FLOOR PANEL 242XF AT AFT GALLEY AREA 2023-142652<[01] TOOL USED CALIPER: P/N: 500-464 S/N:B17030933 DUE DATE: 17-OCT-23.;[02] TOOL USED: SCALE P/N: SPX621 S/N: 8340225441 DUE DATE: 20-JUL-23;[03] TOOL USED HOT BONDER P/N: HCS9200B-AV; S/N: 18175478; DUE SDR SWAA2023040510046Floor Panel · delaminatedDELAMINATED FLOOR PANEL 241ADF AT AT AFT GALLEY AREA 2023-142651<[01] TOOL USED CALIPER: 500-196-30 S/N:0000288 DUE DATE: 27-DEC-23.;[02] TOOL USED: HOT BONDER P/N: HCS9000B S/N: 16122983 DUE DATE: 24-JAN-24;[03] TOOL USED SCALE P/N: 1863T62 S/N: AE-40571 DUE SDR DALA2023022701444None · noneSHIP 694 TOOL MARK ON FLOOR BEAM, STA 1380 AND RBL 46 AT AFT CARGO COMPARTMENT. CORRECTIVE ACTION: SUMMARY OF NRC 00184: TOOL MARK ON FLOOR BEAM, STA 1380 AND RBL 46 AT AFT CARGO COMPARTMENT WAS ATTENDED PER PRI 606112-14 REV.0 AND ER/A 606112-14 REV ORIGINAL SDR DALA2023022701441None · noneSHIP 694 SEVERAL CORROSIONS ON ANGLE FLOOR STRUCTURE BTW STA 1020-1040 AND LBL 64 ON PAX CABIN. CORRECTIVE ACTION: SUMMARY OF NRC 00297: CREASE BEAM INBOARD CHORD BTW STA 1020- 1040 AND LBL 64 ON PAX CABIN WAS REPAIRED PER ER/A 606188-14 REV. ORIGINAL SECTION SDR DALA2023022701430None · noneFLOOR NEAR 1ST CLASS COAT CLOSET SEEMS SOFT. REMOVED AND FABRICATED FLOOR PANEL PER B717 AMM 53-21 AND SRM 53-20-50 PG 2. FIG 3. FOUND SUPPORT ANGLE BROKEN AT STA 237. REMOVED, FABRICATED, DRILLED UP, PRIMED, AND PAINTED A NEW SUPPORT ANGLE. INSTALLED FLOOR SUSDR DALA2023022701433None · none(LOG 2643904) DURING INSPECTION FOUND CORROSION ON ZEE PLATE SEVERAL POINTS LBL22 STA727I-787+13 AFT CARGO COMPARTMENT. ZEE PLATE SEVERAL POINTS LBL22 STA727I-787+13 AFT CARGO COMPARTMENT WAS REPAIRED PER B737-900ER SRM 53-00-53-2R PROCEDURE 5 REPAIR 5.SDR DALA2023022501420None · noneCRACKED BEAM ON AFT SECTION BELOW STOP FITTING #2 AT PASSENGER ENTRANCE DOOR INTERNAL STRUCTURE. SUMMARY OF NRC 00236: BEAM ON AFT SECTION BELOW STOP FITTING #2 AT PASSENGER ENTRANCE DOOR INTERNAL STRUCTURE WAS REPAIRED PER B717-200 SRM 52-10-02-2R REPAIR 8. (SDR SWAA2023031309685Floor Panel · faultyCABIN FLOOR BOARD 231DF HAS A BAD SCREW INSERT.<[01] REMOVED AND REPLACED 231DF AS PER AMM 53-21-00.;[02] VERIFIED INSTALLATION OF FLOOR PANEL 231DF AS PER AMM 53-21-00.SDR DALA2023022501418None · noneAFTER REMOVAL OF FORWARD JAM PAN SEALS,CRACK WAS FOUND ON THE FWD SEAL. SUMMARY OF NRC 00626: REPAIR DOUBLER WAS INSTALLED PER B717-200 SRM 53-00-00-2R PROCEDURE 1 REPAIR 1 AND SRM 51-41-02-0G. (LP #2642198)SDR DALA2023022501417None · noneCORROSION ON FLOOR STRUCTURE SUPPORTS ALONG FWD DIAPHRAGM AT CPAX, BTW