Copy · U.S. DOT/FAA - Boeing Service Bulletin · 297 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2010-0232; AD 2010-26-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'd09cbe49e9922e00f1e43ec692bc5a62abe2f6a8fdcb0f975e20b8b09ea576bc'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Show pages 13–24

Group 1-15:

Table 1 - Lap Joint Inspection Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later)ActionCondition between STA 1960 and STA 1980; this inspection must be repeated at intervals not to exceed 1,500 flightcycles. This inspection is for cracks in the upper skin under an external doubler.

(g) Until the structural modification as given in work instructions Paragraph 3.B.3., Part 3 is installed, any inspection or replacement requirements as given in the applicable 747 SRM must be accomplished.

Group 1-15:

Table 2 - Lap Joint Modification Compliance Time (Whichever Occurs Later)ActionCondition Within 3,000 flight-cycles after the Revision 1 date of this service bulletin. (b) Before 30,000 total flight cycles.

Do the lap joint modification as given in Work Instructions Paragraph 3.B.3., Part 3. (a)

(d) All airplanes.

Within 15,000 flight-cycles after modification was done.Additional lap joint modifications and/or inspections are required. Contact Boeing for instructions. (c) Areas where lap joint modification was done as given in work instructions Paragraph 3.B.3., Part 3 before the airplane accumulated 20,000 total flight cycles. (d) Before 35,000 total flight cycles.Additional lap joint modifications and/or inspections are required. Contact Boeing for instructions and perform those actions provided by Boeing's instructions. (c) All airplanes.

(a) Accomplishment of a lap joint modification as given in Paragraph 3.B.3, Part 3 terminates the repeat inspections as given in work instructions Paragraph 3.B.1., Part 1 and 3.B.2., Part 2 for the length of the lap joint that is modified.

(b) For lap joints specified in Paragraph 3.B.3., Work Instructions, Part 3 on airplanes with more than 30,000 total flight cycles, the inspection intervals in Table 1 and Table 2 must be reduced to 1,500 flight cycles until the lap joint modification is accomplished as given in Paragraph 3.B.3., Work Instructions, Part 3.

(c) It is suggested that operators contact Boeing for instructions at least one year before the inspection/modification data will be needed.

(d) The external modification doubler installation as given in Service Bulletin 747-53A2499 Revision 1 meets the requirements of the modification as given in this service bulletin revision.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 11, 2005 747-53A2499Revision 2: August 12, 2010 25 of 297 BOEING SERVICE BULLETIN 747-53A2499

Group 16:

Table 3 - Lap Joint Inspection Compliance TimeActionCondition As given in Service Bulletin 747-53A2817.Do the inspections of lap joints as given in work instructions Paragraph 3.B.1., Part

1. (a) All airplanes.

(a) These inspections of lap joints are related to Service Bulletin 747-53A2817.

Group 16:

Table 4 - Lap Joint Modification Compliance TimeActionCondition As given in Service Bulletin 747-53A2817.Do the modification provided by Boeing. (a) All airplanes.

(a) Contact Boeing for modification instructions a minimum of two years prior to reaching the compliance time.

NOTE: 1. On airplanes modified or repaired as shown in Boeing Service Bulletin 747-53-2386, do repeated external Low Frequency Eddy Current (LFEC) inspections of the area at S-44L from STA 560 to STA 580 every 2,400 flight-cycles, as shown in this service bulletin.

2. On airplanes with a Main Deck Side Cargo Door, do repeated internal LFEC inspections of the area at S-4L from STA 1720 to STA 1740 and from STA 1960 to STA 1980 every 1,500 flight-cycles, as shown in this service bulletin.

F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.

