Aerospatiale AS 355F1
STCs that may be installed · 308
In force first, then newest. The registry doesn’t record which STCs an aircraft has.
Query with SQL
duckdb -csv -c "SELECT s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
FROM (
SELECT stc_number, min(matched_model) AS matched_model
FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet'
WHERE aircraft_model_code IN ('8680810')
GROUP BY stc_number
) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number"Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
FROM (
SELECT stc_number, min(matched_model) AS matched_model
FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet'
WHERE aircraft_model_code IN ('8680810')
GROUP BY stc_number
) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_numberRun it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
STC SH1889CEInstallation of Collins force trim system and avionics equipment.STC SH3742SWInstallation of continuous ignition kit No. 355-000-01.STC SH7381SWInstallation of a self contained, tamper proof, flight hourmeter.STC SH748NWInstallation of a weighing system.STC SH4454SWInstallation of exterior markings.STC SH3599SWInstallation of ASI-3900 litter.STC SH4805SWInstallation of auxiliary step assembly.STC SH5901SWInstallation of courtesy lights.
Back to Aerospatiale AS 355F1