Copy · SB-737-28A1216-01--BOEING · 434 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-1068; AD 2016-18-16 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '3ecbcd34be3a489ca56db8bb3e250023b8ea031c7898873b9460b03e9b948430'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Show pages 13–24

GroupVariable Number 23PS811 23PS836 - PS837 22PS841 - PS846 22PS851 - PS852 22PS856 17PS861 - PS863 17PS866 - PS868 22PS871 - PS874 22PS896 - PS897 15PS901 - PS941 17PS956 - PS957 23PS961 - PS963 23PS971 - PS978 3PT001 - PT015 3PT021 - PT031 23PT041 - PT064 3PT101 - PT105 23PT121 - PT138 23PT146 - PT148 23PT161 - PT170 31PT181 - PT185 9PT186 - PT188 23PT211 - PT220 23PT295 3PT301 - PT309 10PT331 - PT360 3PT381 - PT399 3PT401 - PT438 27PT501 - PT517 3PT561 - PT565 3PT581 - PT586 10PT611 - PT621 3PT641 - PT644

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 25 of 434 BOEING SERVICE BULLETIN 737-28A1216

ALERTALERT

GroupVariable Number 3PT651 - PT656 27PT671 - PT672 3PT681 - PT685 13PT701 - PT703 3PT716 - PT717 23PT721 - PT725 10PT801 - PT834 3PT851 - PT854 23PT871 - PT886 10PT901 - PT930 10PT971 - PT973 3PT981 - PT985 23PT996 10PU001 - PU025 23PU301 23PU311 - PU313 4PV001 5PV002 - PV055 1PV201 - PV209 1PV226 - PV229 8PV231 - PV237 1PV271 - PV272 1PV281 - PV287 21PV296 21PV301 - PV302 1PV351 31PV356 - PV357 21PW001 - PW054 21PW061 1PW062 - PW068 21PW072 21PW086 - PW088 21PW091 - PW094

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 26 of 434 BOEING SERVICE BULLETIN 737-28A1216

ALERTALERT

GroupVariable Number 21PW101 - PW102 21PW106 21PW111 - PW120 21PW156 - PW157 21PW161 - PW171 1PW201 - PW252 21PW261 - PW268 21PW271 - PW276 21PW278 21PW281 - PW293 21PW296 26PW301 - PW327 1PW401 - PW408 1PW411 - PW418 1PW421 - PW424 1PW431 - PW435 8PW441 - PW450 1PW461 - PW467 21PW501 - PW504 19PW511 - PW522 19PW524 1PW525 - PW529 19PW530 5PW531 - PW550 24PW556 - PW557 1PW561 - PW564 1PW571 - PW576 21PW591 - PW596 5PW611 - PW622 5PW631 - PW637 24PW661 - PW662 5PW681 - PW683 30PW701 - PW702

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 27 of 434 BOEING SERVICE BULLETIN 737-28A1216

ALERTALERT

GroupVariable Number 1PW711 - PW717 24PW741 - PW742 5PW761 1PW771 31PW831 31PW851 - PW856

2. Spares Affected None.

B. Concurrent Requirements The service bulletin(s) listed below must be done before or at the same time as this service bulletin:

DescriptionService BulletinCompany Gives instruction to install a new printed circuit assembly in the P5-2 fuel system module assembly to supply Low fuel pressure master caution Annunciation.

BAE Systems SB 69-37335-28-04, Revision 2, dated Feb 10/2010 BAE Gives instruction to replace the P5-2 fuel system module assembly to supply Low fuel pressure master caution Annunciation.

737-28A1210, Revision 1Boeing C. Reason This service bulletin is the result of the safety analysis done by Boeing under SFAR 88, "Fuel Tank System Fault Tolerance Evaluation Requirements." Initial results from the fuel system safety analysis shows that fuel boost pumps that run dry could cause an overheat condition external of the fuel pump explosion resistance area that is open to the fuel pump inlet. An overheat condition in this area could possibly cause an unwanted ignition source for the fuel vapors in the fuel tank and could cause a fire or explosion.

