TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '3ecbcd34be3a489ca56db8bb3e250023b8ea031c7898873b9460b03e9b948430' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '3ecbcd34be3a489ca56db8bb3e250023b8ea031c7898873b9460b03e9b948430' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Group 26:
Elapsed HoursTask-HoursNumber of Persons Task
1.201.201FIGURE 98
0.500.501FIGURE 100
0.600.601FIGURE 102
2.302.301FIGURE 104 --1FIGURE 105 (a)
0.650.651FIGURE 106
4.0012.003Close Access
1.002.002Test
52.3595.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) The task hours for this figure to be used only if operators ordered and received the Top Kits given in the original release of this service bulletin and they need to change the J2802 Box Assembly.
(c) See related wire connection figure for wire routing task hours.
Group 27:
Elapsed HoursTask-HoursNumber of Persons Task
4.0012.003Open Access
3.607.202FIGURE 4
3.607.202FIGURE 5
1.501.501FIGURE 19 --2FIGURE 20 (a)
2.755.502FIGURE 27 --1FIGURE 44 (a)
3.803.801FIGURE 55
8.2016.402FIGURE 83
7.6015.202FIGURE 86
1.501.501FIGURE 90
2.752.751FIGURE 92 (b)
2.802.801FIGURE 94 (b)
0.150.151FIGURE 96 (c)
1.201.201FIGURE 98
0.500.501FIGURE 100
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 73 of 434 BOEING SERVICE BULLETIN 737-28A1216
ALERTALERT
Group 27:
Elapsed HoursTask-HoursNumber of Persons Task
0.600.601FIGURE 102
2.302.301FIGURE 104 --1FIGURE 105
0.650.651FIGURE 106
4.0012.003Close Access
1.002.002Test
52.3595.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) The task hours for this figure to be used only if operators ordered and received the Top Kits given in the original release of this service bulletin and they need to change the J2802 Box Assembly.
(c) See related wire connection figure for wire routing task hours.
Group 28, Configuration 1:
Elapsed HoursTask-HoursNumber of Persons Task
4.0012.003Open Access
3.607.202FIGURE 4
3.607.202FIGURE 5
1.501.501FIGURE 19 --2FIGURE 20 (a)
2.755.502FIGURE 27 --1FIGURE 44 (a)
3.803.801FIGURE 62
8.2016.402FIGURE 83
7.6015.202FIGURE 86
1.501.501FIGURE 90
2.752.751FIGURE 92 (b)
2.802.801FIGURE 94 (b)
0.150.151FIGURE 96 (c)
1.201.201FIGURE 98
0.500.501FIGURE 100
0.600.601FIGURE 102
2.302.301FIGURE 104
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 74 of 434 BOEING SERVICE BULLETIN 737-28A1216
ALERTALERT
Group 28, Configuration 1:
Elapsed HoursTask-HoursNumber of Persons Task --1FIGURE 105
0.650.651FIGURE 106
4.0012.003Close Access
1.002.002Test
52.3595.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) The task hours for this figure to be used only if operators ordered and received the Top Kits given in the original release of this service bulletin and they need to change the J2802 Box Assembly.
(c) See related wire connection figure for wire routing task hours.
Group 28, Configuration 2:
Elapsed HoursTask-HoursNumber of Persons Task
4.0012.003Open Access
3.607.202FIGURE 4
3.607.202FIGURE 5
1.501.501FIGURE 19 --2FIGURE 20 (a)
2.755.502FIGURE 21 --1FIGURE 44 (a)
3.803.801FIGURE 63
8.2016.402FIGURE 83
7.6015.202FIGURE 86
1.501.501FIGURE 90
2.752.751FIGURE 92 (b)
2.802.801FIGURE 94 (b)
0.150.151FIGURE 96 (c)
1.201.201FIGURE 98
0.500.501FIGURE 100
0.600.601FIGURE 102
2.302.301FIGURE 104 --1FIGURE 105
0.650.651FIGURE 106
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 75 of 434 BOEING SERVICE BULLETIN 737-28A1216
ALERTALERT
Group 28, Configuration 2:
Elapsed HoursTask-HoursNumber of Persons Task
4.0012.003Close Access
1.002.002Test
52.3595.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) The task hours for this figure to be used only if operators ordered and received the Top Kits given in the original release of this service bulletin and they need to change the J2802 Box Assembly.
(c) See related wire connection figure for wire routing task hours.
Group 29, Configuration 1:
Elapsed HoursTask-HoursNumber of Persons Task
4.0012.003Open Access
3.607.202FIGURE 4
3.607.202FIGURE 5
1.501.501FIGURE 19 --2FIGURE 20 (a)
2.755.502FIGURE 28 --1FIGURE 56
8.2016.402FIGURE 83
7.6015.202FIGURE 86
1.501.501FIGURE 90
2.752.751FIGURE 92 (b)
2.802.801FIGURE 94 (b)
0.150.151FIGURE 96 (c)
1.201.201FIGURE 98
0.500.501FIGURE 100
0.600.601FIGURE 102
2.302.301FIGURE 104 --1FIGURE 105
0.650.651FIGURE 106
4.0012.003Close Access
1.002.002Test
48.5591.30TOTAL FOR EACH AIRPLANE
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 76 of 434 BOEING SERVICE BULLETIN 737-28A1216
ALERTALERT
Group 29, Configuration 1:
Elapsed HoursTask-HoursNumber of Persons Task
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) The task hours for this figure to be used only if operators ordered and received the Top Kits given in the original release of this service bulletin and they need to change the J2802 Box Assembly.
