TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'b44fc7db2675659669f7dab444875abef80d93cad0a92162e6c609d9917027e9' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'b44fc7db2675659669f7dab444875abef80d93cad0a92162e6c609d9917027e9' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Table 3: Nacelle Strut # 1 and # 4 Midspar Fitting Life-Limit Program Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs First) ActionCondition 3,000 flight cycles or 96 months, whichever occurs first. (a) Within 18 months after the Revision 6 date of this service bulletin.
Within 600 flight cycles after the Revision 6 date of this service bulletin.
Remove the inboard and outboard midspar fittings in accordance with Paragraph 3.B., Work Instructions, Part 3.d.
All airplanes.
Action 3.1: Do a detailed inspection and a surface High Frequency Eddy Current (HFEC) inspection of the inboard and outboard midspar fittings for any crack in accordance with Paragraph
3.B., Work Instructions, Part 3.e.
Action 3.2: Do an open hole HFEC inspections of the torque bulkhead, midspar chord, drag fitting and front spar support for any crack in accordance with Paragraph 3.B., Work Instructions, Part 3.f., Part 3.g. and Part 3.i.
Action 3.3: Do a surface HFEC inspection of the front spar support for any crack in accordance with Paragraph 3.B., Work Instructions, Part 3.j.
-Before further flight.Action 3.4: Do an open hole HFEC inspection for any crack in the two forward most fastener holes common to the inboard side of the nacelle strut overwing support fitting and the wing front spar upper chord in accordance with Paragraph 3.B., Work Instructions, Part 6.
Any crack equal to or larger than 0.3 inch found during the inspections accomplished in accordance with Action 3.1.
-Before further flight.Install oversize fasteners in accordance with Paragraph 3.B., Work Instructions, Part 6.a.(1).
No crack is found during the inspections accomplished in accordance with Action 3.4.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 27, 1975 A3183Revision 6: February 07, 2014 25 of 106 BOEING SERVICE BULLETIN A3183
ALERTALERT
Table 3: Nacelle Strut # 1 and # 4 Midspar Fitting Life-Limit Program Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs First) ActionCondition -Before further flight.Action 3.5: Do an open hole HFEC inspection of the two forward most fastener holes common to the outboard side of the nacelle strut overwing support fitting and the wing front spar upper chord for any crack in accordance with Paragraph 3.B., Work Instructions, Part 6.a.(2).
Any crack found during the inspections accomplished in accordance with Action 3.4.
-Before further flight.Install oversize fasteners in accordance with Paragraph 3.B., Work Instructions, Part
6.a.(2)(a).
No crack is found during the inspections accomplished in accordance with Action 3.5.
-Before further flight.Contact Boeing for repair instructions and do the repair instructed by Boeing in accordance with Paragraph 3.B., Work Instructions, Part 6.a.(3).
Any crack found during the inspections accomplished in accordance with Action 3.4 or Action 3.5.
Or Install a new nacelle strut overwing support fitting in accordance with Paragraph 3.B., Work Instructions, Part 6.a.(3) and Boeing service bulletin 3173 (707-3173).
-Before further flight.Action 3.6: Oversize hole and do an open hole HFEC inspection in accordance with Paragraph 3.B., Work Instructions, Part 3.f.(1).
Any crack is found in a vacated torque bulkhead and midspar chord rivet hole during the inspections accomplished in accordance with Action 3.2.
-Before further flight.Oversize the crack free rivet holes and install new midspar fittings in accordance with Paragraph 3.B., Work Instructions, Part 3.f.(1)(a).
If the crack is removed by oversizing procedure accomplished in accordance with Action 3.6.
-Before further flight.Contact Boeing for repair instructions and new inboard and outboard midspar fitting installation instructions and do the work instructed by Boeing in accordance with Paragraph 3.B., Work Instructions, Part
3.f.(1)(b).
