AC 27-1B, Chg 2 4/25/06 SUBPART D - DESIGN AND CONSTRUCTION (continued)
Page No.
LANDING GEAR
AC 27.723 Shock Absorption TestsD-47
AC 27.725 Limit Drop TestD-50
AC 27.727 Reserve Energy Absorption Drop TestD-50
AC 27.727A Reserve Energy Absorption Drop TestD-51
AC 27.729 Retracting MechanismD-51
AC 27.731 WheelsD-54
AC 27.733 TiresD-55
AC 27.735 BrakesD-56
AC 27.737 SkisD-58
FLOATS AND HULLS
AC 27.751 Main Float BuoyancyD-59
AC 27.753 Main Float DesignD-60
AC 27.755 HullsD-60
PERSONNEL AND CARGO ACCOMMODATIONS
AC 27.771 Pilot CompartmentD-62
AC 27.773 Pilot Compartment ViewD-63
AC 27.775 Windshields and WindowsD-68
AC 27.775A Windshields and WindowsD-68
AC 27.777 Cockpit ControlsD-68
AC 27.779 Motion and Effect of Cockpit ControlsD-69
AC 27.783 DoorsD-72
AC 27.783A DoorsD-74
AC 27.785 Seats, Berths, Safety Belts, and HarnessesD-74
AC 27.785A Seats, Berths, Safety Belts, and HarnessesD-78
AC 27.785B Seats, Berths, Litters, Safety Belts, and HarnessesD-80
AC 27.787 Cargo and Baggage CompartmentsD-80
AC 27.787A Cargo and Baggage CompartmentsD-82
AC 27.801 DitchingD-82
AC 27.805 Flight Crew Emergency ExitsD-91
AC 27.807 Emergency ExitsD-91
AC 27.807A Emergency ExitsD-93
AC 27.807B Emergency ExitsD-93
AC 27.831 VentilationD-94
AC 27.833 HeatersD-96
FIRE PROTECTION
AC 27.853 Compartment InteriorsD-98
AC 27.853A Compartment InteriorsD-99
AC 27.855 Cargo and Baggage CompartmentsD-99
SUBPART D - DESIGN AND CONSTRUCTION (continued)
FIRE PROTECTION (continued)
Page No.
AC 27.859 Heating SystemsD-101
AC 27.861 Fire Protection of Structure, Controls, and Other PartsD-105
AC 27.861A Fire Protection of Structure, Controls, and Other PartsD-106
AC 27.863 Flammable Fluid Fire ProtectionD-107
EXTERNAL LOAD ATTACHING MEANS
AC 27.865 External Load Attaching MeansD-109
AC 27.865A External Load Attaching MeansD-110
AC 27.865B External Load Attaching Means (previously MG 12)D-111
MISCELLANEOUS (DESIGN AND CONSTRUCTION)
AC 27.871 Leveling MarksD-133
AC 27.873 Ballast ProvisionsD-133
SUBPART E - POWERPLANT
GENERAL
AC 27.901 InstallationE-1
AC 27.901A InstallationE-5
AC 27.903 EnginesE-5
AC 27.903A EnginesE-7
AC 27.907 Engine VibrationE-9
ROTOR DRIVE SYSTEM
AC 27.917 DesignE-10
AC 27.921 Rotor BrakeE-11
AC 27.923 Rotor Drive System and Control Mechanism TestsE-12
AC 27.923A Rotor Drive System and Control Mechanism TestsE-17
AC 27.923B Rotor Drive System and Control Mechanism TestsE-18
AC 27.927 Additional TestsE-19
AC 27.927A Additional TestsE-21
AC 27.931 Shafting Critical SpeedsE-21
AC 27.935 Shafting JointsE-26
AC 27.939 Turbine Engine Operating CharacteristicsE-26
SUBPART E - POWERPLANT (continued)
FUEL SYSTEM (continued)
Page No.
