AC 43.13-1A

Historical

Advisory circular · Acceptable Methods, Techniques, and Practices - Aircraft Inspection and Repair

A newer version is currentThis is a historical version. AC 43.13-1B CHG 1 Ed Update is the version in force, approved September 27, 2001.
Approved
January 1, 1972
Last reviewed
June 11, 2024
Cancels
AC43.13-1
Cancelled by
AC43.13-1A CHG 1
Family
AC 43.13-1 · 7 versions
Revision
A
14 CFR parts
43
Cited by
95 ADs

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 21, 2025.

Show pages 11–22
Page 23 · 150OCROpen in PDF

actual airplane performance on the runway may be used in lien of the deceleration load-speedtime schedule. An acceleration load-speed-time schedule, wherein the dynamometer flywheel is accelerated to the applicable conditions, is accept-

(b) Alternate Procedure for Reinforced-tread Tires. Qualification of a high-speed tire with a given ply rating and reinforced tread will automatically qualify a lesser ply rating reinforced tread tire of the same size and skid depth, provided :

1. The test conditions S1, RD, S2, I.

and T, are no less severe than those which are applicable to the lesser ply rating tire.

2. The ratio of the test loads, Ly to I is not less than that applicable to the lesser ply rating tire. Make any necessary adjustment in this ratio by increasing L..

(10) Optional Dynamometer Equipment. Dynamic tests may be conducted on any dynanometer test equipment which will provide the load, speed, time, and roll distance parameters of the tire.

c. Tubes. Punctured tubes may be repaired by the use of cemented or vulcanized patches.

(1) The procedure for making such repairs is substantially identical to that used in connection with repair of automobile tires:

(a) Keep the size of the patch to a minimum and avoid use of an excessive number of patches, particularly in one area, as the weight of the material may contribute to excessive wheel vibration due to the tube being out-of-balance.

(b) The use of vulcanized patches is recommended because they are considered more reliable.

(c) Reinstalled tires should be inflated, deflated, and again inflated to insure that the inner- Par 362 AC 43.13-1A CHG 1 1975 tube is not pinched. A pinched tube will chafe against the walls of the carcass and a thin spot will result in the rubber. In time, the tube wall will leak at this point. The pinching generally is due to the sticking of the tube to the carcass wall during the first inflation and the failure of the carcass to properly seat against the flange.

(d) The tube is then confined to a smaller space and wrinkling (pinching) of the tube results. Complete deflation followed by inflation allows the tube to properly accommodate itself to the carcass which should now seat itself tightly against the flanges.

*333. TIRE SUIPPAGE. To reduce the possibility of tire and tube failure due to slippage, and to provide a means of detecting tire slippage, tires should be marked and indexed with the wheel rim. Marking should be accomplished by painting a mark 1 inch in width and 2 inches in length across the tire sidewall and wheel rim. The paint used should be of a permanent type and contrasting color, such as white, red, or orange.

Preflight inspection should include a check of slippage marks for alignment. If the slippage mark is not in alignment, the aircraft should not be operated until a detailed inspection is made.

the reason determined, and if necessary the condition corrected.

334. TIRE MAINTENANCE. A program of tire maintenance can minimize tire failures and increase tire service life. Overinflation wears the center of the tread excessively, and reduces a tire's resistance to bruising, strains the tires beads, reduces traction and skid resistance. Underinflation increases deflection and may cause breakdown of the tire sidewalls. The manufacturer's recommendations should he followed to obtain maximum tire service life.

345.-349. RESERVED. * Chap 8

Page 24OCROpen in PDF

AC 43.13-1A CHG 1 .. Page 165 1975 Chapter 10. HYDRAULIC AND PNEUMATIC SYSTEMS Section 1. HYDRAULIC SYSTEMS

392. GENERAL. Maintain, service, and adjust connection fittings: AN-818 nut and AN-819 airplane hydraulic systems in accordance with sleeve.

manufacturers' maintenance manuals and pergeneral principles of maintenance and repair tinent component maintenance manuals. Certain which apply are outlined below. Tube O.D. for tightening tube nuts Wrench torque rauge (inch pounds) Minimum bend radil * Dimension in inches. * measured at inalde of bend.

