CHAPTER 4. COMMUNICATIONS

40. COMMUNICATIONS NETWORK. An effective communications capability is essential to deploying aircraft in support of emergency operations. This chapter focuses on the need and methodology for establishing a communications network to implement a vertical flight aircraft support plan for disaster relief.

41. TERMINOLOGY,

PHRASEOLOGY, AND ACRONYMS. Each of the various groups in the disaster relief effort employs terms and phrases unique to their operation. Additionally, a specific acronym (abbreviation) does not always hold the same meaning for all responders. Thus, it is important to teach people to avoid the use of jargon and acronyms. This reduces the potential for misinterpretation.

42. ESTABLISH AN EMERGENCY COMMUNICATIONS NETWORK.

From the initial aircraft request until completion of the mission, the flow of information is critical. Figure 4-1 illustrates a communications network for requesting and managing helicopters and tiltrotor aircraft support. ONLY

ONE ENTITY SHOULD BE

RESPONSIBLE FOR DISPATCHING

VERTICAL FLIGHT AIRCRAFT

SUPPORT AND MANAGING THE ASSOCIATED RESOURCES.

Information is relayed to the command post as the demand changes. Advisories that alter the level of support are relayed through the net on a continuing basis.

The following is a brief explanation of the roles of each entity in the network.

a. Command Post. The command post (CP) is the initial contact point that receives notification of the disaster and requests activation of the disaster plan. Generally, this is the community's communications clearing house or an emergency number where alerts can be issued to authorities. As the plan is implemented and needs are identified, services are requested through the command post.

b. Incident Commander. In the USA, disaster relief efforts are often conducted using the Incident Command System (ICS). In this system, the Incident Commander (IC) is in charge of implementing the emergency operations plan. The IC notifies appropriate city/county staff and department heads of the action and requests their assistance in "turning on" various emergency operations. The IC or the delegated representative determines the need for aircraft support and provides information to the Air Operations (AO) center. This information includes:

(1) Type of disaster,

(2) Alert level,

(3) Location of disaster,

(4) Anticipated number of people requiring rescue or rapid transport,

(5) Types of helicopter and tiltrotor aircraft support needed,

(6) Locations of staging areas and/or landing zones, 27

Page 31OCROpen in PDF

Disaster Relief Effort Requirement Activation Command Checklist Post (CP) Incident Requirements Air Operations Verification Commander Director FAA Air Traffic Control Requirements Medical Information Hospital(s) Mission Assignments Landing Air Traffic Control Zones) Helicopters) Communications Plan Emergency Communications Net 11/13/98 FIGURE 4-1. EXAMPLE - HELICOPTER AND TILTROTOR COMMUNICATIONS SYSTEM

Page 32OCROpen in PDF

AC 00-59

(7) Weather at landing zone including wind speed and direction if possible, and

(8) Possible landing hazards.

c. Air Operations (AO) Center. The AO center will receive, then verify the request from the IC.

Depending on the requirements, the AO center may then communicate with the command post for further operational and support requirements.

(1) The AO center director should be familiar with helicopter capabilities (and tiltrotor capabilities, if appropriate), able to weigh operational risks, and experienced in making decisions under pressure. The AO director is responsible for implementing the vertical flight aircraft communications plan.

(2) The AO center will advise, designate, or request air traffic control (ATC) assistance from the FAA or, if applicable, the airborne air traffic controller (AATC). In addition, the AO center will request vertical flight aircraft support; determine the types and numbers of aircraft needed; determine the anticipated duration of assignments;

establish mission priorities; assess flight crew relief; organize ground support and security for helicopter and tiltrotor landing zones and staging areas; arrange for fuel trucks for sustained operations at staging areas; coordinate aircraft on the ground, in the air, at hospitals, and at staging areas; and disseminate 11/13/98 information such as control maps, frequencies, geographical coordinates of landing zones and staging areas, hazards, call numbers and names of personnel in charge.

(3) In the event a heliport/vertiport directory does not exist, landing site information (latitude, longitude, approach azimuth, potential hazards, notable landmarks, etc.) will be given to pilots.

(4) The AO center continuously monitors activities of helicopter and tiltrotor crews, medical crews, hospitals, air traffic control, and command and control operations. The AO center assesses further operational requirements as disaster details become known and the relief/rescue effort progresses. Air operations may shift staging areas, casualty collection points, hospitals, and emergency landing zones as required.

d. Collocation. Whenever possible, the Command Post, the Incident Commander, and the Air Operation Center should be collocated.

e. Communications Plan.

