Copy · U.S. DOT/FAA - SB-747-53A2852-00 · 189 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2015-3983; AD 2016-07-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '5f45669c09d2afd8c3b03cedac261fedbc9611f8ef2972ef20448774a7835e0a'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Show pages 1–12

GroupVariable Number 1RD231 - RD232 2RD233 - RD234 1RD235 3RD241 - RD243 1RD251 - RD262 1RD271 - RD272 1RD291 - RD292 4RD301 3RD302 1RD311 1RD351 - RD357 2RD358 4RD361 - RD366 5RD381 - RD383 4RD411 - RD412 3RD413 - RD414 1RD421 - RD426 1RD431 - RD435 4RD441 - RD442 1RD451 - RD456 2RD461 3RD471 - RD475 1RD513 - RD519 1RD531 - RD533 2RD551 1RD561 1RD571 4RD581 - RD583 1RD591 - RD593 6RD601 - RD602 5RD603 - RD607 1RD621 2RD622 - RD623 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 22, 2012 747-53A2852 13 of 189 BOEING SERVICE BULLETIN 747-53A2852

ALERTALERT

GroupVariable Number 2RD641 - RD643 1RD644 - RD645 2RD646 1RD647 - RD649 1RD651 - RD659 1RD661 1RD671 1RD681 - RD682 2RD691 1RD692 1RD701 - RD702 5RD721 - RD722 3RD741 - RD742 1RD751 2RD752 1RD753 - RD755 1RD761 1RD771 - RD775 1RD781 - RD783 1RD791 - RD792 1RE001 1RG001 - RG009 1RG091 3RG095 1RG101 - RG104 3RG121 - RG126 1RG141 - RG142 3RG161 - RG164 1RG171 - RG174 1RG191 - RG193 1RG211 - RG213 3RG221 - RG222 1RH101 - RH102 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 22, 2012 747-53A2852 14 of 189 BOEING SERVICE BULLETIN 747-53A2852

ALERTALERT

GroupVariable Number 1RH111 - RH112 1RH121 - RH122 5RS001 - RS002 5RS201 5RS211 - RS212 5RS221 - RS222 5RS231 - RS241 5RS251 - RS259 5RS263 5RS265 - RS268 5RS271 - RS276 5RS291 - RS292 5RS301 - RS306 5RS311 - RS320 5RS331 - RS333 5RS341 - RS342 5RS699 5RS701 - RS703 5RS711 - RS713 6RS721 - RS722 5RS731 - RS732 5RS741 - RS743 5RS751 - RS752 5RS761 6RS762 5RS771 5RS781 - RS782 5RS786

2. Spares Affected None.

B. Concurrent Requirements None.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 22, 2012 747-53A2852 15 of 189 BOEING SERVICE BULLETIN 747-53A2852

ALERTALERT

C. Reason This service bulletin gives instructions to replace the upper chords and reinforcing straps on the upper deck floor beams. The upper deck floor beam upper chords have been determined to be structure that could develop Widespread Fatigue Damage (WFD). WFD of the floor beam upper chords could reduce the structural integrity of the floor beams such that multiple adjacent beams could become severed, resulting in rapid decompression of the airplane.

Analysis by Boeing indicates that accomplishment of the inspections, repairs, and modifications currently in Service Bulletin 747-53A2452 are not adequate to ensure the structural integrity of the affected upper deck floor beam upper chords on airplanes that are operated beyond 30,000 total flight cycles. On these airplanes, Boeing recommends that the upper deck floor beam upper chords and reinforcing straps be replaced in accordance with this service bulletin.

For more information on WFD, refer to Boeing Service Letter 747-SL-53-088A.

D. Description Get access to upper deck floor beams from the upper deck and main deck, as necessary. Remove the floor beam upper chords and reinforcing straps. Do an open hole High Frequency Eddy Current (HFEC) inspection at all accessed holes and repair any cracks that are found. Fabricate and install new upper chords and reinforcing straps. Re-install any repairs or parts that are not replaced. Install all equipment and panels removed for access.

Upper chord replacement is only required at "full length" upper deck floor beams aft of station (STA) 360 that span the entire width of the airplane from the left side of body frame to the right side of body frame.

The work in this service bulletin is done in the maintenance zone(s) given below.