If the crack is not removed during the oversizing procedure accomplished in accordance with Action 3.6.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 27, 1975 A3183Revision 6: February 07, 2014 26 of 106 BOEING SERVICE BULLETIN A3183
ALERTALERT
Table 3: Nacelle Strut # 1 and # 4 Midspar Fitting Life-Limit Program Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs First) ActionCondition -Before further flight.Contact Boeing for repair instructions and new inboard and outboard midspar fitting installation instructions and do the work instructed by Boeing in accordance with Paragraph 3.B., Work Instructions, Part 3.f.(2).
Any crack is found in a vacated torque bulkhead and midspar chord bolt hole during the inspections accomplished in accordance with Action 3.2.
-Before further flight.Install new inboard and outboard midspar fittings and the existing torque bulkhead in accordance with Paragraph 3.B., Work Instructions, Part 3.f.(3).
No crack is found in the midspar chords or the torque bulkhead during the inspections accomplished in accordance with Action 3.2.
-Before further flight.Contact Boeing for repair instructions and do the repair instructed by Boeing in accordance with Paragraph 3.B., Work Instructions, Part 3.g.(1).
Any crack found in a drag fitting attachment hole during the inspections accomplished in accordance with Action 3.2.
-Before further flight.Install new bushings in accordance with Paragraph 3.B., Work Instructions, Part 3.g.(2).
No crack found in the drag fitting attachment holes during the inspections accomplished in accordance with Action 3.2.
-Before further flight.Install a new front spar support in accordance with Paragraph
3.B., Work Instructions, Part
3.i.(1), Part 3.j.(1) and Boeing service bulletin 3366 (707- 3366).
Any crack found in the front spar support during the inspections accomplished in accordance with Action 3.2 or Action
3.3.
(a) There is no terminating action for the repeat inspections.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 27, 1975 A3183Revision 6: February 07, 2014 27 of 106 BOEING SERVICE BULLETIN A3183
ALERTALERT
Table 4: Nacelle Strut # 2 and # 3 Midspar Fitting Life-Limit Program Mid Interval Inspection Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs First) ActionCondition
(a)Within 48 months from the last midspar fitting replacement.
Within 1,500 flight cycles from the last midspar fitting replacement.
Action 4.1: Do a detailed inspection and a surface High Frequency Eddy Current (HFEC) inspection of the inboard and outboard midspar fittings for any crack in accordance with Paragraph
3.B., Work Instructions, Part 4.c.
All airplanes.
Action 4.2: Do an open hole HFEC inspections of the drag fitting and front spar support for any crack in accordance with Paragraph 3.B., Work Instructions, Part 4.d. and Part 4.f.
Action 4.3: Do a surface HFEC inspection of the front spar support for any crack in accordance with Paragraph 3.B., Work Instructions, Part 4.g.
-Before further flight.Remove the inboard and outboard midspar fittings in accordance with Paragraph 3.B., Work Instructions, Part
4.c.(1)(b).
Any crack found during the inspections accomplished in accordance with Action 4.1.
-Before further flight.Action 4.4: Do an open hole HFEC inspection of the fastener holes in the midspar chords and torque bulkhead for any crack in accordance with Paragraph
3.B., Work Instructions, Part
4.c.(1)(c).
-Before further flight.Action 4.5: Do an open hole HFEC inspection for any crack in the two forward most fastener holes common to the inboard side of the nacelle strut overwing support fitting and the wing front spar upper chord in accordance with Paragraph 3.B., Work Instructions, Part 6.
Any crack equal to or larger than 0.3 inch found during the inspections accomplished in accordance with Action 4.1.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 27, 1975 A3183Revision 6: February 07, 2014 28 of 106 BOEING SERVICE BULLETIN A3183
ALERTALERT
Table 4: Nacelle Strut # 2 and # 3 Midspar Fitting Life-Limit Program Mid Interval Inspection Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs First) ActionCondition -Before further flight.Action 4.6: Oversize the hole and do an open hole HFEC inspection in accordance with Paragraph 3.B., Work Instructions, Part 4.c.(1)(c)1).