This service bulletin gives the instructions and a kit of parts to install an automatic (auto) shut-off system for the fuel boost pumps. The fuel boost pumps are installed in the center fuel tank and if equipped, also in the auxiliary fuel tank. Time delay relays are installed in the new J2802 box assembly that will shut off the fuel boost pumps if the pumps operate with continuous low pressure for 15 seconds. The 15 second time delay relay prevents extended dry operation of the fuel boost pumps and allows for sufficient time for fuel pump inlet reprime to prevent nuisance automatic shutoffs. The flight crew stays in primary control, with the auto shut off system as a backup, to stop the fuel boost pumps after a low pressure indication.

The change installs an automatic shut off system that gives fuel boost pump inlet protection in the fuel tank against sparks possibly caused by friction overheat damage.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 28 of 434 BOEING SERVICE BULLETIN 737-28A1216

ALERTALERT

This change affects the Fuel Systems Airworthiness Limitations section of Boeing document "737-100/200/200C/300/400/500 Airworthiness Limitations (AWLs) and Certification Maintenance Requirements (CMRs), D6-38278-CMR." New AWL "28-AWL-20" will be added to include an operational check of the boost pump automatic shutoff system for the center fuel tank. AWL "28-AWL-21" will be added to include an operational check of the fuel boost pump automatic shutoff system for the auxiliary fuel tank, if installed by Boeing. This change also affects Section 1 and Section 3 of the FAA Approved Airplane Flight Manual (AFM).

Other related airplane service bulletins are Service Bulletin 737-28A1228 for the 737-100/200 airplanes and Service Bulletin 737-28A1206 for the 737-600/700/800/900 airplanes.

Revision 1:

This revision is sent to tell the operators that for airplanes with Airstairs the J2802 Box provided in the original release can not be installed in the main equipment compartment on the E2 and E3 support posts in accordance with Figure 12 or Figure 13. When J2802 Box is installed in accordance with Figure 12 or 13, the forward face of the box interferes with the Airstairs and the Airstairs support structure.

Also there is no good access to the Airstairs relays, and to the wires connected to the Airstairs relays.

A new J2802 Box Assembly was designed and added to this revision that can be installed on airplanes with Airstairs with no interference with Airstairs and the Airstairs support structure. The airplanes with Airstairs were moved from the existing groups into new groups based on the wires configuration and Auxiliary Tank installation. Figures 92 through 107 were added for airplanes with Airstairs.

This revision is also sent to tell the Operators that the switches S03318 and S03321 installed on J2802 box have two positions (for each switch) identified as "POS 1" and "POS 2". POS 1 of the test switch S03318 is for Left Fuel Boost Pump of the Center Tank. POS 1 of the test switch S03321 is for Right Fuel Boost Pump of the Center Tank. POS 2 of the test switches S03318 and S03321 are only used for airplanes with Auxiliary Tanks. POS 2 of the test switch S03318 is for Aft Fuel Boost Pump of the Auxiliary Tank. POS 2 of the test switch S03321 is for Fwd Fuel Boost Pump of the Auxiliary Tank. The wires terminated at switches S03318 and S03321 were incorrectly terminated in Figures 4, 5, 7, 8, 9,

10. The wire terminations at switches S03318 and S03321 are changed in order for the switches to function as indicated.

New steps are added to Figure 3 that instruct the operators to install markers on the J2802 Box that will identify S03318 and S003321 as "TEST SWITCHES". Also instructions are added to install markers that will identify the function of the switch S03318 POS 1 as "CTR-L", and the function of the switch S03321 POS 1 as "CTR-R".

New steps are added to Figure 6 that instruct the operators to install markers on the J2802 Box that will identify S03318 and S003321 as "TEST SWITCHES". Also instructions are added to install markers that will identify the functions of the switch S03318 as follows: POS 1 as "CTR-L",and POS 2 as "AUX-AFT". Also instructions are added to install markers that will identify the functions of the switch S03321 as follows: POS 1 as "CTR-R", and POS 2 as "AUX-FWD".

Also this revision moves airplanes with airstairs from existing groups in new groups, Group 21 through

31. All airplanes in Groups 14, 17, and 18 have airstairs.

Some wires W368-031-20 delivered in the kits have been identified incorrectly. The wire I.D. Tapes Part Number 61-74478-10906 installed on both ends of the wire W368-031-20 may be imprinted incorrectly as "W036-031-20". Instructions are added to Figure 83 and Figure 84 to check the imprinted text on the wire I.D Tapes before installation and correct the text from "W036-031-20" to "W0368-031-20" if necessary.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 29 of 434 BOEING SERVICE BULLETIN 737-28A1216

ALERTALERT

The data given in Information Notice 737-28A1216 IN 01, 737-28A1216 IN 02, and 737-28A1216 IN 03 are included in this revision.

