AC 120-91A

Advisory circular · Airport Obstacle Analysis

Approved
January 13, 2020
Last reviewed
August 22, 2024
Cancels
AC120-91
Family
AC 120-91 · 2 versions
Revision
A
14 CFR parts
121, 135, 1, 25, 33, 77, 91, 152

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 22, 2025.

U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Airport Obstacle Analysis Date: 1/13/20 AC No: 120-91A Initiated by: AFS-400 Change:

1. PURPOSE OF THIS ADVISORY CIRCULAR (AC). This AC describes acceptable methods and guidelines for developing takeoff and initial climbout airport obstacle analyses and in-flight procedures to comply with the intent of the regulatory requirements of Title 14 of the Code of Federal Regulations (14 CFR) part 121, §§ 121.177 and 121.189; part 135, §§ 135.367,

135.379, and 135.398; and other associated one-engine-inoperative (OEI) requirements relating to turbine-engine-powered airplanes operated under parts 121 and 135. The methods and guidelines presented in this AC are neither mandatory nor the only acceptable methods for ensuring compliance with the regulatory sections. Operators may use other methods if those methods are shown to provide the necessary level of safety and are acceptable to the Federal Aviation Administration (FAA). This AC need not serve as the sole basis for determining whether an obstacle analysis program meets the intent of the regulations. However, the methods and guidelines described in this AC have been derived from extensive FAA and industry experience and are considered acceptable to the FAA when appropriately used. Mandatory words such as “shall” or “must” apply only to those who seek to demonstrate compliance to a specific rule by use of a method set out in this AC without deviation. The contents of this document do not have the force and effect of law and are not meant to bind the public in any way. This document is intended only to provide clarity to the public regarding existing requirements under the law or agency policies.

2. AUDIENCE. This AC serves to inform parts 121 and 135 operators of an acceptable means to comply with the requirements stated in §§ 121.177, 121.189, 135.367, 135.379, and 135.398;

and other associated OEI requirements under parts 121 and 135.

3. WHERE YOU CAN FIND THIS AC. You can find this AC on the FAA’s website at http://www.faa.gov/regulations_policies/advisory_circulars.

4. WHAT THIS AC CANCELS. AC 120-91, Airport Obstacle Analysis, dated May 5, 2006, is canceled.

5. RELATED REGULATIONS AND DOCUMENTS.

a. Regulations. Title 14 CFR:

• Part 1, § 1.1.

• Part 25, §§ 25.105, 25.107, 25.111, 25.113, and 25.115.

• Part 33.

• Part 77.

Par 5 Page 2

• Part 91, § 91.167.

• Part 121, §§ 121.97, 121.141, 121.173, 121.177, 121.189, 121.191, 121.443, and 121.445.

• Part 135, §§ 135.367, 135.379, 135.381, and 135.398.

• Part 152, § 152.11.

b. Related References (current editions).

(1) Additional information on airport obstacle analysis may be found in the documents listed below. The documents are available at https://www.faa.gov/regulations_policies/.

• AC 150/5300-13, Airport Design.

• FAA Order 8260.3, United States Standard for Terminal Instrument Procedures (TERPS).

• FAA Order 8260.46, Departure Procedure (DP) Program.

• FAA Order 8260.58, United States Standard for Performance Based Navigation (PBN) Instrument Procedure Design.

• FAA Order 8900.1.

(2) The International Civil Aviation Organization (ICAO) documents below may be purchased from https://www.icao.int/publications/Pages/default.aspx:

•ICAO Annex 4, Aeronautical Charts, Chapters 3, 4, and 5.

•ICAO Annex 6, Operation of Aircraft, Part I.

(3) U.S. Chart Supplements. These documents may be found online at https://www.faa.gov/air_traffic/flight_info/aeronav/digital_products/dafd/.

