Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = '7272A7' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = '7272A7' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR EISA96113Skin · crackedUPPER TRAILING EDGE SKIN CRACKED FORWARD OF BOTH CENTER HINGE CUT-OUTS, NR 1 SPOILER. FABRICATED AND INSTALLED REPAIR PER SRM 57-30-04. TT: 66,991:57 HOURS. TC: 45,084. (X)SDR EISA96112Skin · delaminationRIGHT OTBD AILERON TAB HAS DENT WITH DELAMINATION ON LOWER SURFACE AT 3RD HINGE FROM INBD END. FABRICATED NEW FILLER AND DOUBLER. ACCOMPLISHED HOT BOND REPAIR PER SRM 51-40-06. TT: 66,991:57 HOURS. TC: 45,084. (X)SDR EISA96111Skin · separatingRIGHT OUTBOARD AILERON TAB'S PREVIOUS REPAIR DETERIORATING AND SEPARATING AT T/E. FABRICATED NEW FILLERS AND DOUBLERS. ACCOMPLISHED HOT BOND REPAIR PER SRM 51-40-06. TT: 66,991:57 HOURS. TC: 45,084. (X)SDR EISA96110Carriage · crackedLEADING EDGE OF RT OTBD FOREFLAP HAS 1.375 INCH CRACK ABOVE OTBD SEQUENCE CARRIAGE. STOP DRILLED CRACK. FABRICATED AND INSTALLED REPAIR PER SRM 57-50-04. TT: 66,991:57 HOURS. TC: 45,084. (X)SDR EISA96109Web · crackedAFT AIRSTAIR ACTUATOR ATTACH POINT DOUBLER, INSIDE TORQUE BOX, IS CRACKED AT UPPER WEB FS 1263. FABRICATED NEW DOUBLER AND INSTALLED WITH FILLER NAD RADIUS BLOCK PER SRM 51-40-03. TT: 66,991:57 HOURS. TC: 45,084. (X)SDR EISA96108Web · crackedSIDE WEB CRACKED AT LIGHTENING HOLE JUST AFT OF RT AFT AIRSTAIR STRUT FS 1310. INSTALLED DOUBLER PER SRM 51-40-02. TT: 66,991:57 HOURS. TC: 45,084. (X)SDR EISA96107Tip Filler · brokenLEFT ELEVATOR OUTBOARD AFT TIP IS BREAKING. REMOVED AND REPLACED TIP FILLER PER SRM 51-30-02. TT: 66,991:57 HOURS. TC: 45,084. (X)SDR EISA96106Tip Filler · brokenRIGHT ELEVATOR OUTBOARD T/E TIP IS BREAKING. REMOVED AND REPLACED ITP FILLER PER SRM 51-30-2. TT: 66,991:57 HOURS. TC: 45,084. (X)SDR EISA96105Counterweight · delaminatedLEFT ELEVATOR TAB BOB WEIGHTS HAVE DELAMINATION. APPLIED FIBERGLASS OVERLAY PER 51-40-06. (X)SDR EISA96104Counterweight · delaminationRIGHT ELEVATOR TAB BOB WEIGHTS HAVE DELAMINATION. APPLIED FIBERGLASS OVERLAY PER SRM 51-40-06. (X)
Back to Boeing 727-2A7