STA Y=200 TO Y=237 AND BL (-X)=55. SUMMARY OF NRC 00518: CORROSION LEVEL 2. FLOOR STRUCTURE SUPPORTS ALONG FWD DIAPHRAGM AT CPAX, BTW STA Y=200 TO Y=237 AND BL (-X)=55 WERE REPLACED PER B71SDR DALA2023022401398Plate · corroded(LOG 2642214) DURING INSPECTION FOUND CORROSION ON ZEE PLATE RBL24 , STA500L-494 FWD CARGO COMPARTMENT. ZEE PLATE RBL24 STA500L-494 AT FWD CARGO COMPARTMENT WAS REPLACED PER B737-900ER SRM 51-40-02-0G.SDR IPXA2023051393098Floorboard · damagedMAIN CARGO COMPARTMENT FLOOR PANEL REPAIR (SREO) 27379. REF EO-27379 * PARTS REQ 438130 *)***SM13/LMX8*** ALL STEPS COMPLIED WITH, REF SREO-9693-REQ001 T3F18E001DJ6X CLEARING DMISDR ASAA2023022243090Floorboard · corrodedMAIN CABIN FLOOR BOARD AT R2 DOOR UPPER SKIN IS CORRODED IN SEVERAL PLACES. GROUNDED - YES. REMOVED AND REPLACED MAIN CABIN FLOOR BOARD 262LG AT FR66 TO FR68, LBL36 TO LBL60 IAW A321 AMM 53-42-12-000-006-A AND AMM 53-00-00-400-801-A01.SDR V0XD20230313001Beam · corrodedFLOOR LATERAL BEAM AT Y 0.0 TO Y -479 AT FR 20 HAS SIGNS OF CORROSION. REMOVED AND INSTALLED FLOOR LATERAL BEAM P/N:145-20600-603 AND Y 0.0 TO Y - 479 AT FR 20 IAW EMB 145 SRM 51-20-03 AND 51-40-02.SDR DALA2023022401415None · noneCORROSION ON SEAT TRACKS STA Y=200-237 X=-22, STA Y=200-218 X=-44.5 AND STA Y=200 X=22 (CPAX)( W1). SUMMARY OF NRC 00425: CORROSION LEVEL 2. CORROSION WAS REMOVED ON SEAT TRACKS STA Y=200-237 X=-22, STA Y=200-218 X=-44.5 AND STA Y=200 X=22 PER B717-200 SRM 51-SDR DALA2023022401404Floor Support · corroded(LOG 2640927) DURING INSPECTION FOUND CORROSION ON FLOOR SUPPORT BTW RBL31-LBL31 STA500L FWD CARGO COMPARTMENT. FWD CARGO COMPARTMENT, WAS REPLACED PER B737-900ER SRM 51-40-02-0G.SDR DALA2023022401396None · none(LOG 2640729) DURING INSPECTION FOUND CORROSION ON LH ZEE PLATE (LBL24) FROM STA 500D TO 500L AT FWD CARGO COMPARTMENT. LH ZEE PLATE (LBL24) FROM STA 500D TO 500L AT FWD CARGO COMPARTMENT WAS REPAIRED PER B737-900ER SRM 53-00-53-2R PROCEDURE 5 REPAIR 5.SDR DALA2023022401395None · none(LOG 2640684) DURING INSPECTION FOUND BENT CHANNEL SUPPORT ZEE AT LEVEL STR 26R BTW FR STA. 500J AND 500K ATFWD CARGO COMPARTMENT. PERFORMED REPAIR INSTRUCTION ON CHANNEL SUPPORT ZEE AT LEVEL STR 26R BTW FR STA. 500J AND 500K AT FWD CARGO COMPARTMENT AS PER ERSDR DALA2023022301373None · noneAIRCRAFT 3122, CORROSION SHEAR PLATE BTW FR 69 AND FR 70 AT LEVEL STR 23R FLOOR STRUCTURE AT AFT GALLEY AREA (SSI 534147). CORRECTIVE ACTION: REPLACED SHEAR PLATE AND FASTENERS LOC. BTW FR69 TO FR70 AT LEVEL STR23R FLOOR STRUCTURE AT AFT GALLEY AREA AS PER A31
Back to JASC 5321