6. FOCUS.

a. Applicability. This AC applies to operations conducted under part 121 and operations of large transport and commuter category airplanes conducted under part 135, with particular emphasis on transport category turbine- and reciprocating-engine-powered airplanes, which meet the certification regulations applicable since August 29, 1959 (Special Civil Air Regulation (SR)-422B). Airplanes meeting earlier performance requirements or other types of airplanes may use criteria and methods equivalent to those described by this AC, provided they properly account for the performance specified by the Airplane Flight Manual (AFM). Other operators

(e.g., part 91 turbojet operators) may use the information in this AC as applicable to that operator’s needs and requirements, as long as the resulting operations are otherwise consistent with applicable regulations.

b. Mandatory Language. If an operator adopts the suggestions contained in this AC, when appropriate, the operator must replace discretionary language such as “should” and “may” with mandatory language in relevant manuals, operations specifications (OpSpecs), or management specifications (MSpecs).

Par 7 Page 3

7. BACKGROUND. Sections 121.177, 121.189, 135.367, 135.379, and 135.398 specify required takeoff and performance operating limitations. These limitations include determination of the takeoff flightpath that meets specified obstacle clearance requirements (both vertical and horizontal) in the event of an engine failure. Sections 121.189, 135.379, and 135.398 specify AFM compliance, and part 25 provides requirements for establishing the AFM performance data.

While the AFM provides detailed instructions for determining the vertical clearance, it offers little guidance on the lateral clearance requirements. This AC provides information for determining safe clearance from obstacles for the actual flightpath, and for considering factors that may cause a divergence of the actual flightpath from the intended flightpath. This AC also provides guidance and acceptable lateral criteria to assist an operator in developing takeoff procedures and allowable weights for operational use.

8. IMPLEMENTATION. The FAA recommends that operators develop a plan to implement the guidance in this AC with performance gates to organize and schedule implementation.

Service to a new airport location or the development of new or revised airport obstacle data presents an opportunity for implementation. The FAA expects operators to use the best available data for airport obstacle analysis and to continually review and use improved data as it becomes available. Airports listed in the Special Pilot-In-Command Qualification Airports list on the Flight Standards Management Information System (FSIMS) website, because of critical terrain or obstacles, should be given the highest priority. The FAA strongly recommends that operators review or reanalyze airports on this list in accordance with the guidance in this AC within 2 years of the date this AC is issued.

9. SOURCES OF OBSTACLE DATA. Operators are expected to use the best and most accurate available obstacle data for a particular airport at the time of analysis. Data sources do not require specific FAA approval. Operators should be aware that an airport Obstruction Chart (OC), Type A chart, or any other single source might not include all the pertinent information necessary for doing a takeoff analysis.

10. TERMINAL INSTRUMENT PROCEDURES (TERPS) CRITERIA VERSUS OEI REQUIREMENTS.

a. Normal Departure Requirements. Standard Instrument Departures (SID) or departure procedures (DP) based on TERPS or ICAO Procedures for Air Navigation Services Aircraft Operations (PANS-OPS) are based on normal (all-engines-operating (AEO)) operations. Thus, OEI obstacle clearance requirements and the AEO TERPS requirements are independent, and OEI procedures do not need to meet TERPS requirements. Further, compliance with TERPS AEO climb gradient requirements does not necessarily ensure that OEI obstacle clearance requirements are met. TERPS typically use specified AEO climb gradients to an altitude, rather than certificated OEI airplane performance. TERPS typically assume a climb gradient of 200 feet per nautical mile (NM) unless a greater gradient is specified. For the purposes of analyzing performance on procedures developed under TERPS or PANS-OPS, it is understood that any gradient requirement, specified or unspecified, will be treated as a plane, which must not be penetrated from above until reaching the stated height, rather than as a gradient that must be exceeded at all points in the path. Operators must comply with 14 CFR requirements for the development of takeoff performance data and procedures. There are differences between TERPS and OEI criteria, including the lateral and vertical obstacle clearance requirements. An engine

Par 10 Page 4 failure during takeoff is a non-normal condition, and therefore takes precedence over noise abatement, air traffic, SIDs, DPs, and other normal operating considerations.

b. Considerations for OEI Departure Development. In order for an operator to determine that a departure maintains the necessary obstacle clearance with an engine failure, the operator should consider that an engine failure may occur at any point on the departure flightpath.