This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft Certification Office (ACO) approves the inspection, repair, and modification procedures with the corresponding compliance times specified in Tables 1 and 2 under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the inspections and repairs required by paragraphs (h), (i), and (j) of AD 2004-07-22 R1, for the inspection of Structural Significant Items (SSI) F-25G, F-25H, and F-25I of Supplemental Structural Inspection Document (SSID) D6-35022, Revision

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 11, 2005 747-53A2499Revision 2: August 12, 2010 26 of 297 BOEING SERVICE BULLETIN 747-53A2499

G. This AMOC only applies to the areas inspected by this service bulletin. When this service bulletin specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (l) of the AD. All provisions of AD 2004-07-22 R1 that are not specifically referenced in this paragraph, including the initial inspection threshold per paragraph (i) of AD 2004-07-22 R1, remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the modification procedures with the corresponding compliance times specified in Table 2 under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the inspections and repairs required by paragraphs

(h), (i), and (j) of AD 2004-07-22 R1, for the inspection of SSI F-25K of SSID D6-35022, Revision G.

This AMOC only applies to the areas modified by this service bulletin. When this service bulletin specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (l) of the AD. All provisions of AD 2004-07-22 R1 that are not specifically referenced in this paragraph, including the initial inspection threshold per paragraph (i) of AD 2004-07-22 R1, remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the inspection procedures with the corresponding compliance times specified in Table 1, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the post-modification inspection requirements with the corresponding compliance times required by paragraph (p) of AD 2008-16-14. This AMOC is only for areas where inspections are done in accordance with this service bulletin. When this service bulletin specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (v) of the AD. All provisions of AD 2008-16-14 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the inspection, repair, and modification procedures with the corresponding compliance times specified in Tables 1 and 2, under paragraph

1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the inspection and repair requirements with the corresponding compliance times required by paragraphs (f) and (g) of AD 2006-05-09. When this service bulletin specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (i) of the AD. All provisions of AD 2006-05-09 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the inspection and repair procedures with the corresponding compliance times specified in Table 1, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the post-modification inspection and repair requirements with the corresponding compliance times required by paragraph (c) of AD 94-15-17. This AMOC is only for areas where inspections are done in accordance with this service bulletin. When this service bulletin specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (d) of the AD. All provisions of AD 94-15-17 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the modification procedures with the corresponding compliance times specified in Table 2, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the inspection requirements with the corresponding compliance times required by paragraph (g) of AD 2006-22-09. This AMOC is only for areas where modification doublers have been installed in accordance with this service bulletin. When this SB specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (j) of the AD. All provisions of AD 2006-22-09 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 11, 2005 747-53A2499Revision 2: August 12, 2010 27 of 297 BOEING SERVICE BULLETIN 747-53A2499

In addition, the Manager of the FAA Seattle ACO approves the modification procedures with the corresponding compliance times specified in Table 2, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the inspection requirements with the corresponding compliance times required by paragraph A. of AD 90-23-14. When this SB specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph E. of the AD. All provisions of AD 90-23-14 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the modification procedures with the corresponding compliance times specified in Table 2, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the inspection and modification requirements with the corresponding compliance times required by paragraphs A., C., and D. of AD 90-21-17. When this SB specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph G. of the AD. All provisions of AD 90-21-17 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the modification procedures with the corresponding compliance times specified in Table 2, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the inspection and modification requirements with the corresponding compliance times required by paragraphs (g), (i), and (j) of AD 2009-04-16. When this SB specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (k) of the AD. All provisions of AD 2009-04-16 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the modification procedures with the corresponding compliance times specified in Table 2, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the inspection procedures with the corresponding compliance times specified in Table 1, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2675, dated October 12, 2006, required by paragraph (f) of AD 2006-24-05. This AMOC is only for areas where stringer 6 modification doublers have been installed in accordance with this service bulletin. When this SB specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (j) of the AD. All provisions of AD 2006-24-05 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the modification procedures with the corresponding compliance times specified in Table 2, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the inspection requirements with the corresponding compliance times required by paragraph (f) and (k) of AD 2006-24-02. This AMOC is only for areas where stringer 6 modification doublers have been installed in accordance with this service bulletin.

