TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'a3763420a40cc7cb3ff4762b1824a1e545fdda0d472971838c569e764e17428d' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'a3763420a40cc7cb3ff4762b1824a1e545fdda0d472971838c569e764e17428d' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Table 1 Airplanes with flat aft pressure bulkhead having less than 24,000 total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition ..Before further flightInstall full length improvement modification.
Option 4 AND 10,000 flight cycles .15,000 flight cycles from full length modification installation Do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c) Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2004 DC8-53A080Revision 2: September 18, 2013 25 of 86 BOEING SERVICE BULLETIN DC8-53A080
ALERTALERT
Table 1 Airplanes with flat aft pressure bulkhead having less than 24,000 total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition ..Before further flightDo local skin repair.Condition 3 Any Crack(s) Found in Skin AND 2,000 flight cycles .2,000 flight cyclesDo a general visual and Eddy Current High Frequency (ETHF) Inspection of the accessible fuselage skin and fasteners at longeron 28 forward of flat aft pressure bulkhead, left and right sides and do the work listed based on condition of the unrepaired areas Option 1
(a) (b) AND 5,000 flight cycles from initial inspection .15,000 flight cycles from installation of repair For local skin repairs 12 inches or less long, do an external visual inspections for cracks along all four edges of the external doublers
(a) (c) AND/OR 10,000 flight cycles from initial inspection .15,000 flight cycles from installation of repair For skin repairs longer than 12 inches, do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c) AND .6 years from the issue date of Revision 1 of this service bulletin Accumulation of 45,400 total flight cycles Install full length repair with finger doublers.
AND 5,000 flight cycles .30,000 flight cycles from full length repair with finger doublers repair installation Do an external visual inspections for cracks along all four edges of the external doublers, left and right sides.
(a) (c) OR Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2004 DC8-53A080Revision 2: September 18, 2013 26 of 86 BOEING SERVICE BULLETIN DC8-53A080
ALERTALERT
Table 1 Airplanes with flat aft pressure bulkhead having less than 24,000 total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition ..Before further flightDo local skin repair.Option 2 AND 2,000 flight cycles .2,000 flight cyclesDo a general visual and Eddy Current High Frequency (ETHF) Inspection of the accessible fuselage skin and fasteners at longeron 28 forward of flat aft pressure bulkhead, left and right sides and do the work listed based on condition of the unrepaired areas
(a) (b) AND AND 5,000 flight cycles from initial inspection .15,000 flight cycles from installation of repair For local skin repairs 12 inches or less long, do an external visual inspections for cracks along all four edges of the external doublers
(a) (c) AND/OR 10,000 flight cycles from initial inspection .15,000 flight cycles from installation of repair For skin repairs longer than 12 inches, do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c) AND .6 years from the issue date of Revision 1 of this service bulletin Accumulation of 45,400 total flight cycles Install full length repair doublers.
AND 10,000 flight cycles .15,000 flight cycles from full length repair installation Do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c) OR Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2004 DC8-53A080Revision 2: September 18, 2013 27 of 86 BOEING SERVICE BULLETIN DC8-53A080
ALERTALERT
Table 1 Airplanes with flat aft pressure bulkhead having less than 24,000 total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition ..Before further flightInstall full length repair with finger doublers.
Option 3 AND 5,000 flight cycles .30,000 flight cycles from full length repair with finger doublers installation Do an external visual inspections for cracks along all four edges of the external doublers, left and right sides.
(a) (c) OR ..Before further flightInstall full length repair doublers.
Option 4 AND 10,000 flight cycles .15,000 flight cycles from full length repair installation Do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c)
(a) Repeat inspection at noted interval if no discrepancies are found.
(b) If any discrepancy is found, do the work of Condition 2 or 3 as applicable before further flight.
(c) If any discrepancy is found, contact Boeing and do the work required before further flight.
Table 2 Airplanes with flat aft pressure bulkhead having 24,000 or more total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition .1 year from original issue date of this service bulletin Do a general visual and Eddy Current High Frequency (ETHF) Inspection of the fuselage skin and fasteners at longeron 28 forward of flat aft pressure bulkhead, left and right sides and do the work listed based on condition Airplanes with flat aft pressure bulkhead having 24,000 or more total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2004 DC8-53A080Revision 2: September 18, 2013 28 of 86 BOEING SERVICE BULLETIN DC8-53A080
ALERTALERT
Table 2 Airplanes with flat aft pressure bulkhead having 24,000 or more total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition 2,000 flight cycles .2,000 flight cyclesDo a general visual and Eddy Current High Frequency (ETHF) Inspection of the fuselage skin and fasteners at longeron 28 forward of flat aft pressure bulkhead, left and right sides and do the work listed based on condition Condition 1 (No Crack(s) or Failed Fasteners Found) Option 1
(a) (b) AND .6 years from the issue date of Revision 1 of this service bulletin Accumulation of 45,400 total flight cycles Install full length improvement modification with finger doublers.
