Search results
Sort
In the text of advisory circulars · 5
AC 120-100Basics of Aviation Fatigue…and continuously manage fatigue risk through a process
requiring shared responsibility among management and flight and cabin crewmembers. Since
feedback…AC 25-22Certification of Transport Airplane Mechanical Systems…It was developed in response to inquiries regarding
certification of cabin ozone limits to satisfy § 25.832:
(a) The cabin…AC 25.981-2AFuel Tank Flammability…If this
is not a practical solution, installation of an FRM using thermal control may be another
option. Possible technical…AC 120-35CHistoricalLine Operational Simulations: Line Oriented Flight Training, Special Purpose Operational Training, Line Operational Evaluation…to manage the training situation to maximize learning.
This does not include scenario interruptions to “teach” right solutions, or to…AC 25.981-2HistoricalFuel Tank Flammability Minimization…The following are examples of design
solutions that may be proposed:
(a) Managing Heat Transfer to the Fuel Tank.
1…