Smooth interactions among the medical and rescue units with helicopter and tiltrotor support activities and the prioritization of multiple relief requests comprise the most complicated and dynamic tasks of the communications plan. Ideally, the communications plan will help evaluate the initial estimation of damage and assignment of resources and will perform continuous 29

Page 33OCROpen in PDF

AC 00-59 reassessment of these factors and their impact on the level of support. The information exchanged is the basis for making weighted control decisions regarding the resources required to mitigate the disaster. The communications plan is composed of at least three information components:

(1) Medical information.

Medical tracking includes patient name, means of transport, medical status, and destination. The AO center assesses the requirements to transport medical personnel and special medical supplies or equipment. The AO also determines bed availability and assignment of receiving facilities. (Confidentiality dictates that patient names will not be broadcast unless there is some overriding reason to do so.)

(2) Mission assignments.

Mission assignments include operations, landing zone designation, assessment of rescue efforts, and specification of disaster reliet requirements.

(3) Air traffic control.

ATC consists of information from the FAA and potentially an airborne air traffic controller (AATC, e.g., police helicopter, Civil Air Patrol airplane, etc.). When AATC services are required, this controller will advise and sequence helicopters and tiltrotor traffic in and out of the landing zone and staging areas. The AATC will receive requests from air operations regarding the distribution of outgoing aircraft to hospitals, staging areas, and landing zones. The AATC will also coordinate with FAA ATC as necessary. The FAA will control the restricted airspace, issue 30 11/13/98 NOTAM's, and support the operations on a more general level.

f. Frequency Assignment. A key to information exchange is the establishment of separate, autonomous frequencies for medical, air, and ground operations. (A common frequency for use by all aviation personnel helps pilots to maintain the situational awareness required for safe operations. In addition, pilots need to be able to communicate, on an as-needed basis, with medical and ground operations personnel.) During a disaster, frequency congestion can cause conflicts in transmitting vital information or impede traffic control. Among various operational components, it is important that there be discrete emergency frequencies dedicated to each function.

The command post and the AO center should be able to monitor these frequencies simultaneously for reporting or requesting changes to the support levels. As hospital facilities approach saturation or as landing zone requirements are relayed to the command post, resources can be shifted or new demand levels can be established. Figure 4-2 summarizes some of the participants, the type of information being relayed, and the frequency ranges that are commonly used.

43. ESTABLISH PROCEDURES AND PROTOCOLS. Avoiding chaos and unnecessary radio traffic is one primary objective of writing and adopting a disaster relief plan.

Determining who is in charge and what procedures should be carried out will help minimize the confusion that often accompanies a disaster.

Page 34OCROpen in PDF

PARTICIPANTS AIRBORNE ATC TO PILOT FAA TO PILOT LZ CONTROL TO PILOT AO TO PILOT LZ CONTROL TO AIR CONTROL LZ CONTROL TO AO AO TO LZ CONTROL AO TO HOSPITAL AO TO POLICE CP TO AO MED CREW TO HOSPITAL HOSPITAL TO AO PILOT TO AO PILOT TO CP PILOT TO AIRBORNE ATC AC 00-59

INFORMATION FAA Air Traffic Control VHF, UHF

VHF, VAP, VHF, ETA Landing Zone FM UHF UHF UHF Landing Zone Conditions: VHF, Windspeed/Direction UHF, Lighting/Availability FM Landing Zone Coordinates/ Landmarks VHF, UHF VHF, UHF, FM VHF, UHF VHF, UHF VHF, UHF, FM On-Scene ATC of VHF, VHF, UHF, Cellular FM, Landing Zone UHF FM Phone (VHFUHF, Alert Notification Cellular Phone Damage Assessment Video UHF, VHF, Mission Assignment UHF FM, Mission Requirements Cellular Phone Security/Ground Control Cellular Phone

FM, FM, ETA Hospitals Cellular Phone FM VHF, UHF Hospital Resources FM Patient Status FIGURE 4-2. SAMPLE COMMUNICATIONS MATRIX 11/13/98

Page 35OCROpen in PDF

AC 00-59

a. Written Procedures. Every jurisdiction and mission should have written, established procedures in place for the smooth coordination, contro., and performance of rescue operations.

Protocols should be specific to avoid misinterpretation of authority for

b. Organized Protocols. It is advisable that protocols be organized by disaster type, controlling agency, and the aircraft operators' mission capabilities. Protocols and procedures should focus on areas of information inherent in the communications net. In addition, regular exercise of the plan is just as important as plan development.

