Boeing 747-422
Service difficulty reports · 9,801
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = '747422' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = '747422' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR UALA2012061203242Lens · missingEEL LIGHT AT SEAT 4K MISSING LENS. REPLACED LENS COVER AT 4K. OPS NORMAL.SDR UALA2012061203241Lamp · inoperativeFLIGHT DECK EMERGENCY LIGHT INOPERATIVE. RELAMPED, OPS CHECKED NORMAL .SDR UALA2012061203240Light · failedEMERGENCY LIGHTS DIM FROM ROW 45 UP TO ROW 53 LEFT SIDE AND GALLEY LOWER WALL INOPERATIVE. REMOVED WATER UNDER CARPET AND REPLACED EMERGENCY LIGHT AT LOWER WALL.SDR UALA2012061203245Skin · crackedRIGHT NR 2 MED EXTERNAL SKIN CRACK AT UPPER HINGE CUTOUT. CATEGORY B REPAIR ACP IAW SRM 52-10-01 REPAIR 3. PER SRM TABLE 2, INSPECTION REQUIRED EVERY 3,000 CYCLES. REMOVABLE STRUCTURAL COMPONENT (RSC) MARKED PER 51-00-80. CF STICKER APPLIED. INSPECTIONS TSDR UALA2012061203244Structure · crackedBS 140-160 BL 0 TO RBL 50 FLOOR TO SKIN SHEAR TIE INSTALLATION CRACK REPAIRED. INSPECTION REQUIRED AT 3,000 FLIGHT CYCLE INTERVAL WITH A THRESHOLD OF 25,927 AIRFRAME TOTAL CYCLES. ACCOMPLISH DETAILED VISUAL INSPECTION IAW PART 2 OF ECRA 5311-01552 BEGINNING SDR UALA2012061103228Connector · contaminatedEMERGENCY LIGHTS INOPERATIVE, SEAT ROWS 45 THRU 53 LEFT, FOUND WATER PUDDLING IN GALLEY AREA UNDER GALLEY MAT AT EMERGENCY LIGHT CONNECTOR SHORTING. DRIED AREA OF WATER, OPS CHECKED NORMAL.SDR UALA2012061103227Power Supply · inoperativeEMERGENCY LIGHTS VERY DIM SEAT ROWS 33 THRU 43 LEFT. REPLACED POWER SUPPLY, OPS CHECKED NORMAL.SDR UALA2012061103226Lamp · inoperativeFWD STAIRWELL CEILING EMERGENCY LIGHT INOPERATIVE, RELAMPED, OPS CHECKED NORMAL.SDR UALA2012061103225Lamp · inoperativeEMERGENCY LIGHT INOPERATIVE SEAT ROW 23 RIGHT. RELAMPED, OPS CHECKED NORMAL.SDR UALA2012061103224Lamp · inoperativeEMERGENCY LIGHT INOPERATIVE IN FLIGHT DECK CEILING. RELAMPED, OPS CHECKED NORMAL.SDR UALA2012061103223Lamp · inoperativeEMERGENCY EXIT LIGHTS INOPERATIVE. RELAMPED, EMERGENCY LIGHTS OPS CHECKED NORMAL.SDR UALA2012061103231Structure · damagedLIGHTNING STRIKE DAMAGE LOCATED AT FASTENER STRINGER 11R STA 157. REPAIRED PER SRM 53-00-01.SDR UALA2012061103230Structure · damagedLIGHTNING STRIKE DAMAGE AT FASTENER LOCATED AT STRINGER 11R STA 154. REPAIRED PER SRM 51-00-01.SDR UALA2012061103219Lamp · inoperativeEMERGENCY LIGHT INOPERATIVE AT R2 DOOR FORWARD. RELAMPED, OPS CHECKED NORMAL.SDR UALA2012061103218Lamp · inoperativeEMERGENCY LIGHT LOWER WALL BETWEEN L2 & R2 DOORS INOPERATIVE. RELAMPED, OPS NORMAL.SDR UALA2012061103217Lamp · inoperativeEMERGENCY LIGHT UPPER DECK CEILING ROW 15 INOPERATIVE. RELAMPED, OPS CHECKED NORMAL.SDR UALA2012061103222Lamp · inoperativeEMERGENCY CEILING LIGHT AT ROW 50. RELAMPED, OPS CHECKED NORMAL.SDR UALA2012061103221Lamp · inoperativeEMERGENCY LIGHT UPPER DECK CEILING AT ROW 13 INOPERATIVE. RELAMPED, OPS CHECKED NORMAL.SDR UALA2012061103220Connector · unsecureEMERGENCY LIGHT INOPERATIVE AT SEAT 51 ABC. SECURED CONNECTOR, OPS CHECKED NORMAL.SDR UALA2012060803173Light · inoperativeRT OVERWING EMERGENCY LIGHT SECOND FROM TOP ONE LIGHT INOPERATIVE. REPLACED LIGHT ASSY.SDR UALA2012060803174Lamp · inoperativeEMERGENCY EXIT R1 DOOR SIGN INOPERATIVE. REPLACED LAMP.SDR UALA2012060803172Battery · inoperativeEMERGENCY LIGHT ALONG LAV 101 RT INOP. SUPPLEMENTAL DATA UPDATE, REPLACED BATTERY AND POWER SUPPLY UNIT.SDR UALA2012060803171Battery · inoperativeEMERGENCY