(Inches)

393. HYDRAULIC LINES AND FITTINGS. Carefully 1100-H14, Alum alloy Alum. alloy 1100-114, inspect all lines and fittings at regular intervals 5052-0 Steel 5052-0 Steel to insure airworthiness. Investigate any evidence of fuid loss or leaks. Check metal lines for 80-70 leaks, loose anchorages, scratches, kinks, or other 40-05 60-30 50-90 70-120 2132 damage, Inspect fittings and connections for 75-125 90-150 leakage, looseness, cracks, burrs, or other damage. 150-250 155-250 1¾G Replace or repair defective elements. 200-350 300-400 1¾ 300-500 430-575 210

a. Replacement of Metal Lines. When inspec 500-700 550-750 28 tion shows a line to be damaged or defective, 600-900 replace the entire line or if the damaged section 600-900 3¾ is localized, a repair section may be inserted. 5 7 In replacing lines, always use tubing of the same 8 7 size and material as the original line. Use the old tubing as a template in bending the new line, FIGURE 10.1.-Tube data.

unless it is too greatly damaged, in which case a template can be made from soft iron wire. In forming fares, cut the tube ends square, file Soft aluminum tubing (1100, 3003, or 5052) smooth, remove all burrs and sharp edges, and under ¼-inch outside dinmeter muy be bent by thoroughly clean. The tubing is then flared hand. For all other tubing usa an acceptable using the correct 37° aviation flare forming tool hand or power tube bending tool. Bend tubing for the size of tubing and type of fitting. A carefully to avoid excessive flattening, kinking, double flare is used on soft aluminum tubing or wrinkling. Minimum bend radii values are ⅛-inch outside diameter and under, and a single shown in figure 10.1. A small amount of flatten- flare on all other tubing. In making the connecing in bends is acceptable but do not exceed an tions, use hydraulic fluid as a lubricant and then amount such that the small diameter of the flat- tighten. Overtightening will damage the tube tened portion is less than 75 percent of the origi- or fitting, which may cause a failure; undernal outside diameter. When installing the tightening may cause leakage which could result replacement tubing. line it up correctly with the in a system failure.

mating part so that it is not forced into line by means of the coupling nuts. CAUTION Mistaken use of 45° automotive fare forming tools will

b. Tube Connections. Many tubing connections result In improper tubing flare shape and angle causing are made using fured tube ends, and standard misfit, stress and strain, and probable system fallure.

Chap 10 Par 392

Page 25OCROpen in PDF

Page 166 AC 43.13-1A CHG 1 1975 Any excessive If the of connection fittings.

fittings.

e. O-Ring Seals. A thorough understanding of O-ring seal applications is necessary to determine when replacement must be made. The simplest application is where the O-ring merely serves as a gasket when it is compressed within a recessed area by applying pressure with a packing nut or screw cap.

Leakage is not normally acceptable in this type of installation. In other installations the O- ring seals depend primarily upon their resiliency to accomplish their sealing action. When moving parts are involved, minor seepage may be normal and acceptable. A moist surface found on moving parts of hydraulic units is an indication the seal is being properly lubricated.

In pneumatic systems, seal lubrication is provided by the installation of a grease-impreg- Par 393 * U.S.. GOVERNMENT PRINTING OFFICE: 1975-631-513/928 3-1 Chap TO

Page 26OCROpen in PDF

CHANGE AC NO: 48.18-1A CHG 1 DATE: 5/12/75

NONENT DE TRANSO ADVISORY

TED STATES OF ARE CIRCULAR

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ACCEPTABLE METHODS, TECHNIQUES, AND SUBJECT: PRACTICES-AIRCRAFT INSPECTION AND RE- PAIR

1. PURPOSE.

This change transmits new and revised material for Advisory Circular 43.13-1A.

2. PRINCIPAL CHANGES.

a. Correotions have been made to paragraph 818 and Figure 10.1.

b. Chapter 2, Section 3, has been revised to add Selective Plating in aircraft maintenance.

Chapter 4, Section 6 has been revised to add handling and care of aircraft recovered from water immersion.

c. A new Section 5, Cabin Interior Materiale Fire Protection Qualities, has been added to Chapter ?.

d. New information on tire slippage and maintenance has been added to Section 1 of Chapter 8.

3. HOW TO GET THIS PUBLICATION.

Copies of this change to AC 13.13-1A may be obtained by ordering from:

Superintendent of Documents U.S. Government Printing Office Washington, D.C. 20402 For up-to-date information on how to order, and the price of this publication, check with the closest FAA office or obtain the latest copy of Advisory Circular 00-2, Advisory Circular Checklist and Status of the Federal Aviation Regulations. This checklist may be obtained without charge by requesting from:

Department of Transportation Publications Section, TAD 443.1 Washington, D.C. 20590 Initlated by: AFS-B30 PoP Sally R. P. SKULLY, Director Flight Standards Service Initiated by:

Page 27OCROpen in PDF

PAGE CONTROL CHART Remove Pages Dated Insert Pages Dated i thru iv 1972 1972 ii thru iv 1975 78 and 74 1972 73 thru 73-3 1975 1972 127 and 128 1972 1972 128 thru 128-3 1975 139 and 140 1972 1972 140 thru 140-1 • 1975 149 and 150 1972 1972 1975 165 and 166 1972 1975 166 1972