(1) The most common procedure to maximize takeoff weight when significant obstacles are present along the normal departure route is to use a special OEI departure routing in the event of an engine failure on takeoff. If there is a separate OEI departure route, then the obstacles along this track are used to determine the maximum allowable takeoff weight for that runway.

(2) Consideration should be given to the possibility of an engine failure occurring after passing the point at which the OEI track diverges from the normal departure track. Judicious selection of this point would simplify the procedure and minimize the difficulty of this analysis.

This is generally achieved by keeping the two tracks identical for as far as is practical.

(3) In some cases, two or more special OEI tracks may be required to accommodate all potential engine failure scenarios.

(4) A nalysis of an engine failure after takeoff may require the use of performance data in addition to that provided in the AFM (see subparagraph 18a(1)).

c. Consultation with the FAA. When requested by the operators, the FAA may arrange a joint meeting with the operators and other interested parties for discussing AEO and OEI requirements at a particular problem airport. Interested parties should include representatives from the responsible Flight Standards office, the appropriate Procedure Validation Team (PVT), certificate management offices (CMO), local and regional air traffic control (ATC) specialists, Flight Program Operations (AJF-0) (formerly the Aviation Standards National Field Office (AVN)), and affected operators. The operators should bring to the initial meeting a specific departure proposal with alternatives that consider AEO and OEI requirements. The operators should attempt to agree on a standard OEI ground track and the FAA should make every effort to develop the SID and/or instrument flight rules (IFR) DP to match. The operators should understand that changes to the current SID or IFR departure may require a modification in takeoff weather minimums or variation in the length of the departure route. Because of the different performance characteristics of various airplanes and airline operational policy, this effort may not result in complete procedure standardization, but it is to the benefit of all parties that the number of unique procedures be minimized.

11. O BSTACLE CONSIDERATIONS.

a. Frangible Structures. Frangible structures fixed by function with an aeronautical purpose (such as antennas, approach lights, and signs) need not be considered in an obstacle analysis.

b. Temporary and Transient Obstacles. Operators shall take into account local temporary or transient obstacles, such as ships, cranes, or trains. The clearance height allowances for vehicles above roads, railroads, etc., contained in part 77 and/or on the OCs shall be used. If the

Par 11 Page 5 operator has a means to determine the absence of a movable object at the time of takeoff, then it need not be accounted for in the analysis.

c. Objects of Indeterminate Height. Operators should use reasonable judgment to account for the height of indeterminate objects (objects without recorded height) displayed on topographic maps. Indeterminate objects include such items as trees, buildings, flagpoles, chimneys, and transmission lines. The operator needs to use sound judgment in determining the best available data sources when conflicts occur between heights and locations of obstacles in the various sources.

d. Obstacle Removal. If the operator cannot obtain adequate takeoff weights through the methods of analyses recommended by this AC or other acceptable methods, an obstacle removal program should be considered. Title 49 of the United States Code (49 U.S.C.) § 47107(a)(9) requires operators of obligated airports to take appropriate action to clear and protect terminal airspace required to protect instrument and visual operations to the airport (including operations at established minimum flight altitudes) by mitigating existing and preventing future airport hazards. One method of compliance is described in AC 150/5300-13, for obstacles within the airport’s control. In general, these criteria provide for removal of obstacles that are neither fixed by function nor required for airport operations safety, that are within the “Runway Object Free Area (OFA)” as defined in AC 150/5300-13. Operators should coordinate with the airport operator to determine whether it is feasible to have an obstacle removed.

e. Review Cycle. Operators should establish an appropriate review cycle to periodically review the suitability of their performance data and procedures. In addition, operators should evaluate the effect of changes that occur outside of normal information or charting cycles. These changes may occur as a result of issuance of an operationally significant Notice to Airmen (NOTAM), temporary obstacle information, new construction, Automatic Terminal Information Service (ATIS), procedural constraints, Navigational Aid (NAVAID) outages, etc. For both periodic reviews and temporary changes, the operator should consider at least the following:

(1) The need for an immediate change versus a routine periodic update.