AC 27.951 Fuel System - GeneralE-29
AC 27.952 Fuel System Crash ResistanceE-31
AC 27.953 Fuel System IndependenceE-56
AC 27.954 Fuel System Lightning ProtectionE-57
AC 27.955 Fuel FlowE-58
AC 27.955A Fuel FlowE-62
AC 27.959 Unusable Fuel SupplyE-64
AC 27.961 Fuel System Hot Weather OperationE-65
AC 27.961A Fuel System Hot Weather OperationE-67
AC 27.963 Fuel Tanks: GeneralE-67
AC 27.963A Fuel Tanks: GeneralE-68
AC 27.963B Fuel Tanks: GeneralE-68
AC 27.965 Fuel Tank Tests....................................................................................................E- 69
AC 27.967 Fuel Tank InstallationE-70
AC 27.969 Fuel Tank Expansion SpaceE-72
AC 27.969A Fuel Tank Expansion SpaceE-72
AC 27.971 Fuel Tank SumpE-73
AC 27.971A Fuel Tank SumpE-74
AC 27.973 Fuel Tank Filler ConnectionE-74
AC 27.973A Fuel Tank Filler ConnectionE-75
AC 27.975 Fuel Tank VentsE-76
AC 27.975A Fuel Tank VentsE-77
AC 27.975B Fuel Tank VentsE-77
AC 27.977 Fuel Tank OutletE-78
FUEL SYSTEM COMPONENTS
AC 27.991 Fuel PumpsE-80
AC 27.991A Fuel PumpsE-81
AC 27.993 Fuel System Lines and FittingsE-81
AC 27.995 Fuel ValvesE-82
AC 27.997 Fuel Strainer or Filter............................................................................................E- 82 AC 27.997A Fuel Strainer or Filter............................................................................................E -83
AC 27.999 Fuel System DrainsE-84
AC 27.999A Fuel System DrainsE-85
OIL SYSTEM
AC 27.1011 Oil System - GeneralE-86
AC 27.1013 Oil TanksE-86
AC 27.1015 Oil Tank TestsE-87
AC 27.1017 Oil Lines and FittingsE-88
SUBPART E - POWERPLANT (continued)
OIL SYSTEM (continued) Page No.
AC 27.1019 Oil Strainer or FilterE-88
AC 27.1019A Oil Strainer or FilterE-89
AC 27.1021 Oil System DrainsE-90
AC 27.1027 Transmission and Gearboxes: GeneralE-90
COOLING
AC 27.1041 Cooling - GeneralE-92
AC 27.1041A GeneralE-94
AC 27.1043 Cooling TestsE-94
AC 27.1045 Cooling Test ProceduresE-97
AC 27.1045A Cooling Test ProceduresE-98
INDUCTION SYSTEM
AC 27.1091 Air InductionE-99
AC 27.1091A Air InductionE-100
AC 27.1093 Induction System Icing ProtectionE-100
AC 27.1093A Induction System Icing ProtectionE-111
EXHAUST SYSTEM
AC 27.1121 GeneralE-113
AC 27.1123 Exhaust PipingE-114
POWERPLANT CONTROLS AND ACCESSORIES
AC 27.1141 Powerplant Controls: GeneralE-117
AC 27.1141A Powerplant Controls: GeneralE-118
AC 27.1143 Engine ControlsE-118
AC 27.1143A Engine ControlsE-119
AC 27.1143B Engine ControlsE-119
AC 27.1145 Ignition SwitchesE-120
AC 27.1147 Mixture ControlsE-120
AC 27.1151 Rotor Brake ControlsE-121
AC 27.1163 Powerplant AccessoriesE-122
POWERPLANT FIRE PROTECTION
AC 27.1183 Lines, Fittings, and ComponentsE-124
AC 27.1185 Flammable FluidsE-125
AC 27.1187 VentilationE-126
AC 27-1B, Chg 2 4/25/06 SUBPART E - POWERPLANT (continued)
POWERPLANT FIRE PROTECTION (continued)
Page No.
AC 27.1189 Shutoff MeansE-127
AC 27.1191 FirewallsE-128
AC 27.1193 Cowling and Engine Compartment CoveringE-132
AC 27.1193A Cowling and Engine Compartment CoveringE-133
AC 27.1194 Other SurfacesE-134
AC 27.1195 Fire Detector SystemsE-135
SUBPART F - EQUIPMENT
GENERAL
AC 27.1301 Function and Installation.........................................................................................F- 1
AC 27.1303 Flight and Navigation InstrumentsF-1
AC 27.1305 Powerplant InstrumentsF-7
AC 27.1305A Powerplant InstrumentsF-8
AC 27.1305B Powerplant InstrumentsF-9
AC 27.1307 Miscellaneous EquipmentF-11
AC 27.1309 Equipment, Systems, and InstallationsF-13
INSTRUMENTS - INSTALLATION
AC 27.1321 Arrangement and VisibilityF-34
AC 27.1322 Warning, Caution, and Advisory LightsF-34
AC 27.1323 Airspeed Indicating SystemF-39
AC 27.1325 Static Pressure SystemsF-40
AC 27.1327 Magnetic Direction IndicatorF-41
AC 27.1329 Automatic Pilot SystemF-41
AC 27.1335 Flight Director SystemsF-50
AC 27.1337 Powerplant InstrumentsF-51
AC 27.1337A Powerplant InstrumentsF-52
ELECTRICAL SYSTEMS AND EQUIPMENT
AC 27.1351 Electrical Systems and Equipment - GeneralF-54
AC 27.1353 Storage Battery Design and InstallationF-58
AC 27.1357 Circuit Protective DevicesF-62
AC 27.1361 Master SwitchF-64
AC 27.1365 Electric CablesF-64
AC 27.1367 SwitchesF-66
SUBPART F - EQUIPMENT (continued)
LIGHTS
Page No.