Group 1:

Affected Maintenance Zones ZoneModel 221, 222, 223, 224, 225, 226, 233, 234747-100, 747-100B, 747-200B, 747SR Group 1, 3:

Affected Maintenance Zones ZoneModel 221, 222, 223, 224, 225, 226747SP Group 2:

Affected Maintenance Zones ZoneModel 221, 222, 223, 224, 225, 226, 233, 234747-100, 747-200B, 747SR Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 22, 2012 747-53A2852 16 of 189 BOEING SERVICE BULLETIN 747-53A2852

ALERTALERT

Group 3-4, 6:

Affected Maintenance Zones ZoneModel 221, 222, 223, 224, 225, 226, 233, 234747-200B Group 5:

Affected Maintenance Zones ZoneModel 221, 222, 223, 224, 225, 226, 233, 234747-100B SUD, 747-200B Group 5-6:

Affected Maintenance Zones ZoneModel 221, 222, 223, 224, 225, 226747-300 E. Compliance Federal Aviation Administration (FAA) Airworthiness Directives AD 2004-07-22 R1 and AD 2005-20-29 are related to this service bulletin.

Table 1: Upper Deck Floor Beam - Upper Chord - Replacement Compliance Time (Whichever Occurs Later)ActionCondition Within 3,000 flight cycles after the original issue date of this service bulletin.

Before 30,000 total flight cycles. (a) Remove the existing upper deck floor beam upper chords and reinforcing straps or angles in accordance with Accomplishment Instructions Paragraph 3.B, Part 2.

All Airplanes Do an open hole HFEC inspection for cracks at all locations in the floor beam webs and side of body frames where fasteners were removed in accordance with Accomplishment Instructions Paragraph 3.B, Part 2.

Do a detailed inspection for cracks in any parts that were removed and will be re-installed in accordance with Accomplishment Instructions Paragraph 3.B, Part 2.

-Before further flightReplace the cracked part or contact Boeing for repair instructions and do the repair.

Any Crack found Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 22, 2012 747-53A2852 17 of 189 BOEING SERVICE BULLETIN 747-53A2852

ALERTALERT

Table 1: Upper Deck Floor Beam - Upper Chord - Replacement Compliance Time (Whichever Occurs Later)ActionCondition -Before further flight after the inspections are done in accordance with Accomplishment Instruction Paragraph

3.B, Part 2 is accomplished.

Make and install new upper deck floor beam upper chords and reinforcing straps or angles in accordance with Accomplishment Instructions Paragraph 3.B, Part 3.

All Airplanes

(a) Due to the after-modification requirements, and the possibility that it would be necessary to replace the upper chords and reinforcing straps again, Boeing does not recommend upper chord replacement prior to 15,000 total flight-cycles.

Group 1-2:

Table 2: After Replacement Inspections Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Within 20,000 flight cycles after the upper chord replacement in accordance with this service bulletin.

Do inspections of the replaced upper deck floor beam upper chords for cracks in accordance with Accomplishment Instructions Paragraph 3.B, Part 4.

Upper chord replacement has been done in accordance with this service bulletin, with minimum 1.7D edge margin on upper chord and all adjacent parts.

-Within 15,000 flight cycles after the upper chord replacement in accordance with this service bulletin.

Do inspections of the replaced upper deck floor beam upper chords for cracks in accordance with Accomplishment Instructions Paragraph 3.B, Part 4.

Upper chord replacement has been done in accordance with this service bulletin, with minimum 1.7D edge margin on upper chord and all adjacent parts, except minimum 1.5D edge margin at fasteners common to the floor beam to frame connection in Section 41.

-Before further flight.Contact Boeing for repair instructions and do the repair.

Any crack is found.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 22, 2012 747-53A2852 18 of 189 BOEING SERVICE BULLETIN 747-53A2852

ALERTALERT

Group 1-2:

Table 2: After Replacement Inspections Repeat Interval (Not to Exceed) Compliance TimeActionCondition 3,000 flight cycles.

-Repeat the inspections of the replaced upper deck floor beam upper chords for cracks in accordance with Accomplishment Instructions Paragraph 3.B, Part

4. (a) No crack is found.

2,000 flight cycles.

-Repeat the inspections of the replaced upper deck floor beam upper chords for cracks at strap/frame connections at STA 440 and 520 in accordance with Accomplishment Instructions Paragraph 3.B, Part 4. (b) -Within 10,000 flight cycles after the initial HFEC inspections of the replaced upper chords was done in accordance with Accomplishment Instructions Paragraph 3.B, Part 4.

Do the chord removal, open hole HFEC inspections, detailed inspections, chord fabrication, and new chord installation actions again, in accordance with Accomplishment Instructions Paragraph 3.B, Part 2 and Paragraph 3.B, Part 3.

(a) Except inspections of floor beam upper chord at strap/frame connections at STA 440 and 520.