44. MEDICAL INFORMATION.

Many types of medical information are critical to relief and rescue efforts including evaluation of injuries and special equipment needs. Information about the following may need to be communicated:

a. The command post or emergency operations center for alerting the medical community, i.e.

hospitals, helicopter and tiltrotor operators, physicians, Red Cross, and volunteer agencies;

b. The disaster scene, including the location(s) of victims;

C. The medical control unit to request special equipment, to specify patient care, to transport requirements, and to relay changes in bed availability;

32 11/13/98 requesting resources and controlling various activities relating to the disaster scene. Because different types of disasters often dictate different requirements, the procedures should also be flexible to be responsive to the specific disaster at hand.

d. The triage area for treatment, stabilization, and priority for transport;

e. The landing zone for special transport instructions depending on the severity of injury;

f. The AO center to the receiving facility for patient condition updates, aircraft estimated time of arrival (ETA), bed availability, and en route care requirements; and

g. The log book for problems or deviations from established procedures including causes or rationale behind deviations and results. Pictures and video may enhance the recall process during a post-incident analysis.

45. MISSION ASSIGNMENT. AO center mission assignment functions may be ground-side or airborne depending on the resources available.

Mission assignment duties are a command and control function that may encompass damage assessment, resource requirements and requests, air traffic control, and resource management. The AO director will do the following:

a. Manage emergency operations and aircraft mission assignments;

Page 36OCROpen in PDF

AC 00-59

b. Determine the agency that will provide aircraft for use in AATC;

c. Prioritize activities based on alert levels (i.e., determine airspace requirements), advise the authorizing agency on the nature and extent of damages, and call for ground and airborne support, etc.;

d. Provide damage assessment and notify the IC/command post of resource requirements and available staging areas close to the scene;

e. Advise the IC/command post, manage resources as relief requirements shift geographically, adjust the response levels as the need diminishes; and

f. Maintain a log on problems or deviations from established procedures including causes or rationale. Pictures and video can enhance recall during post-incident analysis.

46. AIR TRAFFIC CONTROL. Air traffic control will likely be conducted using a local ATC facility, a temporary emergency ATC facility, an AATC, or a combination of these facilities. All air traffic issues should be coordinated with local FAA personnel during development of the disaster response plan(s). Procedures should include the following:

a. Determine the agency that will control air operations at the disaster scenes;

11/13/98

b. Coordinate with the FAA/ATC on when and where to "hand off' aircraft;

c. Provide "fixes" for landing zones or staging areas or advising air operations of landmarks for ground reference in locating the site(s);

d. Determine traffic flow and advise the command post and air operations of patterns in advance of dispatch, if possible;

e. Sequence aircraft for approach to landing zones or staging areas;

f. Control departing aircraft to a disaster support area, a receiving facility, or a hand-off point to FAA/ATC for further guidance to intended destination;

g. Control the flow of observation/surveillance aircraft or approved broadcast media aircraft within or around the disaster scene if allowed under 14 CFR 91.137, Temporary Flight Restrictions;

h. Provide damage assessment to command post for further allocation or management of relief resources; and

i. Maintain a log on problems or deviations from established procedures including causes or rationale behind deviations and results - pictures and video may enhance the recall process during debriefing.

Page 37OCROpen in PDF

AC 00-59

47. PREDETERMINED

HELICOPTER AND TILTROTOR CALL SIGNS. Establish a procedure for determining helicopter and tiltrotor call signs that identify participating aircraft during a disaster activity and document it in the plan. This aids ATC personnel in separating the rescue aircraft from the general flow of traffic.

ATC may be accomplished by the FAA ATC facility closest to the scene, by FAA Air Route Traffic Control Center (ARTCC) personnel, or by an airborne "air control" aircraft.

a. One method of designating call signs could use the last three digits of the aircraft's registration number,

(e.g., N9465S), preceded by the identifier "Lifesaver" or "Rescue," resulting in the call sign, "Rescue 65- Sierra." (Sierra is the phonetic code for the letter S. The phonetic alphabet is used in all aviation call signs.)

b. Another means of assigning special call signs is to combine the aircraft role with part of its registration number and the number of persons the aircraft can rescue or transport. For example, if the aircraft registration number is N9465S and it can carry no litters and two passengers, the call sign would be "Lifesaver 5-Sierra-0-2."

c. Predesignation of Call Signs. Whenever possible, helicopter and tiltrotor aircraft will be preassigned a call sign for use during relief/rescue operations. The planning coordinator responsible for managing the aircraft inventory should advise the operators of the call signs when they are assigned and reconfirm them upon dispatch.