When this SB specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (n) of the AD. All provisions of AD 2006-24-02 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the modification procedures with the corresponding compliance times specified in Table 2, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the Zone 1 external doubler modification requirement aft of body station (Sta) 340, at Stringer 6, with the corresponding compliance time for Service Bulletin 747-53-2272, Revision 12, Service Bulletin 747-53-2253 initial release, and Service Bulletin 747-53A2303, initial release, specified in Section 3 of the Aging Airplane Service Bulletin Structural Modification and Inspection Program Document D6-35999, dated March 31, 1989 required by paragraph

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 11, 2005 747-53A2499Revision 2: August 12, 2010 28 of 297 BOEING SERVICE BULLETIN 747-53A2499

A. of AD 90-06-06. This AMOC is only for areas where the external doublers are installed in accordance with Service Bulletin 747-53A2499, Revision 2. When this SB specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph C. of the AD. All provisions of AD 90-06-06 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the modification procedures with the corresponding compliance times specified in Table 2, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the modification requirements with the corresponding compliance times required by paragraph (s) of AD 2005-08-01. This AMOC is only for areas on the skin where stringer 6 modification doublers have been installed aft of BS 340 in accordance with this service bulletin. When this SB specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (t) of the AD. All provisions of AD 2005-08-01 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the modification procedures with the corresponding compliance times specified in Table 2, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the inspection and modification requirements with the corresponding compliance times specified in Tables 1 and 2, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2542, dated February 16, 2006 required by paragraphs (f) and (h) of AD 2007-15-07. When this SB specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (i) of the AD. All provisions of AD 2007-15-07 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

In addition, the Manager of the FAA Seattle ACO approves the modification procedures with the corresponding compliance times specified in Table 2, under paragraph 1.E., "Compliance", of Service Bulletin 747-53A2499, Revision 2, as an AMOC to the inspection requirements with the corresponding compliance times required by paragraphs (f) and (h) of AD 2006-20-02. This AMOC is only for areas where modification doublers have been installed in accordance with this service bulletin. When this SB specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (k) of the AD. All provisions of AD 2006-20-02 that are not specifically referenced in this paragraph remain fully applicable and must be complied with.

G. Manpower The table below shows an estimate of the task-hours necessary to do this inspection for each airplane.

This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task-hour data if necessary. The estimate does not include lost time. These are some examples of lost time:

— Time to adjust to the workplace — Time to schedule the work — Time to examine the work — Time to cure the materials — Time to make the parts — Time to find the tools.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 11, 2005 747-53A2499Revision 2: August 12, 2010 29 of 297 BOEING SERVICE BULLETIN 747-53A2499

Groups 1 through 16 - Lap Joint Inspections - Area 1 Elapsed HoursTask-HoursNumber of Persons Task

2.5010.004Prepare

21.0084.004Examine Section 41

40.00160.004Examine Section 42

74.25297.004Examine Section 46

137.50551.00 (a)TOTAL FOR EACH AIRPLANE

(a) More time will be necessary for repairs if cracks are found.

Groups 1 through 16 - Lap Joint Inspections - Area 1 and Area 2 Elapsed HoursTask-HoursNumber of Persons Task

2.5010.004Prepare

21.0084.004Examine Section 41

47.50190.004Examine Section 42

97.75391.004Examine Section 46

168.75675.00 (a)TOTAL FOR EACH AIRPLANE

(a) More time will be necessary for repairs if cracks are found.

Groups 1 through 16 - Lap Joint Modifications Elapsed HoursTask-HoursNumber of Persons Task

287.754604.0016Modify Section 41

303.751215.004Modify Section 42

591.55819.00TOTAL FOR EACH AIRPLANE H. Weight and Balance Changes Installation of lap joint repairs and modifications given in this service bulletin will affect the weight and balance of the airplane. Determination of these changes is necessary, once the configuration of the lap joint repairs and modifications are defined.