(c) See related wire connection figure for wire routing task hours.
Group 29, Configuration 2:
Elapsed HoursTask-HoursNumber of Persons Task
4.0012.003Open Access
3.607.202FIGURE 4
3.607.202FIGURE 5
1.501.501FIGURE 19 --2FIGURE 20 (a)
2.755.502FIGURE 28 --1FIGURE 57
8.2016.402FIGURE 83
7.6015.202FIGURE 86
1.501.501FIGURE 90
2.752.751FIGURE 92 (b)
2.802.801FIGURE 94 (b)
0.150.151FIGURE 96 (c)
1.201.201FIGURE 98
0.500.501FIGURE 100
0.600.601FIGURE 102
2.302.301FIGURE 104 --1FIGURE 105
0.650.651FIGURE 106
4.0012.003Close Access
1.002.002Test
48.5591.30TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 77 of 434 BOEING SERVICE BULLETIN 737-28A1216
ALERTALERT
Group 29, Configuration 2:
Elapsed HoursTask-HoursNumber of Persons Task
(b) The task hours for this figure to be used only if operators ordered and received the Top Kits given in the original release of this service bulletin and they need to change the J2802 Box Assembly.
(c) See related wire connection figure for wire routing task hours.
Group 30, Configuration 1:
Elapsed HoursTask-HoursNumber of Persons Task
4.0012.003Open Access
3.607.202FIGURE 7 (b)
3.607.202FIGURE 8
3.607.202FIGURE 9 (b)
3.607.202FIGURE 10
1.501.501FIGURE 33 --2FIGURE 34 (a)
2.755.502FIGURE 35
2.304.602FIGURE 36
2.304.602FIGURE 37 --1FIGURE 66 (a)
3.803.801FIGURE 75
3.803.801FIGURE 76
16.3032.602FIGURE 84
15.1030.202FIGURE 87
1.501.501FIGURE 91
3.003.001FIGURE 93 (b)
2.802.801FIGURE 95 (b)
0.150.151FIGURE 97 (c)
1.201.201FIGURE 99
0.500.501FIGURE 101
0.600.601FIGURE 103 --1FIGURE 105
0.750.751FIGURE 107
4.0012.003Close Access
1.002.002Test
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 78 of 434 BOEING SERVICE BULLETIN 737-28A1216
ALERTALERT
Group 30, Configuration 1:
Elapsed HoursTask-HoursNumber of Persons Task
81.60151.75TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) The task hours for this figure to be used only if operators ordered and received the Top Kits given in the original release of this service bulletin and they need to change the J2802 Box Assembly.
(c) See related wire connection figure for wire routing task hours.
Group 30, Configuration 2:
Elapsed HoursTask-HoursNumber of Persons Task
4.0012.003Open Access
3.607.202FIGURE 7 (b)
3.607.202FIGURE 8
3.607.202FIGURE 9 (b)
3.607.202FIGURE 10
1.501.501FIGURE 33 --2FIGURE 34 (a)
2.755.502FIGURE 35
2.304.602FIGURE 36
2.304.602FIGURE 37 --1FIGURE 66 (a)
3.803.801FIGURE 75
3.803.801FIGURE 76
16.3032.602FIGURE 84
15.1030.202FIGURE 87
1.501.501FIGURE 91
3.003.001FIGURE 93 (b)
2.802.801FIGURE 95 (b)
0.150.151FIGURE 97 (c)
1.201.201FIGURE 99
0.500.501FIGURE 101
0.600.601FIGURE 103 --1FIGURE 105
0.750.751FIGURE 107
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 79 of 434 BOEING SERVICE BULLETIN 737-28A1216
ALERTALERT
Group 30, Configuration 2:
Elapsed HoursTask-HoursNumber of Persons Task
4.0012.003Close Access
1.002.002Test
81.60151.75TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) The task hours for this figure to be used only if operators ordered and received the Top Kits given in the original release of this service bulletin and they need to change the J2802 Box Assembly.
(c) See related wire connection figure for wire routing task hours.