(b) This inspection requirement corresponds to Structural Significant Item (SSI) F-20B of Supplemental Structural Inspection Document (SSID) D6-35022, Revision G, dated December 2000.

Group 3-5:

Table 3: After Replacement Inspections Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Within 20,000 flight cycles after the upper chord replacement in accordance with this service bulletin.

Do HFEC inspections of the replaced upper deck floor beam upper chords for cracks in accordance with Accomplishment Instructions Paragraph 3.B, Part

4.

Upper chord replacement has been done in accordance with this service bulletin, with minimum 1.7D edge margin on upper chord and all adjacent parts.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 22, 2012 747-53A2852 19 of 189 BOEING SERVICE BULLETIN 747-53A2852

ALERTALERT

Group 3-5:

Table 3: After Replacement Inspections Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Within 15,000 flight cycles after the upper chord replacement in accordance with this service bulletin.

Do inspections of the replaced upper deck floor beam upper chords for cracks in accordance with Accomplishment Instructions Paragraph 3.B, Part 4.

Upper chord replacement has been done in accordance with this service bulletin, with minimum 1.7D edge margin on upper chord and all adjacent parts, except minimum 1.5D edge margin at fasteners common to the floor beam to frame connection in Section 41.

-Before further flight.Contact Boeing for repair instructions and do the repair.

Any crack is found.

3,000 flight cycles.

-Repeat the HFEC inspections of the replaced upper deck floor beam upper chords for cracks in accordance with Accomplishment Instructions Paragraph

3.B, Part 4.

No crack is found.

-Within 10,000 flight cycles after the initial HFEC inspections of the replaced upper chords was done in accordance with Accomplishment Instructions Paragraph 3.B, Part 4.

Do the chord removal, open hole HFEC inspections, detailed inspections, chord fabrication, and new chord installation actions again, in accordance with Accomplishment Instructions Paragraph 3.B, Part 2 and Paragraph 3.B, Part 3.

Group 6:

Table 4: After Replacement Inspections Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Within 20,000 flight cycles after the upper chord replacement in accordance with this service bulletin.

Do inspections of the replaced upper deck floor beam upper chords for cracks in accordance with Accomplishment Instructions Paragraph 3.B, Part 4.

Upper chord replacement has been done in accordance with this service bulletin, with minimum 1.7D edge margin on upper chord and all adjacent parts.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 22, 2012 747-53A2852 20 of 189 BOEING SERVICE BULLETIN 747-53A2852

ALERTALERT

Group 6:

Table 4: After Replacement Inspections Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Within 15,000 flight cycles after the upper chord replacement in accordance with this service bulletin.

Do inspections of the replaced upper deck floor beam upper chords for cracks in accordance with Accomplishment Instructions Paragraph 3.B, Part 4.

Upper chord replacement has been done in accordance with this service bulletin, with minimum 1.7D edge margin on upper chord and all adjacent parts, except minimum 1.5D edge margin at fasteners common to the floor beam to frame connection in Section 41.

-Before further flight.Contact Boeing for repair instructions and do the repair.

Any crack is found.

3,000 flight cycles.

-Repeat the inspections of the replaced upper deck floor beam upper chords for cracks in accordance with Accomplishment Instructions Paragraph 3.B, Part

4. (a) No crack is found.

2,000 flight cycles.

-Repeat the inspections of the replaced upper deck floor beam upper chords for cracks at strap/frame connections at STA 440 and 520 in accordance with Accomplishment Instructions Paragraph 3.B, Part 4. (b) -Within 10,000 flight cycles after the initial HFEC inspections of the replaced upper chords was done in accordance with Accomplishment Instructions Paragraph 3.B, Part 4.

Do the chord removal, open hole HFEC inspections, detailed inspections, chord fabrication, and new chord installation actions again, in accordance with Accomplishment Instructions Paragraph 3.B, Part 2 and Paragraph 3.B, Part 3.

(a) Except inspections of floor beam upper chord at strap/frame connections at STA 440 and 520.

(b) This inspection requirement corresponds to Structural Significant Item (SSI) F-20B of Supplemental Structural Inspection Document (SSID) D6-35022, Revision G, dated December 2000.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 22, 2012 747-53A2852 21 of 189 BOEING SERVICE BULLETIN 747-53A2852

ALERTALERT

F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.