(2) Use of the best available information.

(3) Any significant vulnerability that may result from the continued use of data other than the most current data, until performance and/or procedures are updated through a routine revision cycle.

(4) Continued suitability of estimates or assumptions used for winds, temperatures, climb gradients, NAVAID performance, or other such factors that may affect airplane performance or the airplane’s flightpath.

(5) The review cycles and response times should be keyed to the needs and characteristics of the operator’s fleet, routes, airports, and operating environment. No specific timeframe is established for an operator to conduct either periodic reviews or short-term temporary adjustments.

Par 12 Page 6

12. TERMINATION OF TAKEOFF SEGMENT.

a. End of Takeoff Segment. For the purpose of the takeoff obstacle clearance analysis, the end of the takeoff flightpath is considered to occur when:

(1) The airplane has reached the minimum crossing altitude (MCA) at a fix or the minimum en route altitude (MEA) for a route to the intended destination;

(2) The airplane is able to comply with en route obstacle clearance requirements (§§ 121.191, 121.193, 135.381, and 135.383); or

(3) The airplane has reached the minimum vectoring altitude, or a fix and altitude from which an approach may be initiated, if the operator’s emergency procedure calls for an immediate return to the departure airport or a diversion to the departure alternate in the event of an engine failure during takeoff.

b. Gross Versus Net Flightpath. When determining the limiting takeoff weight, the obstacle analysis should be carried out to the end of the takeoff segment as defined in subparagraph 12a above. Operators should note that the end of the takeoff segment is determined by the airplane’s gross flightpath, but the obstacle analyses must use the net flightpath data.

c. Routing to an Alternate Airport. In the event that the airplane cannot return to and land at the departure airport, the takeoff flightpath should join a suitable en route path to the planned destination or to another suitable airport. It may be necessary to address extended times and alternate fuel requirements when climbing in a holding pattern with reduced climb gradients associated with OEI turns.

13. METHODS OF ANALYSIS. Sections 121.189, 135.379, and 135.398 require that the net takeoff flightpath clears all obstacles by either 35 feet vertically or 200 feet laterally inside the airport boundary, or 300 feet laterally outside the airport boundary. To operate at the required lateral clearance, the operator must account for factors that could cause a difference between the intended and actual flightpaths and between their corresponding ground tracks. For example, it cannot be assumed that the ground track coincides with the extended runway centerline without considering such factors as wind and available course guidance (see paragraph 17). This AC will focus on two methods that may be used to identify and ensure clearance of critical obstacles: the Area Analysis Method and Flight Track Analysis Method. The two methods may be used in conjunction with each other on successive portions of the analysis. For example, an operator may choose to use an Area Analysis for the initial portion of the takeoff analysis, followed by a Flight Track Analysis, and then another Area Analysis.

a. Area Analysis Method. The Area Analysis Method defines an Obstacle Accountability Area (OAA) within which all obstacles must be cleared vertically. The OAA is centered on the intended flight track and is acceptable for use without accounting for factors that may affect the actual flight track relative to the intended track, such as wind and available course guidance.

b. Flight Track Analysis Method. The Flight Track Analysis Method is an alternative means of defining an OAA based on the navigational capabilities of the aircraft. This methodology requires the operator to evaluate the effect of wind and available course guidance

Par 13 Page 7 on the actual ground track. While this method is more complicated, it can result in an area smaller than the OAA produced by the Area Analysis Method.

