TCDS A2NM
Airworthiness directives · 365
ADs whose products are models on this data sheet, matched by model and maker. Those in force first, newest first.
Query with SQL
duckdb -csv -c "SELECT d.ad_number, d.status, d.subject, d.effective_date FROM 'https://openairdocs.org/data/latest/faa_directive.parquet' d WHERE d.ad_id IN (SELECT ad_id FROM 'https://openairdocs.org/data/latest/faa_directive_product.parquet' WHERE tcds_number = 'A2NM') ORDER BY d.status = 'Historical', coalesce(d.effective_date, d.publication_date) DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT d.ad_number, d.status, d.subject, d.effective_date FROM 'https://openairdocs.org/data/latest/faa_directive.parquet' d WHERE d.ad_id IN (SELECT ad_id FROM 'https://openairdocs.org/data/latest/faa_directive_product.parquet' WHERE tcds_number = 'A2NM') ORDER BY d.status = 'Historical', coalesce(d.effective_date, d.publication_date) DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
AD 2009-21-10 R1OxygenAD 2009-26-03Electrical power.AD 2009-12-03Right recirculation fanAD 2009-06-20Electrical bond resistanceAD 2008-25-08Fuel boost pumpAD 2008-22-08Water composite drain mastsAD 2008-23-09Insulation blanketAD 2008-22-01Auxiliary fuel tanksAD 2008-11-07Center tank fuel boost pumpsAD 2008-08-08Oxygen masks in the passenger service unitsAD 2008-08-12Thermal anti-ice (TAI) systemAD 2008-06-14Disbonded tear strapsAD 2008-06-03Fuel tanksAD 2008-02-14Lighted pushbutton switchesAD 2007-26-02Detect and correct cracking of the tee clipsAD 2007-23-08ELMS (electrical load management system)AD 2007-19-07Fuselage skinAD 2007-16-12Circuit breakersAD 2007-10-12Reinforced flight deck doorAD 2007-07-02Chemical oxygen generatorAD 2006-26-13Attachment of the shoulder restraint harnessAD 2006-23-15Control wheel damper assemblyAD 2006-22-01Girt bar leaf springsAD 2006-13-03Reworking the spar bonding path and reapplying sealantAD 2006-13-17Auxiliary fuel systemAD 2006-12-06Spiral wire wrapping of the electrical cables of the galleys and closetsAD 2006-07-21Nacelle strutsAD 2006-07-23Power control units (PCUs)AD 2006-07-24Flight deckAD 2006-09-02Strut fitting and the forward engine mount assemblyAD 2006-04-14Overhead distribution ductsAD 2005-22-07Auxiliary power unit (APU) battery and the APU start transformer
rectifier unit (TRU)AD 2005-20-40Trailing edge flap transmission assemblyAD 2005-20-41Nacelle strutsAD 2005-18-09Pegasus flight management computer (FMC) systemAD 2005-17-09Drip shieldsAD 2005-15-15Upper link forward fuse pinsAD 2005-12-18Horizontal stabilizer trim actuator (HSTA)AD 2005-12-11Closet assembly and forward purser work stationAD 2005-07-08Trailing edge wedges on certain slatsAD 2005-06-02Master dim and test system circuitAD 2005-05-01Cable assembly for the lower anti-collision lightAD 2005-04-14 R1ShimsAD 2005-03-02Air conditioning overhead ductsAD 2005-02-10Hydraulic lines located in the nacelle strutsAD 2005-01-12Trailing edge flap systemAD 94-01-10 R2Engine thrust reverser systemAD 2004-23-06Wire bundle clamp bracketAD 2004-23-12Guide arm assembly on passenger door number 1AD 2004-22-01Cargo restraint strap assemblies
Back to TCDS A2NM