Any crack found in a vacated torque bulkhead and midspar chord rivet hole during the inspections accomplished in accordance with Action 4.4.
-Before further flight.Oversize the crack free rivet holes and install new midspar fittings in accordance with Paragraph 3.B., Work Instructions, Part 4.c.(1)(c)1)a).
If the crack is removed by oversizing procedure accomplished in accordance with Action 4.6.
-Before further flight.Contact Boeing for repair instructions and new inboard and outboard midspar fitting installation instructions and do the work instructed by Boeing in accordance with Paragraph 3.B., Work Instructions, Part
4.c.(1)(c)1)b).
If the crack is not removed during the oversizing procedure accomplished in accordance with Action 4.6.
-Before further flight.Contact Boeing for repair instructions and new inboard and outboard midspar fitting installation instructions and do the work instructed by Boeing in accordance with Paragraph 3.B., Work Instructions, Part
4.c.(1)(c)2).
Any crack found in a torque bulkhead and midspar chord bolt hole accomplished in accordance with Action 4.4.
-Before further flight.Install the torque bulkhead and new inboard and outboard midspar fittings in accordance with Paragraph 3.B., Work Instructions, Part 4.c.(1)(c)3).
No crack is found in the midspar chords or the torque bulkhead accomplished in accordance with Action 4.4.
-Before further flight.Install oversize fasteners in accordance with Paragraph 3.B., Work Instructions, Part 6.a.(1).
No crack is found during the inspections accomplished in accordance with Action 4.5.
-Before further flight.Action 4.7: Do an open hole HFEC inspection of the two forward most fastener holes common to the outboard side of the nacelle strut overwing support fitting and the wing front spar upper chord for any crack in accordance with Paragraph 3.B., Work Instructions, Part 6.a.(2).
Any crack found during the inspections accomplished in accordance with Action 4.5.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 27, 1975 A3183Revision 6: February 07, 2014 29 of 106 BOEING SERVICE BULLETIN A3183
ALERTALERT
Table 4: Nacelle Strut # 2 and # 3 Midspar Fitting Life-Limit Program Mid Interval Inspection Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs First) ActionCondition -Before further flight.Install oversize fasteners in accordance with Paragraph 3.B., Work Instructions, Part
6.a.(2)(a).
No crack is found during the inspections accomplished in accordance with Action 4.7.
-Before further flight.Contact Boeing for repair instructions and do the repair instructed by Boeing in accordance with Paragraph 3.B., Work Instructions, Part 6.a.(3).
Any crack found during the inspections accomplished in accordance with Action 4.5 and Action 4.7.
Or Install a new nacelle strut overwing support fitting in accordance with Paragraph 3.B., Work Instructions, Part 6.a.(3) and Boeing service bulletin 3173 (707-3173).
-Before further flight.Contact Boeing for repair instructions and do the repair instructed by Boeing in accordance with Paragraph 3.B., Work Instructions, Part 4.d.(1).
Any crack is found in a drag fitting attachment hole during the inspections accomplished in accordance with Action 4.2.
-Before further flight.Install new bushings in accordance with Paragraph 3.B., Work Instructions, Part 4.d.(2).
No crack found in the drag fitting attachment holes during the inspections accomplished in accordance with Action 4.2.
-Before further flight.Install a new front spar support in accordance with Paragraph
3.B., Work Instructions, Part
4.f.(1), Part 4.g.(1) and Boeing service bulletin 3366 (707- 3366).
Any crack is found in the front spar support during the inspections accomplished in accordance with Action 4.2 and Action 4.3.
(a) New midspar fittings are installed after accomplishment of the inspections given in Table 2. After installation of the new midspar fittings, the mid interval inspection compliance time becomes applicable once more.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 27, 1975 A3183Revision 6: February 07, 2014 30 of 106 BOEING SERVICE BULLETIN A3183
ALERTALERT
Table 5: Nacelle Strut # 1 and # 4 Midspar Fitting Life-Limit Program Mid Interval Inspection Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs First) ActionCondition
(a)Within 48 months from the last midspar fitting replacement.