AND 5,000 flight cycles .30,000 flight cycles from full length improvement modification with finger doublers installation Do an external visual inspections for cracks along all four edges of the external doublers, left and right sides.
(a) (c) OR 2,000 flight cycles .2,000 flight cyclesDo a general visual and Eddy Current High Frequency (ETHF) Inspection of the fuselage skin and fasteners at longeron 28 forward of flat aft pressure bulkhead, left and right sides and do the work listed based on condition Option 2
(a) (b) AND .6 years from the issue date of Revision 1 of this service bulletin Accumulation of 45,400 total flight cycles Install full length improvement modification AND 10,000 flight cycles .15,000 flight cycles from full length modification installation Do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c) Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2004 DC8-53A080Revision 2: September 18, 2013 29 of 86 BOEING SERVICE BULLETIN DC8-53A080
ALERTALERT
Table 2 Airplanes with flat aft pressure bulkhead having 24,000 or more total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition ..Before further flightReplace all Failed Fasteners.Condition 2 Any Failed Fastener(s) AND 2,000 flight cycles .2,000 flight cyclesDo a general visual and Eddy Current High Frequency (ETHF) Inspection of the fuselage skin and fasteners at longeron 28 forward of flat aft pressure bulkhead, left and right sides and do the work listed based on Condition Option 1
(a) (b) AND .6 years from the issue date of Revision 1 of this service bulletin Accumulation of 45,400 total flight cycles Install full length improvement modification with finger doublers.
AND 5,000 flight cycles .30,000 flight cycles from full length improvement modification with finger doublers installation Do an external visual inspections for cracks along all four edges of the external doublers, left and right sides.
(a) (c) OR Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2004 DC8-53A080Revision 2: September 18, 2013 30 of 86 BOEING SERVICE BULLETIN DC8-53A080
ALERTALERT
Table 2 Airplanes with flat aft pressure bulkhead having 24,000 or more total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition Before further flightReplace all Failed Fasteners.Option 2 AND 2,000 flight cycles .2,000 flight cyclesDo a general visual and Eddy Current High Frequency (ETHF) Inspection of the fuselage skin and fasteners at longeron 28 forward of flat aft pressure bulkhead, left and right sides and do the work listed based on Condition
(a) (b) AND .6 years from the issue date of Revision 1 of this service bulletin Accumulation of 45,400 total flight cycles Install full length improvement modification.
AND 10,000 flight cycles 15,000 flight cycles from full length modification installation Do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c) OR ..Before further flightInstall full length improvement modification with finger doublers.
Option 3 AND 5,000 flight cycles .30,000 flight cycles from full length improvement modification with finger doublers installation Do an external visual inspections for cracks along all four edges of the external doublers, left and right sides.
(a) (c) OR Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2004 DC8-53A080Revision 2: September 18, 2013 31 of 86 BOEING SERVICE BULLETIN DC8-53A080
ALERTALERT
Table 2 Airplanes with flat aft pressure bulkhead having 24,000 or more total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition ..Before further flightInstall full length improvement modification.
Option 4 AND 10,000 flight cycles .15,000 flight cycles from full length modification installation Do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c) Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2004 DC8-53A080Revision 2: September 18, 2013 32 of 86 BOEING SERVICE BULLETIN DC8-53A080
ALERTALERT
Table 2 Airplanes with flat aft pressure bulkhead having 24,000 or more total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition ..Before further flightDo local skin repair.Condition 3 Any Crack(s) Found in Skin AND 2,000 flight cycles .2,000 flight cyclesDo a general visual and Eddy Current High Frequency (ETHF) Inspection of the accessible fuselage skin and fasteners at longeron 28 forward of flat aft pressure bulkhead, left and right sides and do the work listed based on condition of the unrepaired areas Option 1
(a) (b) AND 5,000 flight cycles from initial inspection .15,000 flight cycles from installation of repair For local skin repairs 12 inches or less long, do an external visual inspections for cracks along all four edges of the external doublers
(a) (c) AND/OR 10,000 flight cycles from initial inspection .15,000 flight cycles from installation of repair For skin repairs longer than 12 inches, do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c) AND .6 years from the issue date of Revision 1 of this service bulletin Accumulation of 45,400 total flight cycles Install full length repair with finger doublers.