AC 27.1381 Instrument LightsF-67
AC 27.1383 Landing LightsF-67
AC 27.1385 Position Light System InstallationF-68
AC 27.1387 Position Light System Dihedral AnglesF-68
AC 27.1389 Position Light Distribution and IntensitiesF-68
AC 27.1391 Minimum Intensities in the HorizontalF-68
Plane of Forward and Rear Position Lights
AC 27.1393 Minimum Intensities in Any VerticalF-68
Plane of Forward and Rear Position Lights
AC 27.1395 Maximum Intensities In OverlappingF-68
Beams of Forward and Rear Position Lights
AC 27.1397 Color SpecificationsF-68
AC 27.1399 Riding LightF-68
AC 27.1401 Anti-collision Light SystemF-70
SAFETY EQUIPMENT
AC 27.1411 GeneralF-71
AC 27.1413 Safety BeltsF-73
AC 27.1415 Ditching EquipmentF-74
AC 27.1419 Ice ProtectionF-75
MISCELLANEOUS EQUIPMENT
AC 27.1435 Hydraulic SystemsF-97
AC 27.1457 Cockpit Voice RecorderF-99
AC 27.1459 Flight RecordersF-101
AC 27.1461 Equipment Containing High Energy RotorsF-103
SUBPART G - OPERATING LIMITATIONS AND INFORMATION
OPERATING LIMITATIONS
AC 27.1501 Operating Limitations - GeneralG-1
AC 27.1503 Airspeed Limitations: GeneralG-1
AC 27.1505 Never-Exceed SpeedG-4
AC 27.1509 Rotor SpeedG-6
AC 27.1519 Weight and Center of GravityG-8
AC 27.1521 Powerplant LimitationsG-9
AC 27.1521A Powerplant LimitationsG-10
AC 27.1521B Powerplant LimitationsG-10
AC 27-1B, Chg 2 4/25/06 SUBPART G - OPERATING LIMITATIONS AND INFORMATION (continued)
OPERATING LIMITATIONS (continued)
Page No.
AC 27.1523 Minimum FlightcrewG-11
AC 27.1525 Kinds of OperationsG-15
AC 27.1527 Maximum Operating AltitudeG-16
AC 27.1529 Instructions for Continued AirworthinessG-16
(Maintenance Manual)
AC 27.1529A Instructions for Continued AirworthinessG-20
(Maintenance Manual)
MARKINGS AND PLACARDS
AC 27.1541 Marking and Placards - GeneralG-21
AC 27.1543 Instrument Markings: GeneralG-21
AC 27.1545 Airspeed IndicatorG-25
AC 27.1547 Magnetic Direction IndicatorG-25
AC 27.1549 Powerplant MarkingsG-25
AC 27.1549A Powerplant MarkingsG-26
AC 27.1551 Oil Quantity IndicatorsG-26
AC 27.1553 Fuel Quantity IndicatorG-26
AC 27.1555 Control MarkingsG-27
AC 27.1557 Miscellaneous Markings and PlacardsG-28
AC 27.1559 Limitations PlacardG-30
AC 27.1561 Safety EquipmentG-31
AC 27.1565 Tail RotorG-32
ROTORCRAFT FLIGHT MANUAL
AC 27.1581 Rotorcraft Flight Manual - GeneralG-33
AC 27.1583 Operating LimitationsG-40
AC 27.1585 Operating ProceduresG-42
AC 27.1585A Operating ProceduresG-45
AC 27.1587 Performance InformationG-45
AC 27.1589 Loading InformationG-48
CHAPTER 3 - MISCELLANEOUS GUIDANCE (MG),
NORMAL CATEGORY ROTORCRAFT
AC 27 MG 1 Certification Procedure for Rotorcraft Avionics Equipment..............................MG 1-1 AC 27 MG 2 Standardized Test Procedure for Rotorcraft DC ..............................................MG 2-1 Electrical System Tests AC 27 MG 3 Definition of Engine Isolation Features as Applied to ......................................MG 3-1 §§ 27.79(b)(2), 27.141(b)(1), and 27.143(d)(1) AC 27 MG 4 Full Authority Digital Electronic Controls (FADEC) ..........................................MG 4-1 AC 27 MG 5 Agricultural Dispensing Equipment Installation................................................MG 5-1 AC 27 MG 6 Emergency Medical Service (EMS) Systems, Installations,.............................MG 6-1 Interior Arrangements, and Equipment AC 27 MG 7 Hour Meters or Time-in-Service