D. Description The work instructions are divided into 31 airplane groups and 6 parts.

PART 1, PART 2, PART 3, PART 4, and PART 5 work instructions are divided into 3 work packages because of the different wire bundle changes and airplanes without and with Airstairs.

PART 6 work instructions are for Operators that already ordered the kit from the original release, and want to re-work the kit for airplanes with Airstairs.

NOTE: When submitting a Publication Change Request (PCR) to Boeing to incorporate this service bulletin in the affected manuals, please notify Boeing if Auxiliary Tanks are installed on these airplanes. If Boeing is not notified about the Auxiliary Tanks, Boeing will assume that the airplanes in these groups do not have Auxiliary (AUX) tanks and no AUX Tank changes to the affected manuals will be done.

Group 1-13, 15-16:

PART 1 - AIRPLANES WITH CENTER FUEL TANKS AND WITHOUT AUXILIARY (AUX) FUEL TANKS

1. Work Package 1:

In the J2802 box assembly, install the wire bundles W1760 and W1770.

2. Work Package 2:

Get access into the main electronics compartment. Between the E2 and E3 rack support posts, install the J2802 box assembly.

3. Work Package 3:

In the flight compartment, get access to the P5 overhead panel, P6 relay panel or P6 relay modules.

Above the P5 overhead panel, make a change to the wire bundles W36, W368 and W386. Between the P6 disconnect panel and the fuel boost pump relays R54 and R55, make a change to the wire bundle W44.

In the flight and main electronics compartments, between the P6 disconnect panel and the J2802 box assembly, install the new wire bundles W1764 and W1774.

In the main electronics compartment, at the J2802 box assembly, install the time delay relays R3318 and R3321.

Do a functional test of the fuel boost pumps to make sure the changed control system operates correctly.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 30 of 434 BOEING SERVICE BULLETIN 737-28A1216

ALERTALERT

Group 17-18:

PART 2 - AIRPLANES WITH CENTER TANKS AND WIRE PROVISION FOR AUXILIARY (AUX)

FUEL TANKS, AND AIRSTAIRS

1. Work Package 1:

In the J2802 box assembly, install the wire bundles W1760 and W1770.

2. Work Package 2:

Get access into the main electronics compartment. Between the E2 and E3 rack support posts, install the J2802 box assembly.

3. Work Package 3:

NOTE: Airplanes in group 17 and 18 have been delivered with provisional wires for future Auxiliary Tank installation. Operators that installed AUX tanks with Fuel Boost Pumps on these airplanes need to install an Auto Shutoff system. FAA may release an AD to require that all airplanes that have AUX tanks with Fuel Boost Pumps should install an Auto Shutoff system.

In the flight compartment, get access to the P5 overhead panel, P6 relay panel or P6 relay modules.

Above the P5 overhead panel, make a change to the wire bundles W36, W368 and W386. Between the P6 disconnect panel and the fuel boost pump relays R54 and R55, make a change to the wire bundle W44. For the airplanes that have an auxiliary fuel tank, between the P6 disconnect panel and the fuel boost pump relays R146 and R147, make a change to the wire bundle W44.

In the flight and main electronics compartments, between the P6 disconnect panel and the J2802 box assembly, install the new wire bundles W1764 and W1774.

In the main electronics compartment, at the J2802 box assembly, install the time delay relays R3318 and R3321. For the airplanes that have auxiliary fuel tank, at the J2802 box assembly, install the time delay relays R3327 and R3329.

Do a functional test of the fuel boost pumps to make sure the changed control system operates correctly.

Group 19-20:

PART 3 - AIRPLANES WITH CENTER AND AUXILIARY (AUX) FUEL TANKS

1. Work Package 1:

In the J2802 box assembly, install the wire bundles W1760 and W1770.

2. Work Package 2:

Get access into the main electronics compartment. Between the E2 and E3 rack support posts, install the J2802 box assembly.

3. Work Package 3:

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 31 of 434 BOEING SERVICE BULLETIN 737-28A1216

ALERTALERT

In the flight compartment, get access to the P5 overhead panel, P6 relay panel or P6 relay modules.

