Search results
Sort
In the text of ADs · 120
AD 2002-16-20(d) Actions Addressing the Main Deck Cargo Door Systems…the effective date of this AD, incorporate redesigned main deck cargo door systems ( e.g., warning/monitoring, power control, view…AD 2002-16-22(d) Actions Addressing the Main Deck Cargo Door Systems…the effective date of this AD, incorporate redesigned main deck cargo door systems ( e.g., warning/monitoring, power control, view…AD 2002-16-21(d) Actions Addressing the Main Deck Cargo Door Systems…the effective date of this AD, incorporate redesigned main deck cargo door systems (e.g., power control, view ports, and…AD 2002-16-19(d) Actions Addressing the Main Deck Cargo Door Systems…the effective date of this AD, incorporate redesigned main deck cargo door systems ( e.g., warning/monitoring, power control, view…AD 2026-22-01Material Incorporated by Reference Under 1 CFR Part 51…the dropping control of the mechanical emergency release system of the cargo swing installation. Depending on the results of the…AD 2023-04-12HistoricalSummary…cargo compartments had migrated from its original position, which could affect the fire extinguishing system efficiency in the cargo compartments…AD 2018-03-21(e) Reason…system for the lower deck cargo compartment. Such a condition could result in an uncontrolled fire in the cargo compartment.AD 2001-26-03Cost Impact…cargo door hinge | 60 | $200 | $22,800, or $3,800 per airplane. |
| Inspection and evaluation of the cargo handling system…AD 93-07-15Cargo Compartment…information.
(3) Incorporate the following systems and equipment:
(i) Provide appropriate protective garmentsstored adjacent to the cargo compartment entrance.
(ii…AD 2001-26-01Cost Impact…the cargo handling system | 16 | N/A | $10,560, or $960 per airplane. |
| SA1377SO | Modification of main deck cargo floor…AD 2002-16-22Regulatory Evaluation Summary…These procedures are expected to include an inspection (until the incorporation of the redesigned main deck cargo door systems), described…AD 89-17-01 R1Main Cargo Door…If the main cargo door-open indicating system functional check is not successfully accomplished, repair the main cargo door-open…AD 2002-16-20Regulatory Evaluation Summary…These procedures are expected to include an inspection (until the incorporation of the redesigned main deck cargo door systems), described…AD 2002-16-19Regulatory Evaluation Summary…The total cost to comply with the requirements for incorporating redesigned main deck cargo door systems is $25.1 million…AD 2001-26-04Cost Impact…the cargo handling system | 16 | N/A | $27,840, or $960 per airplane. |
| Modification of main deck cargo floor | 40…AD 2001-26-02Cost Impact…the cargo handling system | 16 | N/A | $3,840, or $960 per airplane. |
| ST00309AT | Modification of main deck cargo floor…AD 90-21-19Main Deck Cargo Door Inspection…This deactivates the cargo door warning annunciator system.
C. Within 10 days after the effective date of this AD, and…AD 2002-16-21Regulatory Evaluation Summary…The FAA assumes that operators will incorporate redesigned main deck cargo door systems during regularly scheduled maintenance. (Kitty Hawk indicated…AD 75-23-09Nose Cargo Door Latch System…for the modification of the nose cargo door latch and lock system. Incorporation of this FAA approved modification will constitute…AD 2025-07-05Material Incorporated by Reference Under 1 CFR Part 51…EASA AD 2024-0129 also specifies procedures for checking the condition and integrity of the temporary protection system (TPS) layer…