Boeing 747-422
Service difficulty reports · 9,801
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = '747422' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = '747422' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR UALA2012082404743Light · inoperativeTHE 33H SEAT EEL LIGHT INOPERATIVE. REPLACED EEL LIGHT ASSY REF WDM 33-51-53 AND OPS CHECKED GOOD.SDR UALA2012082004618Fuse · faultyRIGHT OVERWING EMERGENCY LIGHT INOPERATIVE. REPLACED FUSE IN POWER SUPPLY, OPS CHECKED OKAY.SDR UALA2012082004617Feeder Cable · damagedEMERGENCY LIGHT ALONG STAIRS UPPER DECK INOPERATIVE. REPLACED EMERGENCY LIGHT CABLE, OPS CHECKED GOOD.SDR UALA2012082004615Light · inoperativeL4 DOOR FWD EMERGENCY EXIT SIGN INOPERATIVE. SECURED EMERGENCY LIGHT, OP CHECKED NORMAL.SDR UALA2012082004614Connector · unsecureEMERGENCY LIGHT INOPERATIVE. SECURED CONNECTOR, OP CHECKED NORMAL.SDR UALA2012082004613Connector · unsecureEMERGENCY LIGHT ROW 45 THRU 53 LT INOPERATIVE. SECURED EMERGENCY LIGHT CONNECTOR. OPS CHECKED NORMAL.SDR UALA2012082004612Lamp · inoperativeEMERGENCY LIGHT ALONG R2 DOOR, TWO LIGHTS INOPERATIVE. REPLACED LAMPS, OP CHECKED NORMAL.SDR UALA2012082004611Light · unsecureEXTERIOR EMERGENCY LIGHTS ARE FALLING OFF. SECURED EMERGENCY LIGHTS, OPS NORMAL.SDR UALA2012082004606Light · inoperativeCENTER AND RIGHT EEL LIGHTS AT DOOR 2 CROSSAISLE INOPERATIVE. RELAMPED, OPS NORMAL.SDR UALA2012082004605Light · inoperativeTOP EEL LIGHT AT CORNER OF LAV 101 INOPERATIVE. RELAMPED, OPS NORMAL.SDR UALA2012082004604Light · inoperativeEMERGENCY CEILING LIGHT AT LAV 101 INOPERATIVE. RELAMPED, OPS NORMAL.SDR UALA2012082004603Light · inoperativeEMERGENCY SLIDE LIGHT AT DOOR 1L INOP. RELAMPED, OPS NORMAL.SDR UALA2012082004602Connector · unsecureSTAIRWAY EEL LIGHTS INOPERATIVE. RE-SECURED EMERGENCY LIGHT CONNECTOR, OP CHECK NORMAL.SDR UALA2012082104653Control Panel · faultedCOCKPIT DOOR DENY HORN DOES NOT SILENCE WHEN DENY IS SELECTED. REPLACED PEDESTAL PANEL P8, OPS CHECKED PER MM AND CHECKED DENY MODE TEST PER MM 52-51-00 PG 505 PASSED. TESTED PER MM 52-51-00 PG 501 PASSED.SDR UALA2012082004631Float Valve · leakingLEFT WING FLUID LEAK. ACFT BACK TO GATE WITH NR 2 MAIN OVERFILL AND SHOW 84.0 LEFT HYDRO MECHANICAL FUEL SYSTEM DEACTIVATED AS PER MEL 2815J. STRAINER REMOVED AND STOWED IN PART BIN D2L. LEFT STRAINER INSTALLED. REPLACED SCAVENGE SYSTEM FLOAT VALVE.SDR UALA2012082004630Line · leakingNR 2 ENGINE LEAKING FUEL FROM MAIN FUEL SUPPLY LINE. REPLACED NR 2 ENG MAIN FUEL FEED LINE PER MM, NO LEAKS NOTED AFTER WET MOTOR