Above the P5 overhead panel, make a change to the wire bundles W36, W368 and W386. Between the P6 disconnect panel and the fuel boost pump relays R54 and R55, make a change to the wire bundle W44. Between the P6 disconnect panel and the fuel boost pump relays R146 and R147, make a change to the wire bundle W44.

In the flight and main electronics compartments, between the P6 disconnect panel and the J2802 box assembly, install the new wire bundles W1764 and W1774.

In the main electronics compartment, at the J2802 box assembly, install the time delay relays R3318 and R3321. At the J2802 box assembly, install the time delay relays R3327 and R3329.

Do a functional test of the fuel boost pumps to make sure the changed control system operates correctly.

Group 14, 21-29, 31:

PART 4 - AIRPLANES WITH CENTER FUEL TANKS AND WITHOUT AUXILIARY (AUX) FUEL

TANKS, AND AIRSTAIRS

1. Work Package 1:

Change J2802 Box Assy if/as necessary.

In the J2802 box assembly, install the wire bundles W1760 and W1770.

2. Work Package 2:

Get access into the main electronics compartment. Between the E2 and E3 rack support posts, install the J2802 box assembly.

3. Work Package 3:

In the flight compartment, get access to the P5 overhead panel, P6 relay panel or P6 relay modules.

Above the P5 overhead panel, make a change to the wire bundles W36, W368 and W386. Between the P6 disconnect panel and the fuel boost pump relays R54 and R55, make a change to the wire bundle W44.

In the flight and main electronics compartments, between the P6 disconnect panel and the J2802 box assembly, install the new wire bundles W1764 and W1774.

In the main electronics compartment, at the J2802 box assembly, install the time delay relays R3318 and R3321.

Do a functional test of the fuel boost pumps to make sure the changed control system operates correctly.

Group 30:

PART 5 - AIRPLANES WITH CENTER AND AUXILIARY (AUX) FUEL TANKS, AND AIRSTAIRS

1. Work Package 1:

Change J2802 Box Assy if/as necessary.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 32 of 434 BOEING SERVICE BULLETIN 737-28A1216

ALERTALERT

In the J2802 box assembly, install the wire bundles W1760 and W1770.

2. Work Package 2:

Get access into the main electronics compartment. Between the E2 and E3 rack support posts, install the J2802 box assembly.

3. Work Package 3:

In the flight compartment, get access to the P5 overhead panel, P6 relay panel or P6 relay modules.

Above the P5 overhead panel, make a change to the wire bundles W36, W368 and W386. Between the P6 disconnect panel and the fuel boost pump relays R54 and R55, make a change to the wire bundle W44. Between the P6 disconnect panel and the fuel boost pump relays R146 and R147, make a change to the wire bundle W44.

In the flight and main electronics compartments, between the P6 disconnect panel and the J2802 box assembly, install the new wire bundles W1764 and W1774.

In the main electronics compartment, at the J2802 box assembly, install the time delay relays R3318 and R3321. At the J2802 box assembly, install the time delay relays R3327 and R3329.

Do a functional test of the fuel boost pumps to make sure the changed control system operates correctly.``````` Group 14, 17-18, 21-31:

PART 6 - AIRPLANES WITH CENTER AND AUXILIARY (AUX) FUEL TANKS, AND AIRSTAIRS

1. Change J2802 Box Assy for airplanes with Airstairs.

NOTE: Operators that have airplanes with Airstairs that ordered and received the Top Kits given in the original release of this service bulletin can use the J2802 Box assembly received in the kit but they need to change the J2802 Box for airplanes with airstairs.

Revision 1: More work is necessary on the airplane(s) changed in accordance with the original issue of this service bulletin. Operators that incorporated the original issue of this SB, have to change the labels and wire termination in the J2802 relay box assembly in accordance with Figures 3, 4, 5, 6, 7, 8, 9, or 10 as applicable, and do a functional test within the compliance time specified in paragraph 1.

E. Also, operators have to inspect the imprinted text on the ID tape of wire W368-031-20 installed in accordance with Figures 82 and 83 or Figures 82 and 84 within the compliance time specified in paragraph 1. E. Some wires W368-031-20 delivered in the kits have been identified incorrectly as "W036-031-20". If they are imprinted as "W036-031-20", then correct that text of the I.D. tapes to "W0368-031-20" using a permanent marker The work in this service bulletin is done in the maintenance zone(s) given below.