14. AREA ANALYSIS METHOD.

a. Straight-Out Departures. During straight-out departures or when the intended track or airplane heading is within 15 degrees of the extended runway centerline heading, the following criteria apply:

(1) The width of the OAA is 0.0625D feet on each side of the intended track (where D is the distance along the intended flightpath from the end of the runway in feet), except when limited by the following minimum and maximum widths.

(2) The minimum width of the OAA is 200 feet on each side of the intended track within the airport boundaries, and 300 feet on each side of the intended track outside the airport boundaries.

(3) The maximum width of the OAA is 2,000 feet on each side of the intended track (see Appendix 1, Figure 1-1, Straight-Out Departures).

b. Turning Departures. During departures involving turns of the intended track or when the airplane heading is more than 15 degrees from the extended runway centerline heading, the following criteria apply:

(1) The initial straight segment, if any, has the same width as a straight-out departure.

(2) The width of the OAA at the beginning of the turning segment is the greater of:

(a) 300 feet on each side of the intended track.

(b) The width of the OAA at the end of the initial straight segment, if there is one.

(c) The width of the end of the immediately preceding segment, if there is one, analyzed by the Flight Track Analysis Method.

(3) Thereafter in straight or turning segments, the width of the OAA increases by

0.125D feet on each side of the intended track (where “D” is the distance along the intended flightpath from the beginning of the first turning segment in feet), except when limited by the maximum width in subparagraph (4) below:

(4) The maximum width of the OAA is 3,000 feet on each side of the intended track (see Appendix 1, Figure 1-2, Turning Departures).

Par 14 Page 8

c. Applying the Area Analysis Method. The following apply to all departures analyzed with the Area Analysis Method:

(1) A single intended track may be used for analysis if it is representative of operational procedures. For turning departures, this implies the bank angle is varied to keep a constant turning radius with varying speeds.

(2) Multiple intended tracks may be accommodated in one Area Analysis by increasing the OAA width accordingly. In a turn, the specified OAA half-widths (i.e., one-half of the OAA maximum width) should be applied to the inside of the minimum turn radius and the outside of the maximum turn radius. An average turn radius may be used to calculate distances along the track.

(3) The distance to an obstacle within the OAA should be measured along the intended track to a point abeam the obstacle.

(4) When an operator uses the Area Analysis Method, the operator does not need to separately account for crosswind, instrument error, or flight technical error within the OAA.

(5) Obstacles prior to the end of the runway need not be accounted for, unless a turn is made prior to the end of the runway.

(6) One or more turns of less than 15 degrees each, with an algebraic sum of not more than a 15-degree change in heading or track, may be analyzed as a straight-out departure.

(7) No accountability is needed for the radius of the turn or gradient loss in the turn for a turn with a 15-degree or less change in heading or track.

15. FLIGHT TRACK ANALYSIS METHOD. The Flight Track Analysis Method involves analyzing the ground track of the flightpath. This paragraph discusses factors that the operator must consider in performing a Flight Track Analysis.

a. Pilotage in Turns. The operator should consider the ability of a pilot to initiate and maintain a desired speed and bank angle in a turn. Assumptions used here should be consistent with pilot training and qualification programs.

b. Winds.

(1) When using the Flight Track Analysis Method while course guidance is not available, operators should take into account winds that may cause the airplane to drift off the intended track.

(2) The operator should take into account the effect of wind on the takeoff flightpath, in addition to making the headwind and tailwind component corrections to the takeoff gross weight used in a straight-out departure.

Par 15 Page 9

(3) When assessing the effect of wind on a turn, the wind may be held constant in velocity and direction throughout the analysis unless known local weather phenomena indicate otherwise.

(4) If wind gradient information is available near the airport and flightpath (e.g., wind reports in mountainous areas adjacent to the flightpath), the operator should take that information into account in the development of a procedure.

16. COURSE GUIDANCE. Operators may take credit for available course guidance when calculating the lateral location of the actual flight track relative to the intended track as part of a Flight Track Analysis.

a. Allowance for Ground-Based Course Guidance.