Recording Devices in Rotorcraft ...................MG 7-1 AC 27 MG 8 Substantiation of Composite Rotorcraft Structure............................................MG 8-1 AC 27 MG 9 Rotorcraft One-Engine-Inoperative (OEI) Power Assurance ...........................MG 9-1 AC 27 MG 10 Advisory Material for Substantiation of Emergency .......................................MG 10-1 Flotation System AC 27 MG 11 Fatigue Evaluation of Rotorcraft Structure.....................................................MG 11-1 AC 27 MG 12 External Loads (see AC 27.865B) .................................................................MG 12-1 AC 27 MG 13 Systems Certification Considerations ............................................................MG 13-1 AC 27 MG 14 Certification Procedure for Installation of Vapor Cycle Air Conditioning ........MG 14-1 Systems AC 27 MG 15 Airworthiness Approval of Rotorcraft Health Usage Monitoring.....................MG 15-1 Systems (HUMS) AC 27 MG 16 Certification Procedure for Rotorcraft Night Vision Imaging ..........................MG 16-1 Systems (NVIS) Equipment AC 27 MG 17 (reserved) ......................................................................................................MG 17-1 AC 27 MG 18 Helicopter Terrain Awareness and Warning System (HTAWS) ....................MG 18-1
AC 27 Appendix A - Instructions for Continued Airworthiness............................................... Apdx A-1 AC 27 Appendix B - Airworthiness Guidance for Rotorcraft Instrument Flight....................... Apdx B-1 AC 27 Appendix C - (reserved) (Criteria for Category A) .....................................................Apdx C-1
AC 27-1B, Chg 2 4/25/06
FIGURES
The first digits in the figure number are the same as the related paragraph number. The digits after the hyphen are the number within the paragraph. Most figures are located at the end of the related paragraph.
Figure No. Title Page
AC 27.45-1 H-V Requirements B-19
AC 27.45-2 IGE Controllability Requirements B-20
AC 27.45-3 Shaft Horsepower vs. Turbine Outlet B-21 Temperature - Sea Level Standard Day
AC 27.45-4 Uninstalled Takeoff Power Available B-22
AC 27.45-5 Installed Takeoff Power Available, Anti-Ice Off, B-23 400 RPM
AC 27.45-6 Power Assurance Check Chart B-24
AC 27.71-1 Autorotational Characteristics - Typical B-31
AC 27.79-1 Height-Velocity Diagram B-43
AC 27.79-2 Altitude/Wei ght Accountability B-44
AC 27.175-1 Static Longi tudinal Stability B-58
AC 27.251-1 Demonstration Points B-70
AC 27.337-1 Load Factor Gross Weight Curve C-7
AC 27.351-1 Sample Yaw/Forward Speed Diagram C-12
AC 27.351-2 Safety Factors for Probability of Failure C-13
AC 27.427-1 View Looking Forward C-26
AC 27.427-2 View Looking Forward C-27
AC 27.562-1 Seat Restraint System Dynamic Tests C-47
AC 27.562-2 Schematic Floor Defo rmation Fixture; Seat Legs C-54 Attached at Floor Level
Figure No. Title Page
AC 27.562-3 Schematic Test Fixt ure; Side Wall Mounted Seat C-58
AC 27.562-4 Installation of Pe lvic-Lumbar Spine Load Cell C-62 in Part 572B Anthropomorphic Dummy
AC 27.562-5 Measurement to be Ta ken Over Full Width of C-74 Seat Bottom Cushion
AC 27.562-6 Post Test Condition C-74
AC 27.562-7 Impulse Shape C-80
AC 27.562-8 Change in Velocity C-80
AC 27.571-1 Comparison Percent of Time in Level Flight C-85
