TCDS E17NE
Airworthiness directives · 21
ADs whose products are models on this data sheet, matched by model and maker. Those in force first, newest first.
Query with SQL
duckdb -csv -c "SELECT d.ad_number, d.status, d.subject, d.effective_date FROM 'https://openairdocs.org/data/latest/faa_directive.parquet' d WHERE d.ad_id IN (SELECT ad_id FROM 'https://openairdocs.org/data/latest/faa_directive_product.parquet' WHERE tcds_number = 'E17NE') ORDER BY d.status = 'Historical', coalesce(d.effective_date, d.publication_date) DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT d.ad_number, d.status, d.subject, d.effective_date FROM 'https://openairdocs.org/data/latest/faa_directive.parquet' d WHERE d.ad_id IN (SELECT ad_id FROM 'https://openairdocs.org/data/latest/faa_directive_product.parquet' WHERE tcds_number = 'E17NE') ORDER BY d.status = 'Historical', coalesce(d.effective_date, d.publication_date) DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
AD 2026-07-06Turbine SectionAD 2024-12-04Turbine SectionAD 2021-14-13Turbine SectionAD 2019-05-01Turbine/Turboprop EngineAD 2018-22-06Fuel Control/Turbine EnginesAD 2018-14-10Fuel Control Turbine EnginesAD 2012-02-01Fan bladesAD 2009-14-05High-pressure compressor (HPC)AD 2009-10-08High-pressure turbine 2nd stage hubs that have previously been exposed to Pratt & Whitney cleaning procedure SPOP 10 or SPOP 9 or equivalent procedure.AD 2007-02-06High pressure compressor (HPC) drum rotor disk assembliesAD 2005-18-03Engine manufacturer's time limits section (TLS)AD 99-20-03High Pressure Turbine DisksAD 96-18-08 R1(HPT) High Pressure or (LPT) Low Pressure TurbineAD 97-11-51 R1First Stage High Pressure Turbine (HPT) Disk AssemblyAD 88-03-52Fuel Quantity Indication SystemAD 2017-12-03HistoricalFuel Control Turbine EnginesAD 2017-11-06HistoricalTurbine/ Turboprop EngineAD 2014-05-32HistoricalDiffuser-to-high-pressure turbine (HPT) case flangeAD 2002-12-06HistoricalTime Limits Section (TLS)AD 2000-21-09HistoricalCritical Life-limited PartsAD 99-08-14HistoricalMaintenance Program, Mandatory Inspections
Back to TCDS E17NE