Within 1,500 flight cycles from the last midspar fitting replacement.
Action 5.1: Do a detailed inspection and a surface High Frequency Eddy Current (HFEC) inspection of the inboard and outboard midspar fittings for any crack in accordance with Paragraph
3.B., Work Instructions, Part 5.c.
All airplanes.
Action 5.2: Do an open hole HFEC inspections of the drag fitting and front spar support for any crack in accordance with Paragraph 3.B., Work Instructions, Part 5.d. and Part 5.f.
Action 5.3: Do a surface HFEC inspection of the front spar support for any crack in accordance with Paragraph 3.B., Work Instructions, Part 5.g.
-Before further flight.Remove the inboard and outboard midspar fittings in accordance with Paragraph 3.B., Work Instructions, Part
5.c.(1)(b).
Any crack found during the inspections accomplished in accordance with Action 5.1.
-Before further flight.Action 5.4: Do an open hole HFEC inspection of the fastener holes in the midspar chords and torque bulkhead for any crack in accordance with Paragraph
3.B., Work Instructions, Part
5.c.(1)(c).
-Before further flight.
Action 5.5: Do an open hole HFEC inspection for any crack in the two forward most fastener holes common to the inboard side of the nacelle strut overwing support fitting and the wing front spar upper chord in accordance with Paragraph 3.B., Work Instructions, Part 6.
Any crack equal to or larger than 0.3 inch found during the inspections accomplished in accordance with Action 5.1.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 27, 1975 A3183Revision 6: February 07, 2014 31 of 106 BOEING SERVICE BULLETIN A3183
ALERTALERT
Table 5: Nacelle Strut # 1 and # 4 Midspar Fitting Life-Limit Program Mid Interval Inspection Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs First) ActionCondition -Before further flight.Action 5.6: Oversize the hole and do an open hole HFEC inspection in accordance with Paragraph 3.B., Work Instructions, Part 5.c.(1)(c)1).
Any crack found in a vacated torque bulkhead and midspar chord rivet hole during the inspections accomplished in accordance with Action 5.4.
-Before further flight.Oversize the crack free rivet holes and install new midspar fittings in accordance with Paragraph 3.B., Work Instructions, Part 5.c.(1)(c)1)a).
If the crack is removed by oversizing procedure accomplished in accordance with Action 5.6.
-Before further flight.Contact Boeing for repair instructions and new inboard and outboard midspar fitting installation instructions and do the work instructed by Boeing in accordance with Paragraph 3.B., Work Instructions, Part
5.c.(1)(c)1)b).
If the crack is not removed during the oversizing procedure accomplished in accordance with Action 5.6 -Before further flight.Contact Boeing for repair instructions and new inboard and outboard midspar fitting installation instructions and do the work instructed by Boeing in accordance with Paragraph 3.B., Work Instructions, Part
5.c.(1)(c)2).
Any crack found in a torque bulkhead and midspar chord bolt hole during the inspections accomplished in accordance with Action 5.4.
-Before further flight.Install the torque bulkhead and new inboard and outboard midspar fittings in accordance with Paragraph 3.B., Work Instructions, Part 5.c.(1)(c)3).
No crack is found in the midspar chords or the torque bulkhead during the inspections accomplished in accordance with Action 5.4.
-Before further flight.Install oversize fasteners in accordance with Paragraph 3.B., Work Instructions, Part 6.a.(1).
No crack is found during the inspections accomplished in accordance with Action 5.5.
-Before further flight.Action 5.7: Do an open hole HFEC inspection of the two forward most fastener holes common to the outboard side of the nacelle strut overwing support fitting and the wing front spar upper chord for any crack in accordance with Paragraph 3.B., Work Instructions, Part 6.a.(2).
