Amazon Logistics MK27
Service difficulty reports · 17
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'MK27' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'MK27' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR 4MZA20220211026Mount · crackedDURING SCHEDULED MAINTENANCE INSPECTION, FOUND CRACK IN MOTOR MOUNT ON RH SPAR #2.SDR 4MZA20220118025Mount · crackedDURING SCHEDULED MAINTENANCE INSPECTION, CRACK FOUND IN MOTOR MOUNT OF SPAR #5.SDR 4MZA20220118024Mount · crackedDURING SCHEDULED MAINTENANCE INSPECTION, FOUND TWO CRACKS IN MOTOR MOUNT OF SPAR #5SDR 4MZA20211013022Mount · crackedDURING SCHEDULED MAINTENANCE INSPECTION, CRACK DISCOVERED IN MOTOR MOUNT OF SPAR #2.SDR 4MZA20210914021Mount · crackedWHILE PERFORMING 2.5 HOUR INSPECTION, HAIRLINE CRACK WAS OBSERVED ON SPAR #5 MOTOR MOUNT.SDR 4MZA20210914020Mount · crackedDURING MOTOR CHANGE, A CRACK WAS OBSERVED ON #5 SPAR IN MOTOR MOUNT AREA.SDR 4MZA20210908019Mount · crackedDURING SCHEDULED MAINTENANCE INSPECTION, FOUND CRACK IN MOTOR MOUNT OF SPAR #5.SDR 4MZA20210819018Mount · crackedDURING SCHEDULED MAINTENANCE INSPECTION, FOUND CRACK IN MOTOR MOUNT OF SPAR #5.SDR 4MZA20210819017Mount · crackedDURING SCHEDULED MAINTENANCE INSPECTION, FOUND CRACK IN MOTOR MOUNT OF SPAR #2.SDR 4MZA20210818016Mount · crackedDURING SCHEDULED MAINTENANCE INSPECTION, FOUND CRACK IN MOTOR MOUNT OF SPAR #2.SDR 4MZA20210817015Mount · crackedDURING SCHEDULED MAINTENANCE INSPECTION, FOUND CRACK IN MOTOR MOUNT OF SPAR #5.SDR 4MZA20210527014Mount · crackedDURING SCHEDULED MAINTENANCE INSPECTION, FOUND CRACK IN MOTOR MOUNT OF SPAR #2.SDR 4MZA20210526013Hub · debondedQUALITY ESCAPE OF NEW PART FROM OUTSIDE VENDOR. METALLIC HUB WITHIN CARBON FIBER ROTOR UNSEATED. EVIDENCE OF
INADEQUATE BOND NOTED DURING POST INSPECTION.SDR 4MZA2021062510011Mount Bracket · crackedDURING SB20-54-001 INSPECTION, FOUND CRACK IN MOTOR MOUNT OF SPAR #5.SDR 4MZA20210510012Mount · crackedDURING SB20-54-001 INSPECTION, FOUND CRACK IN MOTOR MOUNT OF SPAR #5.SDR 4MZA20210505010Mount · crackedDURING SCHEDULED MAINTENANCE INSPECTION, FOUND CRACK IN MOTOR MOUNT OF SPAR #5.SDR 4MZA20210505009Mount · crackedDURING CHEDULED MAINTENANCE, FOUND A CRACK IN THE MOTOR MOUNT OF SPARS 2 AND 5.
Back to Amazon Logistics MK27