AND 5 MINUTE IDLE RUN.SDR UALA2012081704584Fuse · inoperativeEMERGENCY EXIT LIGHTS INOPERATIVE. REPLACED FUSE. LIGHTS OPS CHECKED NORMAL.SDR UALA2012081704583Connector · shortedEMERGENCY LIGHTS INOPERATIVELOWER. FOUND WATER PUDDLING IN GALLEY AREA UNDER GALLEY MAT AT EMERGENCY LIGHT CONNECTOR SHORTING LIGHTS. DRIED AREA, EMERGENCY LIGHTS OPS CHECKED NORMAL AT PRESENT TIME.SDR UALA2012081704582Lamp · inoperativeEMERGENCY EXIT LIGHT INOPERATIVE. REPLACED LAMP IAW AMM, OPS CHECKED GOOD.SDR UALA2012081704585Lamp · inoperativeEMERGENCY EXIT LIGHT INOPERATIV, REPLACED LAMPS, OPS NORMAL.SDR UALA2012081604571Scavenge Pump · failedCENTER FUEL TANK HAS 1100 LBS TRAPPED FUEL. REPLACED SCAVENGE PUMP AND PRESSURE SWITCH. ALL OPS CHECKED GOOD. AIR AND GROUND MODE.SDR UALA2012081504525Lamp · inoperativeEMERGENCY CEILING LIGHT ALONG STAIRS INOPERATIVE. REPLACED LAMPS PER MM, OP CHECKED NORMAL.SDR UALA2012081504524Light · inoperativeEMERGENCY LIGHT ROW 45L INOPERATIVE. REPLACED EMERGENCY LIGHT, OP CHECKED NORMAL.SDR UALA2012081504523Lamp · inoperativeEMERGENCY CEILING LIGHT ABOVE STAIRS INOPERATIVE. REPLACED LAMPS PER MM, CHECKED NORMAL.SDR UALA2012081504522Light · inoperativeEMERGENCY LIGHT ROW 57L INOPERATIVE. REPLACED EMERGENCY LIGHT, OPS CHECKED NORMAL.SDR UALA2012081504521Light · inoperativeEMERGENCY LIGHT ROW 38 RT INOPERATIVE. REPLACED EMERGENCY LIGHT. OPS CHECKED NORMAL.SDR UALA2012081504520Lamp · inoperativeEMERGENCY CEILING LIGHT ROW 13 AB INOPERATIVE. REPLACED LAMP PER MM, CHECKED NORMAL.SDR UALA2012081504519Lamp · inoperativeEMERGENCY LIGHT ALONG FWD GALLEY L2 DOOR INOPERATIVE. SUPPLEMENTAL DATA UPDATE, RELAMPED, OP CHECKED NORMAL.SDR UALA2012081504518Light · inoperativeEMERGENCY OVERWING LIGHT LT LOWER INOPERATIVE. REPLACED LT LOWER EXT EMERGENCY LIGHT ASSY, OPS CHECKED NORMAL.SDR UALA2012081504517Fuse · inoperativeOVERWING RT EMERGENCY LIGHT 2 TOP INOPERATIVE. REPLACED FUSE IN BATTERY CHARGER OVERWING RT EXIT DOOR, OPS CHECKED NORMAL.SDR UALA2012081304487Light · inoperativeSEAT EMERGENCY LIGHTS INOPERATIVE AT 20C. LIGHT CHECKED OK.SDR UALA2012081304464Light · inoperativeEMERGENCY PATHWAY STRIP LIGHT AT 40C IS INOPERATIVE. REPLACED STRIP, ALL OPS NOW NORMAL.SDR UALA2012081304476Shear Tie · crackedBS 1120 FRAME RT SIDE AT SHEAR TIE CRACKED. REPLACED FRAME.SDR UALA2012081304470Skin · wornFOUND RT FUSELAGE SKIN WORN AT INTERFACE WITH VERTICAL STABILIZER SEAL BETWEEN BS 2552 & 2628. INSTALLED EXTERNAL REPAIR DOUBLER IAW ECRA 5331-01619.SDR UALA2012081304469Skin · crackedFUSELAGE SKIN ABOVE R1 