I. Electrical Load Data Not changed.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 11, 2005 747-53A2499Revision 2: August 12, 2010 30 of 297 BOEING SERVICE BULLETIN 747-53A2499

J. References

1. Existing Data:

a. Engineering Change Memo PRR85901-44RS and PRR85901-91RS.

b. Service Related Problem (SRP) 747-SRP-53-0211 and 747OP-SRP-53-0279.

c. 747-100/-200/-300 Structural Repair Manual (SRM) Subject 51-10-04, 51-10-06, 51-30-08, 51-70-00, 51-70-03, 53-30-03.

d. 747-400 Structural Repair Manual (SRM) Subject 51-10-01, 51-10-03, 51-20-05, 51-40-08, 53-00-01.

e. 747-400F Structural Repair Manual (SRM) Subject 51-10-01, 51-10-03, 51-20-05, 51-40-08, 53-00-01.

f. 747-400LCF Structural Repair Manual (SRM) Subject 51-10-01, 51-10-03, 51-20-05, 51-40-08, 53-00-01.

g. 747 Nondestructive Test (NDT) Manual D6-7170, Part 6, Subject 51-00-00, 53-30-00, 53-30-02, 53-30-06.

h. 747 Supplemental Structural Inspection Document (SSID) Boeing Document D6-35022.

i. Boeing Service Bulletins 747-53-2253, 747-53-2272, 747-53A2303, 747-53-2305, 747-53A2312, 747-53-2366, 747-53A2367, 747-53-2386, 747-53A2501, 747-53A2563, 747-53A2748.

j. FAA Airworthiness Directives 90-06-06, 90-21-17, 90-23-14, 94-15-17, 2004-07-22 R1, 2005-08-01, 2006-05-09, 2006-20-02, 2006-22-09, 2006-24-02, 2006-24-05, 2007-15-07, 2008-16-14, and 2009-04-16.

k. Boeing Parts Standards Document D-590.

l. Boeing Drawing 012W6100.

m. Boeing Standard Overhaul Practices Manual (SOPM) 20-41-01 and 20-50-11.

2. Data supplied with this Service Bulletin:

a. Drawings:

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 11, 2005 747-53A2499Revision 2: August 12, 2010 31 of 297 BOEING SERVICE BULLETIN 747-53A2499

ADCNDCN/REVSheetTitleDrawing No --1Kit - Lap Splice Modification, S-6, Sta 340

- Sta 520 141U0008 --10 --11 --12 -A13 -A14 -A15 --2 --3 --4 --5 --6 --7 --8 -A9 -APSDLKit - Lap Splice Modification, S-6, Sta 340

- Sta 520 141U0008#DL

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 11, 2005 747-53A2499Revision 2: August 12, 2010 32 of 297 BOEING SERVICE BULLETIN 747-53A2499

ADCNDCN/REVSheetTitleDrawing No --1Kit - Lap Splice Modification, S-6, Sta 340

- 520 141U0059 -A10 -A11 -A12 -A13 -A14 -A15 -A16 -A17 -A18 -A19 -A2 -A3 -A4 -A5 -A6 -A7 -A8 -A9 --PSDLKit - Lap Splice Modification, S-6, Sta 340

- 520 141U0059#DL -B2Lap Splice Reinforcement, Stringer 23, Sta 220 - Sta 400 691U1050 --3 --4 --5 -CPSDLLap Splice Reinforcement, Stringer 23, Sta 220 - Sta 400 691U1050#DL -A1Lap Splice Reinforcement, Stringer 44, Sta 420 - Sta 520 691U1051 -CPSDLLap Splice Reinforcement, Stringer 44, Sta 420 - Sta 520 691U1051#DL -A1Lap Splice Reinforcement, Stringer 44, Sta 520 - Sta 471 691U1052 --2 -A3

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 11, 2005 747-53A2499Revision 2: August 12, 2010 33 of 297 BOEING SERVICE BULLETIN 747-53A2499

ADCNDCN/REVSheetTitleDrawing No -CPSDLLap Splice Reinforcement, Stringer 44, Sta 520 - Sta 471 691U1052#DL

3. Installation Drawings Used in the Preparation of this Service Bulletin:

None.

K. Publications Affected

1. Publications:

None.

2. Damage Tolerance Based Structural Inspections:

Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the Maintenance Program. This service bulletin affects FCS. DTI requirements for the structure affected are contained in Paragraph 1.E., Compliance of this service bulletin.