This service bulletin has been approved by the Federal Aviation Administration (FAA). In addition, the manager of the FAA Seattle Aircraft Certification Office approves the accomplishment of the replacement and after replacement actions with corresponding compliance times specified in Tables 1 - 4, under paragraph 1.E., "Compliance" of Service Bulletin 747-53A2852, original issue, as an Alternative Method of Compliance (AMOC) to the inspection and repair requirements with corresponding compliance times required by paragraphs (i), (m), (n), and (p) of AD 2005-20-29. This AMOC is only for upper deck floor beam upper chords and straps that have been replaced in accordance with this service bulletin. When this service bulletin specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (s) of the AD. All provisions of AD 2005-20-29 that are not specifically referenced in the above statement remain fully applicable and must be complied with accordingly.

In addition, the Manager of the Seattle ACO approves the accomplishment of the replacement and after replacement actions with corresponding compliance times specified in Tables 1 - 4 under paragraph

1.E., "Compliance" of Service Bulletin 747-53A2852, original issue, as an AMOC to the corresponding inspection and repair requirements of paragraphs (h), (i)(3), and (j) of AD 2004-07-22 R1, for the inspection of Structural Significant Items (SSI) F-19B, F-19D, F-19H, F-19I, F-20A, F-20B, and F-20G of Supplemental Structural Inspection Document (SSID) D6-35022, Revision G, dated December 2000.

This AMOC is only for upper deck floor beam upper chords and straps that have been replaced in accordance with this service bulletin. When this service bulletin specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph (l) of the AD. All provisions of AD 2004-07-22 R1 that are not specifically referenced in this paragraph remain fully applicable and must be complied with accordingly.

G. Manpower The table below shows an estimate of the task hours necessary to do this change for each airplane.

This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task hour data if necessary. The estimate does not include lost time. These are some examples of lost time:

— Time to adjust to the workplace — Time to schedule the work — Time to inspect the work — Time to cure the materials — Time to make the parts — Time to find the tools.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 22, 2012 747-53A2852 22 of 189 BOEING SERVICE BULLETIN 747-53A2852

ALERTALERT

Group 1:

Table 1: Upper Deck Floor Beam Upper Chord Replacement Elapsed HoursTask HoursNumber of Persons Task

15.13121.008PART 1 - Access

40.00160.004PART 2 - Upper Chord Removal and Structure Inspection

(a)(a)(a)PART 3 - Upper Chord Fabrication and Installation

15.13 (b)121.00 (b)8PART 5 - Restoration

70.25402.00TOTAL FOR EACH AIRPLANE

(a) Time to manufacture parts is not included in this estimate.

(b) Additional time to test systems will be dependant upon systems disturbed during access or chord replacement.

Group 2:

Table 2: Upper Deck Floor Beam Upper Chord Replacement Elapsed HoursTask HoursNumber of Persons Task

29.75238.008PART 1 - Access

40.00160.004PART 2 - Upper Chord Removal and Structure Inspection

(a)(a)(a)PART 3 - Upper Chord Fabrication and Installation

29.75 (b)238.00 (b)8PART 5 - Restoration

99.50636.00TOTAL FOR EACH AIRPLANE

(a) Time to manufacture parts is not included in this estimate.

(b) Additional time to test systems will be dependant upon systems disturbed during access or chord replacement.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 22, 2012 747-53A2852 23 of 189 BOEING SERVICE BULLETIN 747-53A2852

ALERTALERT

Group 3:

Table 3: Upper Deck Floor Beam Upper Chord Replacement Elapsed HoursTask HoursNumber of Persons Task

15.13121.008PART 1 - Access

37.50150.004PART 2 - Upper Chord Removal and Structure Inspection

(a)(a)(a)PART 3 - Upper Chord Fabrication and Installation

15.13 (b)121.00 (b)8PART 5 - Restoration

67.75392.00TOTAL FOR EACH AIRPLANE

(a) Time to manufacture parts is not included in this estimate.

(b) Additional time to test systems will be dependant upon systems disturbed during access or chord replacement.

Group 4:

Table 4: Upper Deck Floor Beam Upper Chord Replacement Elapsed HoursTask HoursNumber of Persons Task

29.75238.008PART 1 - Access

37.50150.004PART 2 - Upper Chord Removal and Structure Inspection

(a)(a)(a)PART 3 - Upper Chord Fabrication and Installation

29.75 (b)238.00 (b)8PART 5 - Restoration

97.00626.00TOTAL FOR EACH AIRPLANE

(a) Time to manufacture parts is not included in this estimate.

(b) Additional time to test systems will be dependant upon systems disturbed during access or chord replacement.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 22, 2012 747-53A2852 24 of 189 BOEING SERVICE BULLETIN 747-53A2852

ALERTALERT

Pages 25–36 of 189