LIGHT ABOVE R1 DOOR INOPERATIVE. REPLACED BATTERY AND POWER SUPPLY ASSY.SDR UALA2012060803170Wire · damagedEMERGENCY LIGHT ROW 4 RT INOPERATIVE. REPAIRED WIRING.SDR UALA2012060803169Wire · damagedEMERGENCY SEAT LIGHT ROW 3 RT INOPERATIVE. REPAIRED WIRING.SDR UALA2012060803168Wire · damagedEMERGENCY LIGHT RT ROW 2 INOPERATIVE. REPAIRED EMERGENCY LIGHT WIRING.SDR UALA2012060803167Wire · damagedEMERGENCY LIGHT SEAT 1 RT INOPERATIVE. REPAIRED EMERGENCY LIGHT WIRING.SDR UALA2012060803166Lamp · inoperativeCEILING EMERGENCY LIGHT ROW 13 INOPERATIVE. RELAMPED. OPS CHECKED NORMAL.SDR UALA2012060803165Connector · unsecureEMERGENCY LIGHT ROW 43 LT SEAT INOPERATIVE. RESECURED EMERGENCY LIGHT CONNECTOR. OPS CHECKED NORMAL.SDR UALA2012060803164Lamp · inoperativeR2 DOOR EMERGENCY LIGHT INOPERATIVE. RELAMPED. OPS CHECKED NORMAL.SDR UALA2012060503109Floorbeam · crackedUPPER DECK FLOORBEAM AY AT BS 440 RBL 58 CRACKED AND CORRODED ON UPPER FLANGE. REMOVED DAMAGE, HFEC. FABRICATED AND INSTALLED REPAIR PARTS IAW UA-EVA-73840 AND UAL-744-0637.SDR UALA2012060503108Frame · crackedBS 1120 LT TENSION TIE DOUBLER CRACKED. REPLACED FRAME IAW SRM 51-40-02.SDR UALA2012060503107Tension Tie · crackedBS 1120 LT TENSION TIE FWD CHANNEL CRACKED. REPAIRED TENSION TIE IAW NR-53-033 AND NR-53-021.SDR UALA2012060503106Frame · crackedBS 1120 LT FRAME CRACK AT TENSION TIE. INSTALLED NEW FRAME IAW SRM 51-40-02.SDR UALA2012060503105Doubler · crackedSTA 1200 RT TENSION TIE DOUBLER CRACKED. INSTALLED NEW DOUBLER IAW SRM 51-40-02.SDR UALA2012060503104Tension Tie · crackedBS 1180 RT TENSION TIE DOUBLER CRACKED. INSTALLED NEW DOUBLER IAW SRM 51-40-02.SDR UALA2012060503103Frame · crackedBS 1200 RT FRAME CRACK AT TENSION TIE. INSTALLED NEW FRAME IAW SRM 51-40-02.SDR UALA2012060503102Tension Tie · crackedBS 1200 RT TENSION TIE FWD CHANNEL CRACKED. REPAIRED TENSION TIE IAW NR-53-032 AND NR-53-013.SDR UALA2012060503101Tension Tie · crackedBS 1180 RT TENSION TIE FWD CHANNEL CRACKED. REPAIRED TENSION TIE IAW NR-53-030 AND NR-53-015.SDR UALA2012060503100Tension Tie · crackedBS 1180 LT TENSION TIE FWD AND AFT CHANNEL CRACKED. REPAIRED TENSION TIE IAW NR-53-031 AND NR-53-016.SDR UALA2012060503099Tension Tie · crackedBS 1160 RT TENSION TIE FWD AND AFT CHANNEL CRACKED. REPAIRED TENSION TIE IAW NR-53-029 AND NR-53-017.SDR UALA2012060503098Frame · crackedBS 1140 RT FRAME CRACK AT TENSION TIE. INSTALLED NEW FRAME IAW SRM 51-40-02.SDR UALA2012060503097Frame · crackedBS 1220 RT FRAME CRACK AT TENSION TIE. INSTALLED NEW FRAME IAW SRM 51-40-02.SDR UALA2012060503096Tension Tie · crackedBS 1140 LT TENSION TIE FWD AND AFT CHANNEL CRACKED. REPAIRED TENSION TIE PER NR-53-037 AND NR-53-019.SDR UALA2012060503095Tension Tie · crackedBS 1120 RT TENSION TIE DOUBLER CRACKED. INSTALLED NEW DOUBLER IAW SRM 51-40-02.SDR UALA2012060503094Frame · crackedBS 1120 RT FRAME CRACKED AT TENSION TIE. INSTALLED NEW FRAME IAW SRM 51-40-02.SDR UALA2012060503093Failsafe · crackedBS 1140 RT TENSION TIE FAILSAFE CRACKED. REMOVED DAMAGE AND INSTALLED REPAIR IAW SRM 51-70-12.SDR UALA2012060503092Failsafe · crackedBS 1140 LT TENSION TIE FAIL SAFE CRACKED. REMOVED DAMAGE AND INSTALL REPAIR IAW SRM 51-70-12.SDR UALA2012060503091Failsafe · crackedBS 1120 RT TENSION TIE FAIL SAFE CRACKED. REMOVED DAMAGE AND INSTALLED REPAIR IAW SRM 51-70-11.SDR UALA2012060503090Tension Tie · crackedBS 1160 RT TENSION TIE DOUBLER CRACKED. INSTALLED NEW DOUBLER PER DRAWING 65B01751-10 AND SRM 51-40-02.
Back to Boeing 747-422