DOOR IS CRACKED. INSTALLED EXTERNAL REPAIR DOUBLER IAW SRM 53-10-01 RPR 3.SDR UALA2012081304468Skin · crackedFUSELAGE SKIN ABOVE L1 DOOR CRACKED. INSTALLED EXTERNAL DOUBLER REPAIR IAW SRM 53-10-01 RPR 3.SDR UALA2012081304467Gate · corrodedR3 DOOR LOWER GATE CORRODED. REPLACED LWR GATE IAW CMM 52-11-41.SDR UALA2012081304466Structure · crackedBS 2521 RT UPPER LOBE DOUBLER CRACKED. INSTALLED REPAIR DOUBLER IAW ECRA 5313-01047.SDR UALA2012081304465Structure · crackedBS 2521 LT UPPER LOBE DOUBLER CRACKED. INSTALLED REPAIR DOUBLER IAW ECRA 5313-01046.SDR UALA2012081304463Wire · arcedAFT GALLEY PIGTAIL REPORTED TO BE ARCING JUST PRIOR TO DEPARTURE. FOUND P43 PIGTAIL DAMAGED DUE ARCING WHICH WAS CAUSED BY A DEFECTIVE CART. POSITION HAS BEEN ISOLATED CIRCUIT BREAKER PULLED AND COLLARED. CABLE AND RESET CIRCUIT BREAKER, OPS CHECKED WITH TESDR UALA2012081304460Floor Support · corrodedBS 940-980 MAIN DECK FLOOR SUPPORT CORRODED. MANUFACTURED AND INSTALLED NEW FLOOR SUPPORT IAW ECRA 5320-02092.SDR UALA2012081304459Structure · crackedBS 2120 LOWER LOBE UPPER CAP CRACKED. REPLACED UPPER CAP PER ECRA 5320-02093.SDR UALA2012081304458Tension Tie · damagedBS 1220 TENSION TIE CHANNEL TWO 0.375 INCH OVERSIZED HOLES. SUPPLEMENTAL DATA UPDATE, VERIFIED HOLES ARE CRACK FREE BY HFEC. INSTALLED OVER-SIZE FASTENERS PER ECRA 5310-05551.SDR UALA2012081304371Battery Pack · inoperativeEMERGENCY LIGHT IS NOT ILLUMINATED IN THE FLIGHT DECK. BATTERY PACK REPLACED.SDR UALA2012081404494Fuel Cell · leakingAFTER ACFT TOW BACK ON TAXI WAY, LT NASA'S COOP VENT HAD CONTINUING FUEL LEAKING AFTER ACFT BACK TO STAND. FOUND NR 2 TANK HAS 1400 LBS FUEL MORE THAN NR 3 AND OVERFILL LIGHT ILLUMINATES, FUEL DRAINED FROM NR 2 SURGE TANK AND FUEL TRANSFERRED TO CENTER, OVERFSDR UALA2012081304447Connector · unsecureEMERGENCY SIGN AT 4L DOOR FOUND INOPERATIVE. SECURED EMERGENCY LIGHT CONNECTOR, OPS CHECKED NORMAL.SDR UALA2012081304446Connector · unsecureMAIN GALLEY 4L DOOR FWD AND SIDEWALL EMERGENCY LIGHT INOPERATIVE. SECURED EMERGENCY LIGHT CONNECTOR. OPS CHECKED NORMAL.SDR UALA2012081304445Connector · contaminatedEMERGENCY LIGHT ROW 45 THRU 54 INOPERATIVE. CLEANED AND DRIED EMERGENCY CONNECTOR. OPS CHECKED NORMAL.SDR UALA2012081304441Tension Tie · crackedBS 1120 RT FWD TENSION TIE HAD TWO HOLES CRACKED. REMOVED DAMAGE, INSTALLED REPAIR PARTS IAW SRM 53-40-30 RPR 1.SDR UALA2012081304442Tension Tie · crackedSTA 1140 RT AFT TENSION TIE 1 EACH HOLE CRACKED. REMOVED DAMAGE, INSTALLED REPAIR PARTS PER SRM 53-40-30 RPR 1.
Back to Boeing 747-422