Boeing 737-287C
STCs that may be installed · 671
In force first, then newest. The registry doesn’t record which STCs an aircraft has.
Query with SQL
duckdb -csv -c "SELECT s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
FROM (
SELECT stc_number, min(matched_model) AS matched_model
FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet'
WHERE aircraft_model_code IN ('13844AX')
GROUP BY stc_number
) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number"Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
FROM (
SELECT stc_number, min(matched_model) AS matched_model
FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet'
WHERE aircraft_model_code IN ('13844AX')
GROUP BY stc_number
) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_numberRun it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
STC SA2258WEThe installation of Firestone 40 X 14-21 tires at 40% tire deflection per sealed Piedmont Service Evaluation Report SER Number 70-18, and Supplement "A" to Airplane Flight Manual Dt-8737, 201STC SA9PCInstallation of Bendix Main Wheel AssemblySTC ST430SOInstallation of unusual events recording system.STC ST01091SEFabrication of lightweight window plugsSTC ST01504AT-DInstallation of complete provisions for a Trimble 2101I/O GPS.STC ST01796WIInstallation of an AV201 series Portable Oxygen UnitSTC SA2050SOInstallation of passenger interior.STC SA00968LAInstallation of Rockwell Collins Air Transport System TCAS II system.STC ST00968LAInstallation of Rockwell Collins Air Transport Systems TCAS II System.STC ST01462LA-DInstallation of Honeywell Enhanced Ground Proximity Warning System.STC ST01796LAInstallation of Rockwell Collins FPI-930 5 ATI LCD EADI & EHSI, WXR-700X Basic Turbulence Weather Radar System, and Honeywell Compass SystemSTC ST01797LAInstallation of Honeywell Mark VII Enhanced Ground Proximity Warning System (EGPWS)STC ST00170LA-DInstallation of provisions for the seat back telephones in passenger seats.STC ST00397LA-DONE-ONLY STC: Installation of first class passenger seats and tables, S/N 19440.STC ST00761LA-DInstallation of Rockwell Collins CMU-900 ACARS and VHF-700 #3 VHF Radio Provisions.STC ST00762LA-DInstallation of Flight Data Recorder expanded parameters.STC SA4214NM-DInterior reconfiguration including installation of G-2 galley and class divider.STC SA4184NM-DInstallation of class dividers.STC ST01143SE-DInstallation of a new security flight deck door in accordance with Jamco America Inc. Master Drawing List (MDL) No. IA-085COAMDL, Revision AL, dated December 10, 2008, or later Federal Aviation Administration (FAA) approved revision.STC SA1082NWInstallation of auxiliary fuel tanks in the aft cargo compartment. (737 series -2K9A)STC ST02688ATInstallation of Rockwell/Collins CMU-900 ACARS System in accordance with Aircraft Engineering and Installation Services Master Drawing List 234-03-0003 Rev. A dated 16 July 2003 or later FAA approved revision.
Back to Boeing 737-287C