AC 27.621-1 Example of Cast ing Load Sheet Retract D-24 Actuator Support-Landing Gear
AC 27.621-2 Example of Casti ngs to be Static Tested D-26 for Model XYZ
AC 27.773-1 Cockpit Visibility D-67
AC 27.801-1 Sea State Code - World Meteorological D-90 Organization
AC 27.865B-1 U.S. Operational (Part 133) Rotorcraft-Load D-116 Combination Versus Applicable Cargo Type Data and Definition Summary
AC 27.931-1 Cantilevered Shaft, First Critical Speed E-25
AC 27.931-2 Shaft Between Support Bearings, First Critical E-25 Speed
AC 27.952-1 Static Tensi on and Shear Loading Modes E-50
AC 27.952-2 Hose Assembly Tests E-51
AC 27.952-3 Minimum Average and Individual Loads for Hose E-52 and Hose-End Fitting Combinations
AC 27.952-4 Typical Method of Breakaway Fuel Fitting Load E-53 Calculations
AC 27-1B, Chg 2 4/25/06 Figure No. Title Page
AC 27.952-5 Typical Methods of Frangible or Deformable E-54 Attachment Load Calculations, Frangible Bolts
AC 27.952-6 Typical Methods of Frangible or Deformable E-55 Attachment Load Calculations, Frangible Baffle
AC 27.955-1 Fuel Flow E-61
AC 27.1041-1 Additional Cooling Test Point E-93
AC 27.1191-1 Table of Materials and Gauges Acceptable for E-131 Fireproof Protective Devices with Flat Surface Geometries
AC 27.1329-1 Deviation Profile F-48
AC 27.1329-2 Operational Limitation F-49
AC 27.1419-1 Continuous Icing-Temper ature vs. Altitude Limits F-93
AC 27.1419-2 Intermittent Icing-Tem perature vs. Altitude Limits F-94
AC 27.1419-3 Continuous Icing-Li quid Water Content vs Drop F-95 Diameter
AC 27.1419-4 Intermittent Icing-Li quid Water Content vs. Drop F-96 Diameter
AC 27 MG 3-1 Part 29 Engine Isolation Rules MG 3-5
AC 27 MG 5-1 Acceptable Ultim ate Load Factor for MG 5-2 Agricultural Dispensing Equipment Design
AC 27 MG 5-2 Sketch of Tank Pressure Test MG 5-6
AC 27 MG 6-1 Typical Liquid Oxygen System MG 6-17
AC 27 MG 6-2 Typical Liquid Oxygen System - Using MG 6-18 Combination Valve
AC 27 MG 8-1 Schematic Diagram of Building Block Tests MG 8-16
AC 27 MG 8-2 Characterization of Impact Damage MG 8-20
Figure No. Title Page
AC 27 MG 8-3 Residual Strength vs. Time MG 8-23
AC 27- MG 8-4 Residual Str ength and Damage Size MG 8-24 Relationships for Fail-Safe Substantiation
AC 27 MG 9-1 Installed Engine Fuel Flow Capacity Check MG 9-8
AC 27 MG 11-1 Example of Variation in Time Spent in Level MG 11-7 Flight for Three Rotorcraft Types
AC 27 MG 11-2 Flight Regime to be Investigated Power-On MG 11-17 Operation
AC 27 MG 11-3 Flight Regime to be Investigated for Power-Off MG 11-17 Operation
AC 27 MG 11-4 Simplified Analytical Method for Safe Life MG 11-18 Evaluation
AC 27 MG 11-5 Typical S/N Curve for Safe Life Evaluation MG 11-18
AC 27 MG 11-6 Elements of Safe Life Determination MG 11-19
AC 27 MG 11-7 Flight Load Measurem ent Program Conditions MG 11-20 to be Investigated
AC 27 MG 11-8 Lifting Helicopt er Load Measurement MG 11-23
AC 27 MG 11-9 Example of Twin Turbine Usage Spectrum MG 11-24
AC 27 MG 14-1 Refrigeration Cycle MG 14-7
AC 27 MG 15-1 Flow Chart for Use of Mitigating Actions MG 15-8 Applied for Reduction of Software Level
AC 27 MG 15-2 Flow Chart for App lication of HUMS Specific MG 15-11 Software with a Ground Base that uses COTS Software for Operational Software
AC 27 MG 18-1 Recommended Alert Prioritization between MG 18-16 HTAWS and TCAS TA
AC 27 MG 18-2 Flight Test Matrix MG 18-19