Group 1, 4-5, 8, 19, 21, 24, 26, 30:

Affected Maintenance Zones ZoneModel 102, 205737-400

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 33 of 434 BOEING SERVICE BULLETIN 737-28A1216

ALERTALERT

Group 2, 6-7, 11-12, 14-18, 20, 22, 25, 28-29:

Affected Maintenance Zones ZoneModel 102, 205737-300 Group 3, 10:

Affected Maintenance Zones ZoneModel 102, 205737-300, 737-500 Group 9, 13, 31:

Affected Maintenance Zones ZoneModel 102, 205737-500 Group 23:

Affected Maintenance Zones ZoneModel 102, 205737-300, 737-400, 737-500 Group 27:

Affected Maintenance Zones ZoneModel 102, 105, 205737-300 Group 27:

Affected Maintenance Zones ZoneModel 105, 205737-500 Group 31:

Affected Maintenance Zones ZoneModel 105, 205737-400

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 34 of 434 BOEING SERVICE BULLETIN 737-28A1216

ALERTALERT

E. Compliance Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM 2010-NM-189-AD, is related to this service bulletin.

The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

Boeing recommends that the change given in this service bulletin be done within 36 months after the original issue date of this service bulletin.

F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.

This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the installation of the automatic shutoff system for the center tank fuel pumps in accordance with this service bulletin and the installation of a modified P5-2 Fuel System Module in accordance with Service Bulletin 737-28A1210, Revision 1, as an alternative method of compliance (AMOC) to the requirements of paragraph (a) of AD 2001-08-24. Compliance with the conditions of this AMOC approval requires concurrent incorporation of the associated revisions to Airplane Flight Manual Sections 1 and 3 and incorporation of Airworthiness Limitations (AWL) 28-AWL-20in Boeing document "737-100/200/200C/300/400/500 Airworthiness Limitations (AWLs) and Certification Maintenance Requirements (CMRs), D6-38278-CMR," into the operator's maintenance documentation. In order to operate a mixed fleet of airplanes, some having automatic shutoff installed and others without automatic shutoff, it will be necessary to install a placard in the flight deck of airplanes that do not have automatic shutoff installed to alert the crew that the procedures required by paragraph(a) of AD 2001-08-24 must be followed on that airplane. The placard should read as follows (alternative placard wording may be used if approved by an appropriate FAA Principal Operations Inspector):

'AD 2001-08-24 fuel usage restrictions required" If an operator would like to use a different method of placarding their airplanes for operation as a mixed fleet, a request for approval of an AMOC should be submitted to the Seattle Aircraft Certification Office.

All provisions of AD 2001-08-24 that are not specifically referenced in the above statement remain fully applicable and must be complied with.

G. Manpower The table below shows an estimate of the task-hours necessary to do this change for each airplane.

This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task-hour data if necessary. The estimate does not include lost time. These are some examples of lost time:

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 35 of 434 BOEING SERVICE BULLETIN 737-28A1216

ALERTALERT

— Time to adjust to the workplace — Time to schedule the work — Time to inspect the work — Time to cure the materials — Time to find the tools.

Group 1:

Elapsed HoursTask-HoursNumber of Persons Task

4.0012.003Open Access

0.150.151FIGURE 1 --2FIGURE 3 (a)

3.607.202FIGURE 4

3.607.202FIGURE 5

0.150.151FIGURE 11

1.001.001FIGURE 12

1.001.001FIGURE 14

2.002.001FIGURE 15

0.500.501FIGURE 16

1.001.001FIGURE 18

1.501.501FIGURE 19 --2FIGURE 20 (a)

2.755.502FIGURE 21 --1FIGURE 44 (a)

3.803.801FIGURE 45 --2FIGURE 82 (a)

8.2016.402FIGURE 83

7.6015.202FIGURE 86

1.501.501FIGURE 88

1.501.501FIGURE 90

4.0012.003Close Access

1.002.002Test

48.8591.60TOTAL FOR EACH AIRPLANE

(a) This figure shows wire routes only. See the related wire connection figure for task hours.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 36 of 434 BOEING SERVICE BULLETIN 737-28A1216

ALERTALERT

Pages 37–48 of 434