Any crack found during the inspections accomplished in accordance with Action 5.5.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 27, 1975 A3183Revision 6: February 07, 2014 32 of 106 BOEING SERVICE BULLETIN A3183
ALERTALERT
Table 5: Nacelle Strut # 1 and # 4 Midspar Fitting Life-Limit Program Mid Interval Inspection Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs First) ActionCondition -Before further flight.Install oversize fasteners in accordance with Paragraph 3.B., Work Instructions, Part
6.a.(2)(a).
No crack is found during the inspections accomplished in accordance with Action 5.7.
-Before further flight.Contact Boeing for repair instructions and do the repair instructed by Boeing in accordance with Paragraph 3.B., Work Instructions, Part 6.a.(3).
Any crack found during the inspections accomplished in accordance with Action 5.5 and Action 5.7.
Or Install a new nacelle strut overwing support fitting in accordance with Paragraph 3.B., Work Instructions, Part 6.a.(3) and Boeing service bulletin 3173 (707-3173).
-Before further flight.Contact Boeing for repair instructions and do the repair instructed by Boeing in accordance with Paragraph 3.B., Work Instructions, Part 5.d.(1).
Any crack is found in a drag fitting attachment hole during the inspections accomplished in accordance with Action 5.2.
-Before further flight.Install new bushings in accordance with Paragraph 3.B., Work Instructions, Part 5.d.(2).
No crack found in the drag fitting attachment holes during the inspections accomplished in accordance with Action 5.2.
-Before further flight.Install a new front spar support in accordance with Paragraph
3.B., Work Instructions, Part
5.f.(1), Part 5.g.(1) and Boeing service bulletin 3366 (707- 3366).
Any crack is found in the front spar support during the inspections accomplished in accordance with Action 5.2 and Action 5.3.
(a) New midspar fittings are installed after accomplishment of the inspections given in Table 3. After installation of the new midspar fittings, the mid interval inspection compliance time becomes applicable once more.
F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 27, 1975 A3183Revision 6: February 07, 2014 33 of 106 BOEING SERVICE BULLETIN A3183
ALERTALERT
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.
This service bulletin has been approved by the Federal Aviation Administration (FAA). In addition, the Manager of the FAA Seattle Aircraft Certification Office approves replacement of the midspar fittings on the inboard nacelle struts in accordance with Service Bulletin A3183, Revision 6 as an AMOC to the replacement of the midspar fittings specified in paragraph (e) of AD 93-11-02. All provisions of AD 93-11-02 that are not specifically referenced in the above statement remain fully applicable and must be complied with accordingly.
In addition, the Manager of the FAA Seattle Aircraft Certification Office approves accomplishment of the mid-interval inspections specified in Table 4 of paragraph 1.E., Compliance, of Service Bulletin A3183, Revision 6, as an AMOC to the next inspection required by paragraph (h) of AD 2012-16-12 provided the mid-interval inspections are accomplished within 1,500 flight cycles or 48 months from the last midspar fitting replacement, whichever occurs first. The repetitive inspections must continue thereafter as specified in paragraph (h) of AD 2012-16-12. All provisions of AD 2012-16-12 that are not specifically referenced in the above statement remain fully applicable and must be complied with accordingly.
G. Manpower Approximately 260 man-hours and two persons are necessary to do this inspection and replacement for each airplane.
Man hour savings resulting from common access may be gained by concurrent accomplishment of Boeing service bulletin 2313 (707-2313), "Nacelle Strut Forward Drag Support Fitting Replacement and Midspar Bushing Installation", Boeing service bulletin 2958 (707-2958), "Nacelle Strut Spar Chord Modification", and Boeing service bulletin 3173 (707-3173), "Inboard Nacelle Strut Overwing Support Fitting Modification and Replacement" on commonly affected airplanes.
The tables below shows an estimate of the task hours necessary to do the inspection and replacement for each midspar fitting. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task hour data if necessary. The estimate does not include lost time. These are some examples of lost time:
Time to adjust to the workplace Time to schedule the work Time to inspect the work Time to cure the materials Time to make the parts Time to find the tools.