AND 5,000 flight cycles .30,000 flight cycles from full length repair with finger doublers repair installation Do an external visual inspections for cracks along all four edges of the external doublers, left and right sides.
(a) (c) OR Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2004 DC8-53A080Revision 2: September 18, 2013 33 of 86 BOEING SERVICE BULLETIN DC8-53A080
ALERTALERT
Table 2 Airplanes with flat aft pressure bulkhead having 24,000 or more total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition ..Before further flightDo local skin repair.Option 2 AND 2,000 flight cycles .2,000 flight cyclesDo a general visual and Eddy Current High Frequency (ETHF) Inspection of the accessible fuselage skin and fasteners at longeron 28 forward of flat aft pressure bulkhead, left and right sides and do the work listed based on condition of the unrepaired areas
(a) (b) AND 5,000 flight cycles from initial inspection .15,000 flight cycles from installation of repair For local skin repairs 12 inches or less long, do an external visual inspections for cracks along all four edges of the external doublers
(a) (c) AND/OR 10,000 flight cycles from initial inspection .15,000 flight cycles from installation of repair For skin repairs longer than 12 inches, do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c) AND .6 years from the issue date of Revision 1 of this service bulletin Accumulation of 45,400 total flight cycles Install full length repair doublers.
AND 10,000 flight cycles .15,000 flight cycles from full length repair installation Do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c) OR Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2004 DC8-53A080Revision 2: September 18, 2013 34 of 86 BOEING SERVICE BULLETIN DC8-53A080
ALERTALERT
Table 2 Airplanes with flat aft pressure bulkhead having 24,000 or more total flight cycles as of the original issue date of this service bulletin and no skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition .Before further flightInstall full length repair with finger doublers.
Option 3 AND 5,000 flight cycles .30,000 flight cycles from full length repair with finger doublers installation Do an external visual inspections for cracks along all four edges of the external doublers, left and right sides.
(a) (c) OR .Before further flightInstall full length repair doublers.
Option 4 AND 10,000 flight cycles .15,000 flight cycles from full length repair installation Do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c)
(a) Repeat inspection at noted interval if no discrepancies are found.
(b) If any discrepancy is found, do the work of Condition 2 or 3 as applicable before further flight.
(c) If any discrepancy is found, contact Boeing and do the work required before further flight.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2004 DC8-53A080Revision 2: September 18, 2013 35 of 86 BOEING SERVICE BULLETIN DC8-53A080
ALERTALERT
Table 3 Airplanes with flat aft pressure bulkhead having less than 24,000 total flight cycles as of the original issue date of this service bulletin and having skin repairs in the area of inspection:
Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition .2 years from original issue date of this service bulletin Accumulation of 24,000 total flight cycles Do a general visual and Eddy Current High Frequency (ETHF) Inspection of the accessible fuselage skin and fasteners at longeron 28 forward of flat aft pressure bulkhead, left and right sides and do the work listed based on condition.
Airplanes with flat aft pressure bulkhead having less than 24,000 total flight cycles as of the original issue date of this service bulletin and having skin repairs in the area of inspection.
2,000 flight cycles .2,000 flight cyclesDo a general visual and Eddy Current High Frequency (ETHF) Inspection of the accessible fuselage skin and fasteners at longeron 28 forward of flat aft pressure bulkhead, left and right sides Condition 1 (No Crack(s) or Failed Fasteners Found) Option 1
(a) (b) AND .6 years from the issue date of Revision 1 of this service bulletin Accumulation of 45,400 total flight cycles Install full length improvement modification with finger doublers.
AND .2 years from initial inspection of accessible skin .Remove previously installed local repairs and replace them with new local repairs.
AND 5,000 flight cycles from initial inspection .15,000 flight cycles from installation of repair For new local skin repairs 12 inches or less long, do an external visual inspections for cracks along all four edges of the external doublers
(a) (c) AND/OR 10,000 flight cycles from initial inspection .15,000 flight cycles from installation of repair For new skin repairs longer than 12 inches, do a Low Frequency Eddy Current inspection of the fuselage skin along all four edges of the external doubler
(a) (c) Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2004 DC8-53A080Revision 2: September 18, 2013 36 of 86 BOEING SERVICE BULLETIN DC8-53A080