(1) When ground-based course guidance is available for Flight Track Analysis, the following nominal allowances may be used, unless the operator substantiates allowances for specific NAVAIDs at a particular airport:

(a) Localizer (LOC): ± 1.25 degree splay with minimum half-width of 300 feet.

(Minimum width governs up to 2.25 NM from LOC.)

(b) Very high frequency omni-directional range (VOR): ± 3.5 degree splay with minimum half-width of 600 feet. (Minimum width governs up to 1.6 NM from VOR.)

(c) A utomatic direction finder (ADF): ± 5 degree splay with minimum half-width of 1,000 feet. (Minimum width governs up to 1.9 NM from ADF.)

(d) Distance measuring equipment (DME) fix: ± 1 minimum instrument display increment but not less than ± 0.25 NM.

(e) DME arc: ± 2 minimum instrument display increments but not less than ± 1 NM.

NOTE: The above splays originate from the navigation facility.

(2) These allowances account for crosswind, instrument error, flight technical error, and normal NAVAID signal inaccuracies. Further allowances should be made for known signal anomalies (refer to the U.S. Chart Supplements).

(3) Ground-based course guidance may be used in combination with other forms of course guidance to construct a DP.

b. Allowance for Airplane Performance-Based Area Navigation Capabilities.

(1) Airplane-based area navigation refers to a system (e.g., flight management system (FMS), Global Positioning System (GPS), Area Navigation (RNAV), Required Navigation Performance (RNP), or inertial reference system (IRS)) that permits airplane operations on any desired course, including a turn expansion for flyby or flyover waypoints, within the coverage of ground- or space-based station reference navigation signals or within the limits of self-contained

Par 16 Page 10 system capabilities without direct course guidance from a ground-based NAVAID. The credit and consideration given to each system depends on its accuracy, redundancy, and usability under OEI conditions.

(2) The minimum allowance is the demonstrated accuracy of the airplane-based navigation equipment.

NOTE: Under no circumstances can the OAA half-width be reduced to less than the regulatory minimums of 200 feet within the airport boundaries and 300 feet after passing the boundaries.

NOTE: The demonstrated accuracy provided in the AFM may not be accurate for determining the OAA without further substantiation. For example, the AFM demonstrated accuracy has not considered “site-specific” dependencies such as accuracy and availability of ground-based NAVAIDs.

(3) Airplane-based course guidance may be used in combination with other navigational course guidance to construct a DP.

c. Allowance for Visual Course Guidance.

(1) Visual ground reference navigation is another form of course guidance. However, to take advantage of visual course guidance, a Flight Track Analysis must be performed.

(2) The ability to laterally avoid obstacles by visual reference can be very precise, if the obstacles can be seen and are apparent. It is the operator’s responsibility to operate in weather conditions, including ceiling and visibility at the time of the operation, that are consistent with the use of the visual ground reference points for the navigation upon which the obstacle analysis is based.

(3) To t ake advantage of visual course guidance, the flightcrew should be able to continuously determine and maintain the correct flightpath with respect to ground reference points to provide a safe clearance with respect to obstructions and terrain.

(a) The procedure should be well defined with respect to ground reference points so that the track to be flown can be analyzed for obstacle clearance requirements.

(b) An unambiguous written and/or pictorial description of the procedure must be provided for crew use.

(c) The limiting environmental conditions (e.g., wind, ceiling, visibility, day/night, ambient lighting, obstruction lighting, etc.) must be specified for the use of the procedure so that the flightcrew is able to visually acquire ground reference navigation points and navigate with respect to those points.

(d) The procedure must be within the OEI capabilities of the airplane with respect to turn radii, bank angles, climb gradients, effects of winds, flight deck visibility, etc.

Par 16 Page 11

(4) When visual course guidance is used for Flight Track Analysis, the following minimum allowances (in addition to turn radii) apply:

(a) If the obstacle itself is the reference point being used for visual course guidance, the minimum allowance is 300 feet for lateral clearance from that obstacle.