34 11/13/98

48. TEMPORARY FLIGHT RESTRICTIONS (TER).

a. Federal Aviation Administration/Air Traffic Control (FAA/ATC). Federal Aviation Regulations 14 CFR Part 91.137 and, in Hawaii, 14 CFR Part 91.138 authorize the FAA to set aside airspace over the scene of an accident, disaster, or some other special event. This allows the FAA to route the normal flow of traffic away from the area. These regulations provide for the immediate establishment of temporary restricted airspace to provide a safe operating environment for disaster relief aircraft, among other reasons. It will be important for the AO center to determine the need for and the extent of restricted airspace through discussions with appropriate personnel.

The AO center will request that the nearest FAA/ATC authority restrict the airspace involved. In making the request, the AO center must provide the FAA with the following information:

(1) Identity the reason for declaring FAR 14 CFR 91.137 (Temporary Flight Restrictions) or FAR 14 CFR 91.138, as appropriate,

(2) Identify the location by means of an azimuth and a distance (in nautical miles) from a ground-based navigational aid (accuracy is critical),

(3) Duration of expected restriction - a time frame can be estimated or the restriction can be active "until further notice," and

Page 38OCROpen in PDF

AC 00-59

(4) Altitudes affected - these may be dictated by the nature of the disaster, winds, spatial arrangement and heights of buildings, number of aircraft needed for rescue operations, etc., and who will be directing relief activities.

b. Further information on the types of restrictions and related procedures is available in FAA AC No.

91-63, Temporary Flight Restrictions, and in FAA Handbook 7930.2 "Notices to Airmen," (See Chapter 8, Flight Data Center NOTAM Procedures, sections 8- 1, b and 8-3). Avoid requesting a larger TFR than what is necessary. Once a TFR is requested, it may take 20 minutes to an hour or longer before it becomes effective.

c. Fragile Structures.

Consider the case of a building, a highway overpass, or other structure that has partially collapsed due to an earthquake, a terrorist bomb, or some similar event. Such a structure is "fragile" in that further collapse could be caused by a relatively small outside force such as rotorwash or vibrations induced by aircraft noise. There may be victims, alive and dead, trapped within this structure. Rescue workers may be working to locate and extricate these victims. The FAA has received several UNCONFIRMED reports that helicopters may have caused the further collapse of such a fragile structure.

Aircraft noise can also frustrate the efforts of rescue workers listening with highly sensitive sensors to locate victims trapped under the rubble.

Planners and aircraft operators should be aware of these possibilities.

11/13/98

d. Protection of People in Fragile Structures. Temporary flight restrictions (TFR's) are an effective tool for protecting people from the risk of the further collapse of a fragile structure.

TFR's should be sufficiently large to mitigate these hazards. However, airspace restrictions should not be so large that they interfere unnecessarily with valid and safe air operations. The variability and uncertainties of fragile structures do not lend themselves to a rigorous measurement of risk thresholds. However, a TFR that extends to 2000 feet above the ground and out to a radius of one nautical mile around the structure appears to provide reasonable protection without being excessive. Due to the limited field experience on this issue, the FAA is soliciting reports of both problems and successes in efforts to protect fragile structures during rescue operations.

Send such reports FAA, General Aviation and Vertical Flight Program Office, AND-710, 800 Independence Ave. SW, Washington DC 20591 and reference this AC.

49. DOCUMENTATION.

Organization, education, and training are the keys to efficient disaster response. The emergency response plan will serve as a guide during times of emergency, as a training tool for new disaster relief personnel, and for exercises. The communications plan should be located in the overall disaster relief plan as a separate tabbed section.

The following list details communication plan elements:

Page 39OCROpen in PDF

AC 00-59

a. Definitions and acronyms for understanding disaster, aircraft,.

medical, and radio terminology and phraseology;

b. Organizational flow chart, general description of responsibilities for each component of the communications network;

c. Step-by-step process in requesting resources based on alert levels;

d. Telephone and radio frequency lists of communications authorities by network component, participating helicopter and tiltrotor operators (including government flight operations), facsimile numbers, frequencies for UHF/VHF, FM, AM, short-wave, citizen's band, cellular telephone numbers, etc.;

. Communications equipmen requirements for emergency use based on relief/rescue role;

f. Instructions on assigning call signs for new volunteer aircraft operators;

g. Sample briefing documents or forms that can be easily completed and hand delivered or Faxed to authorities, dispatch centers and/or aircraft operators;

h. Responsibilities and procedures for each participant in the disaster relief effort; responsibilities and procedures for each mission type for new participants; and 36 11/13/98

i. Distribution (to participants) of the control maps that can be marked up to identify staging areas, landing zones, or relief areas (see also Chapter 5).

