Guidance, not mandatory unless a rule or AD requires it. DRS record last changed October 23, 2026.

Advisory U.S. Deportment of CircularAviation Administration WASTE WATER/POTABLE WATER DRAIN Date:

SYSTEM CERTIFICATION TESTING Initiated Change:

1 PURPOSE. This advisory circular (AC) sets forth a specific method of compliance with the requirements of of the Federal Aviation Regulations (FAR) pertaining to draining of fluids through drain masts when the fluids are subject to freezing. This method is designed to verify that draining fluids will not accumulate as ice in sufficient quantity to be hazardous. This AC is for guidance purposes and to set forth one method of compliance that has been found acceptable. As with all advisory circular material, it is not mandatory and does not constitute a regulation. In lieu of following this method, the applicant may elect to follow any alternate method found by the FAA to be an acceptable means of complying with the requirements of 2 RELATED FAR SECTIONS. Section This AC discusses compliance with .1455 only. This AC does not cover the drain system installation (plumbing, structure, electrical components, etc.) and the system failure effects. The installation and its failure effects should be reviewed for compliance under other sections of Part 3 BACKGROUND.

a. Transport category airplanes in service today generally have several sources of freezable liquids. One source is the potable water system used to supply drinking, wash and rinse water. Another source is the waste potable water and residue from sinks, galleys, coffeemakers and floor drains that is either drained overboard through drain masts or drained into the lavatory holding tanks. The lavatory waste water system can be either a closed system using filtered waste water containing disinfectant or an open system using potable rinse water. Either type lavatory system requires periodic drain and rinse procedures, and the closed system must be recharged with water/disinfectant.

b In a properly designed system, lavatory sink drain water quantity is negligible and proper drain maintenance (see AC Hazards of Waste Water Ice Separating from Aircraft in Flight, dated should preclude hazardous quantities of ice being formed. Potable water which is allowed to drain out can, however, become an appreciable problem unless the drain system is designed to prevent impingement on the airplane. Either the charge lines, the waste drain lines, or the waste potable drain masts may allow seepage which can form ice. This ice represents a hazard because it may break loose and strike the airplane or fall to the ground, potentially endangering people and property on the surface. This AC describes a test procedure used to determine if excessive amounts of water, which could form a hazardous quantity of ice, will impinge on airplane surfaces.

4 AC TESTS. In airplanes where water is drained through drain masts from the flight, the following technique has been used to demonstrate that no .

excessive amount of water impinges on the fuselage:

a. The areas of the airplane expected to be in reach of drained water,

including the drain mast itself, are coated with a water-soluble white compound

which is allowed to dry. One product commonly used for this purpose is available under the commercial trade name b The test solution is water containing a water-soluble, nontoxic dye.

Different colors should be used to distinguish flight conditions and sources of

impingement.

The airplane is flown in two flight conditions, one representative of

holding and one representative of cruise at altitudes where freezing is not

likely to occur before impingement. Airspeed, altitude and outside air

temperature are recorded. An additional initial approach (descent)

configuration should be tested if it is expected that a significant amount of

waste liquid (coffee, beverages, etc.) may be dumped during galley cleanup

activities.

d For each flight condition, allow the solution to drain from each

external drain mast. This be accomplished using lavatory sinks, or the

drain system may be utilized directly if the lavatories are inconvenient or not yet installed: Approximately two to three gallons of each color should be

poured at the 'most rapid rate the drain system will accommodate.

The colors that impinge on the white compound may become mixed and

difficult to identify. It may, therefore, be necessary to conduct each test on

a separate flight. Tests should be conducted in dry air because clouds or

precipitation may obscure the impingement patterns.

f After the appropriate test conditions have been flown and the airplane

has returned to the ground, the painted fuselage area is photographed for formal

documentation. An FAA certification engineer should also assess the results,

on site, as photographic evidence by itself is frequently inconclusive.

3 It is permissible to have some impingement, i.e., a light misting is

acceptable in areas where no discontinuity that could contribute to ice

accumulation exists. The results of the test should demonstrate that hazardous

quantities of ice will not accumulate.

Page 2 Par 4

' -k&T-iG, /#Y-k 5 AC SYSTEM INSTALLATION AND FAILURE CONDITIONS. The possibility exists that drain ti?%li fail, burst, plug, freeze, or overflow. Heating systems that' are installed to prevent freezing of fluid drain systems may also fail. The leakage of fluids, freezing of fluids, arcing, overheating of systems, etc., should be considered. These failures and possible secondary effects should be reviewed For compliance other sections of Part including and See those rules and associated advisory material for guidance.. .

Leroy A. Keith Manager, Aircraft Certification Division, Page 3Par 5