Supplemental type certificates
49,117 STCs, most recently changed first. Search by what an STC changes, its holder or a model.
Query with SQL
duckdb -csv -c "SELECT stc_number, description, holder, status, status_date FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' ORDER BY status_date DESC NULLS LAST, stc_number"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT stc_number, description, holder, status, status_date FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' ORDER BY status_date DESC NULLS LAST, stc_number
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
STC SB03249CHReplace the Cameron Balloons US burner with Cameron Ltd./Thunder & Colt Stratus double burnerSTC SB03250CHReplace the Cameron Balloons US burner with Cameron Ltd./Thunder & Colt Stratus triple burnerSTC ST10914SCReconfiguration of a Cabin InteriorSTC ST11146SCInterior reconfiguration of 30 seats and passenger service unitsSTC SA01719WIInstallation of Aircell ATG 5000 with Aircell Axxess CTR Installation and Activation of WI-FI Provisions and Transmitting Portable Electronic Devices (T-PED) Aircraft Tolerance TestingSTC ST03234CHReconfiguration of Cabin Floorplan ArrangementSTC ST01318WI-DSoftware Upgrade to -218-218 of the Honeywell MK V Enhanced Ground Proximity Warning System (EGPWS).STC SH2139SOInstallation of crew vertical slide window assemblies.STC SH2201SOInstallation of replacement nitrogen cylinder assemblies for emergency flotation systems.STC SH2289SOInstallation of a replacement landing light cover.STC SH2292SOInstallation of a dual video camera system and monitor.STC SH2293SOInstallation of rappelling fixture kit.STC SH2342SOInstallation of FLIR monitor mount in cabin.STC SH2347SOInstallation of Spectrolab Starburst SX-5 searchlight.STC SH2365SOInstallation of a vertical sliding window on passenger door.STC SH2458SOInstallation of FLIR Systems, Inc., Model 2000/2500 Series Thermal Imager SystemSTC SH2544SOInstallation of FLIR monitor mount.STC SH2545SOInstallation of aft passenger seat shoulder harness/lap belt assembly.STC SH2616SOInstallation of a lower console assembly, P/N 206-882.STC SH2751SOInstallation of a passenger shoulder harness restraint system.STC SH2764SO-DLow skid landing gear.STC SH2800SOInstallation of a forward quick-mount kit for an ISTEC/WESCAM 104/12 camera.STC SH2801SOInstallation of a forward quick-mount kit for an inframetrics IRTV-445G FLIR.STC SH2804SO-DHigh Skid Landing Gear.STC SH2808SOInstallation of a Grames retractable landing light.STC SH2820SOReplacement of an emergency floatation supply bottle.STC SH2889SWFuel filler neck.STC SH2926SOInstallation of an Inframetrics Model IRTV-445 FLIR on a forward quick mount kit.STC SH2927SOInstallation of an Istec/Wescam Model 104/12 camera on a forward quick mount kit.STC SH2941SO-DLow skid landing gear.STC SH2976SOReplacement and installation of skid gear cross tubes for emergency floatation systems BHT P/N 206-706-067-3 or 206-706-067-101.STC SR03245CHInstallation of the Appareo Data Storage Unit (DSU) SystemSTC SR02405LAInstallation of an emergency life raftSTC SR09639RCInstallation of a Thommen Air Data DisplaySTC SA03315NYInstallation of Model MTV-27-1-E-C-F-R(G)/CFR210-58d 5-bladed, full feathering composite propellersSTC SA4951NMInstallation of spoilers.STC SR01632NYInstallation of Airframe Mounted Fuel FilterSTC ST03314NYInstallation of Seat Electronics Boxes (SEB) (Panasonic eX2) on to modified existing Avio business class seats and remove existing Zone Terminators (ZT)STC SA00635WIJump seat installation.STC SE7582SWGrinding of high compression NITRIDED Cylinders to .010 oversize, as an alternative to chrome plating or rebarreling, and the installation of SL10207 P10 Piston, SL74241 P10 Top and second compression ring, and SL 73857 P10 oil control ringSTC SR03316NYInstallation of BearpawsSTC SR09566RCInstallation of Night Vision Goggle Compatible Lighting SystemSTC ST01825LAInstallation of cabin interior noise reduction kit.STC SB03244CHReplace Balony Kubicek Basket/Burner system and fuel tanks with the Aerostar International Basket Model RB8, S/N 106; the Aerostar International Burner Model HP III Dual, S/N 3315; Aerostar International Model V-23 Fuel Tank, S/Ns 10164, 3020, and 3023.STC ST02470LAInterior reconfigurationSTC ST03764AT-DInstallation f a Cabin Telecommunication Router (CTR) Wireless Local Area Network (WLAN)STC SA03893ATInstallation of MT-Propeller Model MTV-27-1-E-C-F-R(G)/CFRL250-103STC SA03893AT`Installation of MT-Propeller Model MTV-27-1-E-C-F-R(G)/CFRL250-103STC SB03242CHReplace the Lindstrand Balloons Ltd Burner system with the Cameron Balloons Triple Burner, Part Number CB2081-2, S/N B5216, B5217, B5298. Replace the Lindstrand Balloons Ltd fuel tanks with the Cameron Balloons Fuel Tanks, Part Number CBUS426D, S/N 3159, Part Number CBUS1050D, S/N 230346, and Part Number CBUS1060A, S/Ns 50085 and 50089.STC SB03243CHReplace the Cameron Balloons Ltd Basket with the Lindstrand Balloons Basket, Part Number BA-026-A-001, S/N BA1200. Replace the Cameron Balloons Ltd fuel tanks with the Lindstrand Balloons Fuel Tanks, Part Number CY-040-A-001, S/Ns 970, 971, 972 and 973.