TABLE 1 : ENGINE NUMBER (#)1, # 2, # 3 AND # 4 NACELLE STRUT INSPECTION Elapsed HoursTask HoursNumber of PersonsTask
0.400.401General Visual inspection
0.400.401Side Force Inspection Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 27, 1975 A3183Revision 6: February 07, 2014 34 of 106 BOEING SERVICE BULLETIN A3183
ALERTALERT
TABLE 1 : ENGINE NUMBER (#)1, # 2, # 3 AND # 4 NACELLE STRUT INSPECTION Elapsed HoursTask HoursNumber of PersonsTask
0.800.80TOTAL FOR EACH AIRPLANE TABLE 2: NACELLE STRUT #1, # 2, #3 AND # 4 MIDSPAR FITTING LIFE-LIMIT PROGRAM Elapsed HoursTask HoursNumber of PersonsTask
6.0048.008Open Access
4.5018.004Midspar Fitting Removal
2.004.002FIGURE 3
10.6021.202FIGURE 4
4.108.202FIGURE 5
2.004.002FIGURE 6
10.6021.202FIGURE 7
4.108.202FIGURE 8
4.5018.004Midspar Fitting Installation
6.0048.008Close Access
2.008.004Test
56.40 (a)206.80 (a)TOTAL FOR EACH AIRPLANE
(a) The estimated task hours do not include time to make repairs.
TABLE 3: NACELLE STRUT #1, # 2, #3 AND # 4 MIDSPAR FITTING LIFE-LIMIT PROGRAM
MID INTERVAL INSPECTION Elapsed HoursTask HoursNumber of PersonsTask
6.0048.008Open Access
10.6021.202FIGURE 4 (a)
4.108.202FIGURE 5
10.6021.202FIGURE 7 (a)
4.108.202FIGURE 8
2.004.002FIGURE 9
2.004.002FIGURE 10
6.0048.008Close Access
2.008.004Test
26.20 (b)(c)128.40 (b) (c)TOTAL FOR EACH AIRPLANE Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 27, 1975 A3183Revision 6: February 07, 2014 35 of 106 BOEING SERVICE BULLETIN A3183
ALERTALERT
TABLE 3: NACELLE STRUT #1, # 2, #3 AND # 4 MIDSPAR FITTING LIFE-LIMIT PROGRAM
MID INTERVAL INSPECTION Elapsed HoursTask HoursNumber of PersonsTask
(a) This task is only required if a crack is found in a midspar fitting.
(b) The estimated task hours do not include time for midspar fitting installation or repairs.
(c) The estimated task hours do not include time for the inspection of the torque bulkhead and midspar chords of the nacelle strut.
TABLE 4: OVERWING SUPPORT FITTING INSPECTION Elapsed HoursTask HoursNumber of PersonsTask
2.202.201FIGURE 11
2.802.801FIGURE 12
2.202.201FIGURE 13
7.207.20TOTAL FOR EACH AIRPLANE H. Weight and Balance Changes Change in Moment (Pound-Inches) Change in Weight (Pounds)Airplane + 836+ 1.0707 I. Electrical Load Data Not applicable.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 18114-RS, PRR 17941
b. 707 Maintenance Manual Subjects 12-3-1, 71-5-0, 54-01-0
c. Standard Overhaul Practices Manual (SOPM) 20-30-03, 20-43-03, 20-50-03, 20-50-10, 20-50-19
d. Boeing service bulletin 2313 (707-2313), "Nacelle Strut Forward Drag Support Fitting Replacement and Bushing Installation"
e. Boeing service bulletin 2958 (707-2958), "Nacelle Strut Spar Chord Modification"
f. Boeing service bulletin 3173 (707-3173), "Inboard Nacelle Strut Overwing Support Fitting Modification and Replacement" Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 27, 1975 A3183Revision 6: February 07, 2014 36 of 106 BOEING SERVICE BULLETIN A3183