Douglas DC9-15

Service difficulty reports · 926

Newest first. General aviation reporting is voluntary.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE aircraft_model_key = 'DC915'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR MWEA00269Skin · dentedRIGHT AILERON HAS A DENT ON LOWER SURFACE, 4 INCHES FROM OUTBOARD END. FABRICATED AND INSTALLED REPAIR DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · AileronsSDR MWEA00268Floor Support · corrodedCABIN SUB FLOOR HAS SEVERAL AREAS OF LIGHT CORROSION BETWEEN STATION 408 - 427 ADJACENT TO LONGERON 18 RIGHT. FABRICATED AND INSTALLED REPAIRS.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Miscellaneous StructureSDR MWEA00267Floor Support · crackedCABIN SUB FLOOR HAS A CRACK UNDER SEAT TRACK NR 4 AT STATION 256. FABRICATED AND INSTALLED REPAIR DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Miscellaneous StructureSDR MWEA00266Longeron · misdrilledLONGERON 16 AND 17 HAVE A MISDRILLED HOLE AT STATION 737. FABRICATED AND INSTALLED NEW LONGERON.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, StructureSDR MWEA00265Finger Doubler · crackedFINGER DOUBLER SPLICE IS REMOVED FROM LEFT HAND ELEVATOR LOWER INBOARD SKIN TO FOM. FABRICATED AND INSTALLED NEW DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · Elevator StructureSDR MWEA00264Intercostal · chafedFORWARD CARGO DOOR AFT INTERCOSTAL BY DOOR HINGE IS CHAFED ON AFT SIDE. FABRICATED AND INSTALLED NEW INTERCOSTAL.Apr 3, 2000 · N900ME · Doug DC915 · Cargo/Baggage DoorsSDR MWEA00263Intercostal · misdrilledFORWARD CARGO DOOR INTERCOSTAL FORWARD OF AFT HINGE HAS DOUBLE DRILLED HOLES AT UPPER END. FABRICATED AND INSTALLED NEW INTERCOSTAL.Apr 3, 2000 · N900ME · Doug DC915 · Cargo/Baggage DoorsSDR MWEA00261Angle · damagedFOUND ELONGATED FASTENER HOLES ON NUMBER 21 RIB SUPPORT ANGLE ON LEADING EDGE OF RUDDER. MAINTENANCE INSTALLED REPAIR TEE.Apr 3, 2000 · N900ME · Doug DC915 · Rudder StructureSDR MWEA00260Intercostal · dentedFLOORBEAM INTERCOSTAL AT STATION 375 AND FUSELAGE CENTERLINE IS DENTED AND CHAFED. MAINTENANCE FABRICATED AND INSTALLED INTERCOSTAL.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Miscellaneous StructureSDR MWEA00259Intercostal · damagedFOUND ELONGATED HOLES IN AFT CARGO DOOR INTERCOSTAL WEB. MAINTENANCE FABRICATED AND INSTALLED INTERCOSTAL.Apr 3, 2000 · N900ME · Doug DC915 · Cargo/Baggage DoorsSDR MWEA00258Pan · chafedAFT CARGO DOOR INNER PAN IS CHAFED AT SCREW HOLES WHERE SEAL ATTACH. FABRICATED AND INSTALLED REPAIR STRAPS AND NEW INNER PAN.Apr 3, 2000 · N900ME · Doug DC915 · Cargo/Baggage DoorsSDR MWEA00257Pan · chafedAFT CARGO DOOR INNER AND OUTER PANS HAVE NUMEROUS CHAFES ALONG BOTTOM EDGE. FABRICATED AND INSTALLED ANGLES.Apr 3, 2000 · N900ME · Doug DC915 · Cargo/Baggage DoorsSDR MWEA00256Skin · gougedVERTICAL SKIN IS GOUGED FROM RIGHT LOWER HORIZONTAL TO VERTICAL FAIRING. FABRICATED AND INSTALLED NEW SKIN PANEL.Apr 3, 2000 · N900ME · Doug DC915 · Vertical StabilizerSDR MWEA00255Support Bracket · dentedAFT CARGO RIGHT HAND SUPPORT STRUT AT STATION 680 IS DENTED. FABRICATED AND INSTALLED NEW STRUT SUPPORT.