Group 31:
Elapsed HoursTask-HoursNumber of Persons Task
4.0012.003Open Access
3.607.202FIGURE 4
3.607.202FIGURE 5
1.501.501FIGURE 19 --2FIGURE 20 (a)
2.755.502FIGURE 26 --1FIGURE 44 (a)
3.803.801FIGURE 54
8.2016.401FIGURE 83
7.6015.202FIGURE 86
1.501.501FIGURE 90
2.752.751FIGURE 92 (b)
2.802.801FIGURE 94 (b)
0.150.151FIGURE 96 (c)
1.201.201FIGURE 98
0.500.501FIGURE 100
0.600.601FIGURE 102
2.302.301FIGURE 104 --1FIGURE 105
0.650.651FIGURE 106
4.0012.003Close Access
1.002.002Test
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 80 of 434 BOEING SERVICE BULLETIN 737-28A1216
ALERTALERT
Group 31:
Elapsed HoursTask-HoursNumber of Persons Task
52.3595.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) The task hours for this figure to be used only if operators ordered and received the Top Kits given in the original release of this service bulletin and they need to change the J2802 Box Assembly.
(c) See related wire connection figure for wire routing task hours.
H. Weight and Balance Changes Group 1-13, 15-16, 19-20:
AIRPLANES WITHOUT AIRSTAIRS Change in Moment (Pound-Inches) Change in Weight (Pounds) Airplane +1,300+6Each 737-300 +900+6Each 737-400 +1,650+6Each 737-500 Group 14, 17-18, 21-31:
AIRPLANES WITHOUT AIRSTAIRS Change in Moment (Pound-Inches) Change in Weight (Pounds) Airplane +1,400+6.4Each 737-300 +950+6.4Each 737-400 +1,750+6.4Each 737-500 I. Electrical Load Data
1. Direct Current (DC) Loads Group 1-16:
BusAmperesCircuit Breaker 28V DC Bus 1150 MilliampereC3318 28V DC Bus 2150 MilliampereC3320 Group 17-20:
BusAmperesCircuit Breaker 28V DC Bus 1150 MilliampereC3318
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 81 of 434 BOEING SERVICE BULLETIN 737-28A1216
ALERTALERT
Group 17-20:
BusAmperesCircuit Breaker 28V DC Bus 2150 MilliampereC3320 28V DC Bus 1150 MilliampereC3327 28V DC Bus 2150 MilliampereC3329
2. Alternating Current (AC) Loads None,
3. Type Intermittent J. References
1. Existing Data:
a. Engineering Change Memo PRR 35442-RS
b. Boeing Service Bulletin 737-28A1206, 737-28A1210, 737-28A1228
c. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2001-08-24
d. Federal Aviation Administration (FAA) Notice of Proposed Rule Making (NPRM) 2010-NM-189-AD
e. Standard Overhaul Practices Manual (SOPM) 20-30-03, 20-41-02, 20-43-03, 20-44-01 , 20-50-10, 20-50-19
f. Standard Wiring Practices Manual (SWPM) 20-10-04, 20-10-11, 20-10-12, 20-10-14, 20-10-18, 20-10-19, 20-20-00, 20-20-10, 20-20-11, 20-30-00, 20-30-11, 20-30-12, 20-60-00, 20-60-08, 20-61-11, 20-81-11, 20-81-17, 20-81-19, 20-81-22, 20-90-11
g. 737-300/400/500 Aircraft Maintenance Manual (AMM) 12-31-11, 24-22-00, 24-31-11, 25-10-00, 25-11-21, 25-51-01, 28-22-00, 32-00-01, 52-48-41, 52-61-00, 52-61-10
h. 737-300/400/500 Wiring Diagram Manual (WDM) 28-23-01, 28-23-02, 28-43-01
i. 737-300 Structural Repair Manual (SRM) 51-40-02, 51-40-05
j. 737-400 Structural Repair Manual (SRM) 51-40-02, 51-40-05
k. 737-500 Structural Repair Manual (SRM) 51-40-02, 51-40-05
l. BAE Systems Service Bulletin 69-37335-28-04
2. Data supplied with this Service Bulletin:
None.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 82 of 434 BOEING SERVICE BULLETIN 737-28A1216
ALERTALERT
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number Kit- Wire Installation, Auto Shut Off System61-74478 Wire Bundle Installation- Flight Compartment65-48315 Wire Bundle Installation- Flight Compartment65-48322 Wire Bundle Installation- Flight Compartment65-48325 Disconnect Panel Installation- Flight Compartment65-49731 Support Post Installation- E2 and E3 Rack65-63811 Moisture Shroud Instl - Elec/Elex Racks (E2 and E3)65-78950 Top Kit- Fuel Boost Pump, Auto Shut Off System, Center Fuel Tank65C38471 Kit- J2802 Box Installation, Auto Shut Off System,65C38484 These drawings were used to prepare this service bulletin. These drawings are not necessary to make the specified changes, and are not supplied with this service bulletin. These drawings may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications Chapter-SectionPublication Section 1 and Section 3.1737 Airplane Flight Manual 12, NP and NNC737 Operations Manual 28-22737 Maintenance Manual 28-23, 28-43737 Wiring Diagram Manual 28-23737 System Schematic Manual 28-22737 Illustrated Parts Catalog 28737 Dispatch Deviation Guide 28737 Minimum Equipment List
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts None.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 83 of 434 BOEING SERVICE BULLETIN 737-28A1216
ALERTALERT
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 29, 2010 737-28A1216Revision 1: March 26, 2012 84 of 434 BOEING SERVICE BULLETIN 737-28A1216