L. Interchangeability and Intermixability of Parts Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 11, 2005 747-53A2499Revision 2: August 12, 2010 34 of 297 BOEING SERVICE BULLETIN 747-53A2499

2. MATERIAL INFORMATION A. Material - Price and Availability Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary For Each Airplane, as shown below. Alternatively, operators can fabricate their own parts. If there is a limit to the quantity (QTY) of available kits, a supply sequence is given by Spares. More kits become available as shown in the Reorder Lead Time (ROLT). ROLT is calculated from the date Boeing gets the purchase order.

Unit Price thru Jan 31/11 ROLT (Weeks) QTYDateNameKit Number $5001.00431Jan 21/10Kit - Lap Splice Modification 141U0059-1 $4887.00433Dec 08/09Kit - Lap Splice Modification 141U0059-2 $5004.00432Jan 21/10Kit - Lap Splice Modification 141U0059-3 $4333.00433Dec 08/09Kit - Lap Splice Modification 141U0059-4 $6787.00431Jan 21/10Kit - Lap Splice Modification 141U0059-5 $6880.00433Dec 08/09Kit - Lap Splice Modification 141U0059-6 $6708.00432Jan 21/10Kit - Lap Splice Modification 141U0059-7 $6645.00434Jan 21/10Kit - Lap Splice Modification 141U0059-8 $5898.00431Jan 21/10Kit - Lap Splice Modification 141U0059-9 $5465.00432Dec 08/09Kit - Lap Splice Modification 141U0059-10 $7586.00431Jan 21/10Kit - Lap Splice Modification 141U0059-11 $6961.00432Dec 08/09Kit - Lap Splice Modification 141U0059-12 Unit Price thru Jan 31/11 ROLT (Weeks) QTYDateNameKit Number $3135.00(a)(a)(a)Kit - Lap Splice Modification 141U0008-1 $3121.00(a)(a)(a)Kit - Lap Splice Modification 141U0008-2

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 11, 2005 747-53A2499Revision 2: August 12, 2010 35 of 297 BOEING SERVICE BULLETIN 747-53A2499

Unit Price thru Jan 31/11 ROLT (Weeks) QTYDateNameKit Number $3135.00(a)(a)(a)Kit - Lap Splice Modification 141U0008-3 $3122.00(a)(a)(a)Kit - Lap Splice Modification 141U0008-4 $2990.00(a)(a)(a)Kit - Lap Splice Modification 141U0008-5 $2990.00(a)(a)(a)Kit - Lap Splice Modification 141U0008-6 $3096.00(a)(a)(a)Kit - Lap Splice Modification 141U0008-7 $2948.00(a)(a)(a)Kit - Lap Splice Modification 141U0008-8

(a) These kits are were not available at the time of release of Revision 2 of this service bulletin.

Boeing recommends that operators submit a purchase order 18 months in advance of performing the modification.

B. Industry Support Information Boeing warranty remedies are not available for the inspection, repair, or modification procedures given in this service bulletin.

C. Parts Necessary For Each Airplane

1. Kits/Parts:

NOTE: The kits shown below are for lap splice modification at stringer 6. See Drawing 141U0008, Sheet 1 and Drawing 141U0059, Sheet 1 for kit applicability. The kits below can be ordered from Boeing, or the equivalent parts can be supplied by the operator.

To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.

Kit 141U0008 NotesExisting Part Number NameQTYNew Part Number -1-2-3-4-5-6

KIT - LAP SPLICE MODIFICA- TION, S-6, STA 340 - STA 520

-141U0008-1

KIT - LAP SPLICE MODIFICA- TION, S-6, STA 340 - STA 520

.-141U0008-2

KIT - LAP SPLICE MODIFICA- TION, S-6, STA 340 - STA 520 ..-...141U0008-3

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 11, 2005 747-53A2499Revision 2: August 12, 2010 36 of 297 BOEING SERVICE BULLETIN 747-53A2499

Pages 37–48 of 297