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Miscellaneous StructureSDR MWEA00254Skin · scratchedAFT CARGO DOOR OUTER SKIN HAS NUMEROUS SCRATCHES ACROSS BEAM 3 INCHES FROM FWD TO AFT SIDE. FABRICATED AND INSTALLED NEW SKIN PANEL.Apr 3, 2000 · N900ME · Doug DC915 · Cargo/Baggage DoorsSDR MWEA00253Skin · disengagedOUT OF ROUND HOLE AT STATION XRS 214 AND 184 LEFT WING FORWARD LOWER SKIN. FABRICATED AND INSTALLED PLUG.Apr 3, 2000 · N900ME · Doug DC915 · Wing, Plate/SkinSDR MWEA00252Web · crackedAFT VENTRAL DOOR JAMB WEB IS CRACKED ON RIGHT SIDE APPROX 1 FOOT BELOW UPPER CORNER. FABRICATED AND INSTALLED NEW DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · Emergency ExitsSDR MWEA00251Spar · misdrilledDOUBLE DRILLED HOLE AT STATION XRS 189 LEFT WING FORWARD UPPER SPAR. FABRICATED AND INSTALLED PLUG.Apr 3, 2000 · N900ME · Doug DC915 · Wing SparSDR MWEA00246Floorboard · puncturedCAPTAIN FLOORBOARD AROUND YOLK IS PUNCTURED AT INBOARD AFT CORNER. FABRICATED AND INSTALLED NEW DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00245Floorboard · dentedCOCKPIT FLOORBOARD BEHIND CENTER PEDESTAL IS DENTED. FABRICATED AND INSTALLED NEW DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00250Skin · dentedLEFT HAND ELEVATOR BOTTOM SKIN HAS SEVERAL DENTS AT STATION XHS 60. FABRICATED AND INSTALLED NEW SKIN.Apr 3, 2000 · N900ME · Doug DC915 · Elevator, Plate/SkinSDR MWEA00249Floor Support · corrodedREMOVED GALLEY DRAIN PAN TO FOM AND FOUND GALLEY SUB FLOOR OUT OF LIMITS. FABRICATED AND INSTALLED REPAIR DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Miscellaneous StructureSDR MWEA00248Floorboard · gougedGOUGES AROUND FLOORBOARD FASTENER HOLES TOP OF NR 2 SEAT TRACK FROM STATION 718 TO 786. FABRICATED AND INSTALLED REPAIRED TRACK.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00247Bulkhead · gougedSTATION 786 BULKHEAD HAS SEVERAL GOUGES IN AFT SIDE OF WEB BETWEEN LONGERON 8-9 LEFT. FABRICATED AND INSTALLED DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, BulkheadSDR MWEA00244Panel · bulgedRIGHT WING PANEL HAS A BULGE. FABRICATED AND INSTALLED NEW PANEL.Apr 3, 2000 · N900ME · Doug DC915 · Wing, Plate/SkinSDR MWEA00243Longeron · crackedLONGERON 2 LEFT IS CRACKED AT STATION 623. FABRICATED AND INSTALLED REPAIR PARTS.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, Longeron/StringerSDR MWEA00242Skin · dentedDENT ON EXTERIOR FUSELAGE SKIN AT STATION 266, JUST BELOW LONGERON 19 LEFT. FABRICATED AND INSTALLED DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, Plate/SkinSDR MWEA00241Skin · dentedFUSE SKIN DENT AT STATION 233 BELOW LONGERON 16 RIGHT IS A CLASS 1B. FABRICATED AND INSTALLED REPAIR DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, Plate/SkinSDR MWEA00240Skin · dentedEXTERIOR SKIN DENTS AT STATION 235 & 247 BETWEEN LONGERON 17 & 18 LEFT. FABRICATED AND INSTALLED REPAIR DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, Plate/SkinSDR MWEA00239Skin · dentedEXTERIOR SKIN DENTED AT STATION 231 AT LONGERONS 18 AND 19 LEFT. FABRICATED AND INSTALLED DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, Plate/SkinSDR MWEA00238Skin · gougedGOUGE ON EXTERIOR SKIN LEFT HAND SIDE AT STATION 216, LONGERON 18 LEFT. FABRICATED AND INSTALLED REPAIR DOUBLER.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, Plate/SkinSDR MWEA00237Floor Support · corrodedSUB FLOOR HAS SEVERAL SPOTS OF LIGHT CORROSION BETWEEN CENTER OF A/C TO FLOOR SUPPORT FORWARD OF NR 1 SEAT TRACK BETWEEN STATION 160 - 200. FABRICATED AND INSTALLED NEW SUBFLOOR.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Miscellaneous StructureSDR MWEA00236Skin · crackedSUB SURFACE CRACK INDICATION ON EXTERNAL SKIN LOWER FORWARD CORNER OF FORWARD CARGO COMPARTMENT OPENING. FABRICATED AND INSTALLED DOUBLER AND FILLERS.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, Plate/SkinSDR MWEA00235Longeron · chafedLONGERON 8 LEFT IS CHAFED AT STATION 709. FABRICATED AND INSTALLED REPAIR LONGERON AND SPLICE.