Search results

Sort
Best match

In the text of ADs · 175

AD 2024-01-07Request To Extend Compliance TimeAerologic, All Nippon Airways, China Airlines, FedEx, Swiss Air, Turkish Airlines, and United Airlines expressed concern that long lead times…PDF page 2AD 2018-13-02Request To Clarify Compliance TimeUnited Parcel Service, United Airlines, SR Technics, Delta Airlines (DAL), Atlas Air, Federal Express (FedEx), and the Boeing Company requested…PDF page 1AD 2024-10-05Request To Require Repetitive Inspection Instead of ModificationA4A, FedEx Express, and UPS Airlines requested that a repetitive inspection program be implemented for cargo/freighter airplanes instead of…PDF page 2AD 2018-20-06HistoricalRequest To Incorporate Revised Service BulletinsFedEx Express requested that we revise the proposed AD to incorporate Airbus Service Bulletin A300-52-6085, Revision 01, dated…PDF page 2AD 2017-11-06HistoricalRequest for New AD Instead of Supersedure ADPW, Delta Airlines (Delta), FedEx Express (FedEx), and United Airlines (United) requested that the NPRM to supersede AD 2014-05…PDF page 1AD 2013-19-18HistoricalRequest To Delay Implementation of Reduced Rotating Parts Life LimitsAmerican Airlines (AAL), FedEx Express, and RR asked that we revise or remove paragraph (e)(2) of this AD to…PDF page 2AD 2017-19-10Requests To Revise ApplicabilityBoeing, Delta Air Lines (DAL), European Air Transport Leipzig GmbH (EAT), DHL Express (DHL), FedEx Express (FedEx), and United Airlines…PDF page 1AD 2009-08-06Claim That Cost of Compliance Is UnderestimatedOne commenter, FedEx Express, claims that we greatly underestimated the actual cost of compliance with the proposed AD. The proposed…PDF page 1AD 2023-03-04Request To Add Credit for Previous Actions…FedEx stated that they are already doing the applicable added tasks from the SB 777-57A0050, Revision 6, which has…PDF page 3AD 2018-06-08Request To Provide Instructions for Previously Repaired AreasFedEx Express asked that instructions to address previously repaired areas on which the modification has not been incorporated be added…PDF page 1AD 2009-21-07Extend the Compliance Time to Next C-CheckOnur Air, FedEx Express, and Lufthansa Technik suggest that the initial compliance time be extended from within 500 flight cycles…PDF page 2AD 2010-16-03Requests To Revise the Costs of Compliance Section of the NPRM…Federal Express (FedEx) believes that the total cost of the NPRM has either not been fully considered, or has not…PDF page 3AD 2020-01-15Request To Change Compliance Time…In addition, Airbus and FedEx both expressed concerns about the feasibility of the modification due to the potential effects of…PDF page 5AD 2009-21-07Request To Re-Examine the Cost of ComplianceFedEx Express, GE, and MRAS request that the FAA re-examine the criteria and considerations used to estimate the cost…PDF page 2AD 2024-10-05Request To Exclude Cargo/Freighter Airplanes From the NPRMA4A, FedEx Express, and UPS Airlines requested that cargo/freighter airplanes be excluded from the applicability of the NPRM. The…PDF page 2AD 2024-05-09Request for Alternative Required Actions for Certain AirplanesVT MAE and FedEx Express requested the use of Group 4 inspections/methods/compliance times, given in Boeing Alert Requirements…PDF page 2AD 2016-11-03Requests To Incorporate New Service Information and Provide CreditBoeing, All Nippon Airways (ANA), Delta Airlines (DAL), Emirates Airline, FedEx Express, and United Airlines (UAL) requested that we revise…PDF page 3AD 2009-21-07Hardware Not Presently InstalledFedEx Express requests that proposed AD paragraph (h) be clarified with regards to addressing what actions, if any, should be…PDF page 3AD 2009-21-12Requests To Withdraw NPRM…FedEx Express also asks that the NPRM be withdrawn and provides the following reasons: • FedEx states that the life limit…PDF page 2AD 2024-24-03Request To Add an Instruction for a Condition With Multiple Options…The commenter expressed a concern that if this is not directly addressed in the language of the AD, it is…PDF page 4