(b) When following a road, railroad, river, valley, etc., for course guidance, the minimum allowance is 1,000 feet on each side of the width of the navigation feature. This width should include the meandering and/or curves of the navigation feature being used or the definable center of the valley or river.

(c) When using a lateral visual reference point to initiate a turn, the minimum allowance is ± 0.25 NM along the track at the turn point.

(d) When initiating a turn directly over a visual reference point, the minimum allowance is ± 0.50 NM along the track at the turn point.

(e) When initiating a turn to avoid overflight of a visual reference point, the minimum allowance is ± 1 NM along the track at the turn point.

(5) Visual course guidance may be used as part of an IFR procedure (e.g., SID, DP) or in conjunction with IFR flight during that portion of the operation that is in visual meteorological conditions (VMC). The visual course guidance may be used in combination with other forms of course guidance to construct an OEI DP.

17. ANALYSIS OF TURNS.

a. Temperature Effects on Turns. Temperature usually has a very large effect on turn radius. First, the turn radius is a function of true airspeed (plus wind), which varies with temperature at the same indicated airspeed. Second, the OEI indicated airspeed (takeoff safety speed (V2) or V2 plus an increment) varies considerably with weight, and limit weight is strongly affected by temperature. The temperature effect on both the maximum and minimum turn radii must be taken into account. However, it is acceptable to do a turn analysis based on a single critical temperature if that temperature produces results that are conservative for all other temperatures.

b. Bank Angle. Sections 121.189, 135.379, and 135.398 assume that the airplane is not banked before reaching a height of 50 feet, and that thereafter, the maximum bank is not more than 15 degrees. Obstacle clearance at certain airports can be enhanced by the use of bank angles greater than 15 degrees. The following bank angles and heights may be used with OpSpec authorization (in accordance with § 121.173(f)). Any bank angles greater than the values shown in Table 1 below require additional, specific FAA authorization.

Par 17 Page 12 TABLE 1. MAXIMUM BANK ANGLES Height (Above Departure End of Runway - Feet) Maximum Bank Angle (Degrees) h > 400 25 400 > h > 100 20 100 > h > 50* 15 * = Or 1/2 of wingspan, whichever is higher

(1) The AFM generally provides a climb gradient decrement for a 15-degree bank. For bank angles less than 15 degrees, a proportionate amount of the 15-degree value may be applied, unless the manufacturer or AFM has provided other data. Bank angles over 15 degrees require additional gradient decrements.

(2) If bank angles of more than 15 degrees are used, V2 speeds may have to be increased to provide an equivalent level of stall margin protection and adequate controllability

(i.e., minimum control speed with the critical engine inoperative out of ground effect (VMC)).

Unless otherwise specified in the AFM or other performance or operations manuals from the manufacturer, acceptable adjustments to ensure adequate stall margins and gradient decrements are provided by Table 2 below:

TABLE 2. BANK ANGLE ADJUSTMENTS Bank Angle Speed “G” Load Gradient Loss 15° V2 1.035 AFM 15° Gradient Loss 20° V2 + XX/2 1.064 Double 15° Gradient Loss 25° V2 + XX 1.103 Triple 15° Gradient Loss Where “XX” = the AEO operating speed increment (usually 10 or 15 knots) NOTE: On some airplanes, the AFM standard V-speeds may already provide sufficient stall margin protection without additional adjustments.

(3) Bank angles over 25 degrees may be appropriate in certain circumstances but require specific evaluation and approval by the responsible Flight Standards office.

(4) Accountability for speed increase for bank angle protection may be accomplished by increasing V-speeds by the required increment shown above or by accelerating to the increment above V2 after lift-off. The following are examples of acceptable methods:

(a) If available, AFM data for “improved climb” or “overspeed” performance may be used to determine weight decrements for the desired increase to takeoff decision speed (V1), rotation speed (VR), and V2.

(b) Calculate a weight decrement from the weight/V-speed relationship in the AFM for the desired increase in V1, VR, and V2.