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, Longeron/StringerSDR MWEA00234Frame · gougedFRAME 737 IS GOUGED AT LONGERON 17 LEFT. FABRICATED AND INSTALLED ANGLE.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, FrameSDR MWEA00233Skin · gougedFUSELAGE SKIN EXTERIOR HAS A GOUGE AT STATION 101 BELOW ELECTRICAL POWER PLUG OPENING. FABRICATED AND INSTALLED DOUBLER AND FILLER.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, Plate/SkinSDR MWEA00232Floorbeam · chafedCABIN FLOORBEAM HAS CHAFES AT STATION 484 INBOARD OF LEFT HAND INBOARD SEAT TRACK. FABRICATED AND INSTALLED REPAIR ANGLE AND WEAR STRIPS.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, Floor BeamSDR MWEA00231Skin · damagedTHE INTERNAL SURFACE OF FUSELAGE SKIN HAS DRILL MARKS AT STATION 699 UNDER LONGERON 3R AND 6R. FABRICATED AND INSTALLED FINGER DOUBLER AND FILLER.Apr 3, 2000 · N900ME · Doug DC915 · Fuselage Main, Plate/SkinSDR MWEA00230Longeron · chafedLONGERON 17, 16, AND 15 RIGHT ARE CHAFED BEYOND LIMITS AT STATION 661 PER SRM 53-01. FABRICATED AND INSTALLED NEW LONGERONS.Mar 31, 2000 · N900ME · Doug DC915 · Fuselage Main, Longeron/StringerSDR MWEA00229Floorboard · dentedCABIN FLOORPANEL B-6 HAS A DENT AND NUMEROUS CRACKS ON SKIN AND SUPPORT CHANNELS. FABRICATED AND INSTALLED NEW PANEL.Mar 31, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00228Floorboard · puncturedCABIN FLOOR PANEL E-8 IS PUNCTURED AND HAS SEVERAL CRACKS. FABRICATED AND INSTALLED NEW FLOORBOARD PANEL.Mar 31, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00227Floorboard · chafedCABIN FLOOR PANEL E-8 HAS CHAFED AREA AND IS MISSING CHAFE. FABRICATED AND INSTALLED NEW FLOOR PANEL.Mar 31, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00226Floorboard · crackedCABIN FLOOR PANEL A-5 HAS CRACKS AND DAMAGED FIBERGLASS SUPPORT CHANNEL. FABRICATED AND INSTALLED DOUBLER.Mar 31, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00225Floorboard · damagedCABIN FLOOR PANEL F-7 HAS DAMAGED FIBERGLASS SUPPORT CHANNELS AND SUPPORT CHANNEL ATTACH RIVETS HAVE INSUFFICIENT EDGE DISTANCE. FABRICATED AND INSTALLED FIBERGLASS SUPPORT CHANNELS.Mar 31, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00224Floorboard · corrodedCABIN FLOORPANEL F-1 HAS AREAS OF BAREMETAL, WIDESPREAD LIGHT TO MODERATE CORROSION, AND DAMAGED FIBERGLASS SUPPORT CHANNEL. FABRICATED AND INSTALLED FLOORBOARD.Mar 31, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00223Floorboard · misdrilledCABIN FLOOR PANEL B-9 HAS AREAS OF BAREMETAL, HOLES WITH INSUFFICIENT EDGE DISTANCE, AND MISSING CHAFE STRIP. FABRICATED AND INSTALLED REPAIR DOUBLER.Mar 31, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00222Floorboard · crackedCABIN FLOOR PANEL B-2 HAS AREAS OF BAREMETAL, AND A SECTION CRACKED OUT FROM ATTACHMENT HOLE. FABRICATED AND INSTALLED DOUBLER.Mar 31, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00221Floorboard · chafedCABIN FLOOR PANEL A-3 HAS AREAS OF BAREMETAL AND A CHAFED AREA. FABRICATED AND INSTALLED DOUBLER.Mar 31, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00220Floorboard · chafedCABIN FLOOR PANEL A-2 HAS CHAFED AREAS AND CRACKS. FABRICATED AND INSTALLED DOUBLER.Mar 31, 2000 · N900ME · Doug DC915 · Fuselage Floor PanelSDR MWEA00219Floorboard · crackedCABIN FLOOR PANEL F-5 HAS CRACKS, PUNCTURES, AND DAMAGED FIBERGLASS SUPPORT CHANNELS. FABRICATED AND INSTALLED DOUBLERS.Mar 31, 2000 · N900ME · Doug DC915 · Fuselage Floor Panel
Back to Douglas DC9-15