Page 40OCROpen in PDF

CHAPTER 5. HELICOPTER AND FILTROTOR LANDING AREAS

50. INTRODUCTION. During a disaster relief effort, helicopter and tiltrotor operations will require the use of landing areas close to the scene. At locations other than airports, these can be one of several types of sites including: existing heliports or vertiports, predesignated emergencyuse-only landing areas. or on-demand temporary facilities to be used specifically for relief activities. This chapter discusses the general criteria for establishing landing areas to be used by vertical flight aircraft.

a. Landing Site Selection.

Before heliports, vertiports, and emergency landing sites can be established, it is necessary to determine specific site selection and/or approval criteria for such landing zones. This makes it possible to recognize candidate sites for designation as emergency-useonly landing zones and to standardize, to the extent possible, helicopter and tiltrotor emergency landing site facilities for maximum safety and utility.

b. Heliport and Vertiport Design. FAA recommendations for heliport design and construction are contained in AC 150/5390-2, Heliport Design. FAA recommendations for vertiport design and construction are contained in AC 150/5390-3, Vertiport Design. These design ACs were developed by a Government/Industry working group and are intended to represent the MINIMUM REQUIREMENTS for a safe and functional heliport. It is within the prerogative of any jurisdiction to impose additional or more stringent criteria on heliport establishment over and above those contained in the AC. Further information on heliports and vertiports may be obtained from the resources listed in Appendix C.

c. Three Fundamental Requirements. For safe operations at any helicopter or tiltrotor landing site, a pilot needs three things as listed below.

Embellishments on these basic requirements are usually a function of the purpose of the facility, resources available to develop it, and how often it will be used. In a disaster situation with multiple helicopters and tiltrotors participating, it is highly desirable to have multiple approach and departure paths into the landing zone and multiple parking areas. This provides an increased safety margin, operational flexibility, and reduction in operational delay.

(1) Adequate clear airspace for approach and departure (with at least one, and preferably two, departure paths),

(2) Adequate clear space for expected ground maneuvers, and

(3) Adequate current information about wind speed and direction (a wind sock is the ideal source of such information).

Page 41OCROpen in PDF

AC 00-59

51. SAFETY PERSPECTIVE. In disaster relief efforts, aircraft are sometimes sent on rescue missions that may involve life and death situations.

Under such circumstances, pilots have been known to assume unusual risks willingly. Perhaps their thinking is that such risks are justified in the interest of saving lives. Unfortunately, however, such thinking may lead pilots to take unnecessary and inappropriate risks.

a. Community Resources.

Lives may well be at risk during disaster relief efforts. Community resources are often stretched to the breaking point and beyond. This is a VERY BAD TIME for an aviation accident. Such an accident can bring to a halt the relief effort that the aircraft mission was supporting. It can also bring to a halt other relief efforts as it siphons off resources to deal with the aircraft accident. Thus, instead of bringing disaster relief assistance, an aircraft accident may require significantly more resources that the aircraft would have been able to deliver as an active part of the relief effort.

b. Safety is Paramount. In everyday operations, a pilot requires a certain amount of clear airspace to conduct approach and departure operations safely. In everyday operations, a pilot requires a certain amount of cleared space in order to conduct ground maneuvers safely. A pilot also requires current information about wind speed and direction in order to operate safely at any landing site.

Pilots do not need less clear airspace, less clear ground space, or less current wind information simply because a disaster has occurred. While a disaster 38 11/13/98 may appear to turn the world upside down, the laws of physics still apply.

Thus, in the selection of helicopter and tiltrotor landing sites, pilots should demand sites that provide at least the three basic design elements discussed in paragraph 50c.

52. SELECTION CRITERIA. The FAA Heliport Design Advisory Circular, AC 150/5390-2, contains detailed criteria for heliport design. The FAA Vertiport Design Advisory Circular, AC 150/5390-3, contains detailed criteria for vertiport design.

What follows is a limited discussion of the basic points that should be considered when designing or designating helicopter and tiltrotor landing sites, regardless of whether the facility is permanent or temporary, extensive or simple.

a. Location. When selecting the location of an emergency-use landing zone, whether temporary or permanent, bear in mind the ultimate purpose of the facility. Landing zones near the disaster site and the emergency room entrance at the receiving hospital are most desirable, but not at the expense of safety, communications, and operations. The landing area at the scene should be placed sufficiently far away from activity centers that rotorwash will not blow dust or supplies around and noise will not interfere with communications.