Page 28OCROpen in PDF

AC 43.13-1A Page I 1972

TABLE OF CONTENTS Chapter 1. AIRCRAFT WOOD STRUCTURES Section 1. MATERIALS AND PRACTICES Paragraph Pape Materials Replacement of Drainholes and Skin Stiffeners

3. Control Surface Flutter Precautions

4. Gluing Precautions Б. Preparation of Wood Surfaces for Gluing ..

6. Glues

7. Mixing of Resin Glues

8. Spreading of Glue

9. Assembly Time in Gluing

10. Gluing Pressure

11. Scarf Joints

12. Splicing of Spars

13. Splicing of Box Spar Webs

14. Replacing Solid-Type Spars with Laminated Type

15. Spar Longitudinal Cracks and Local Damage

16. Elongated Holes in Spars

17. Rib Repairs

18. Plywood Skin Repair

19. Repaira to Single Curvature Plywood Skin 10

20. Repairs to Double Curvature Plywood Skin 10

21. Splayed Patch 10

22. Surface Patch 16

28. Scarf Patch

24. Plug Patches 17

25. Fabric Patch 28

26.-86. Reserved 28 Section 2. FINISHING WOOD STRUCTURES

87. General 24

88. Precautions to be Observed

89. Finiching of Interior Surfaces

40. Finishing of Exterior Surfaces

41. Finishing of End Grain Surfaces

42. Finishing with Fabric or Tape

43.-53. Reserved Chapter 2. AIRCRAFT METAL STRUCTURES Section 1. REFERENCES AND PRECAUTIONARY MEASURES

64. References

55. Flutter and Vibration Precautions

56. Brazing

57.-67. Reserved Section 2. WELDING

68. General

69. Steel Parts Not to be Welded

70. Repair of Tubular Membera

Page 29OCROpen in PDF

Page I1 AC 43.13-1A CHG 1 1975 TABLE OF CONTENTS-Continued Paragraph Page

71. Repair by Welded Sleeve 35

72. Repalr by Bolted Sleeve 85

73. Welded-Patch Repair 35

74. Splicing Tubing by Inner Sleeve Method 36

75. Splicing Tubing by Outer Sleeve Method 38

76. Splicing Using Larger Diameter Replacement Tubes 89

77. Repalrs at Built-In Fuselage Fittings .. 40

78. Engine Mount Repairs 40

79. Landing Gear Repairs 40

80. Built-Up Tubular Wing or Tall Surface Spars 47

81. Wing and Tall Brace Struts 47

82. Repairs to Welded Parts 47

83. Stainless Steel Structure 47

84.-04. Reserved 18 Section 3. METAL REPAIR PROCEDURES

95. Riveted or Bolted Steel Truas-Type Structureg 49

96. Aluminum Alloy Structures

97. Selection of Aluminum for Replacement Parts

98. Heat Treatment of Aluminum Alloy Parts

99. Riveting 51

100. Repnir Methods and Precautions for Aluminum Structure 54

101. Repairing Cracked Members 68

102. Steel and Aluminum Fittings 66

103. Castings 79 * 104. Selective Plating In Alrcraft Maintenance 73*

105.-114. Reserved 73-3 Section 4. REPAIR OF LAMINATE STRUCTURES

115. General 74

116.-126, Reserved 79 Chapter 3. FABRIC COVERING Section 1. PRACTICES AND PRECAUTIONS

127. Textile Materlals

128. Covering Practices

129. Preparation of the Structure for Covering

180. Fabric Seams -

131. Covering Methods

182. Reinforcing Tape

133. Lacing

134. Stitch Spneing so bo to

185. Surface Tape (Finishing Tape) -

180. Special Fasteners

137.-147. Reserved 91 Section 2. DOPING

148. Application of Alreraft Dope, Epoxy, and Resina 149, Blushing and Use of Blush-Retarding Thinner

150. Number of Coats

151. Technique --

152. Rejuvenation of Rahrie

158. Common Dope Troubles 151-164. Reserved

Page 30OCROpen in PDF

AC 43.13-1A CHG 1 Page Ill 1975 TABLE OF CONTENTS-Continued Paragraph Page Section 3. REPAIRS TO FABRIC COVERING

165. General 95

166. Repair of Tears in Fabric 95

167. Sewed Patch Repalr --

168. Unsewed (Doped-On) Hepairs - 90

169. Repair by a Doped-In Panel 98

170.-180. Reserved 87 Section 4. FABRIC TESTING

181. Testing of Fabric Covering - 98

182.-192. Reserved 08 Chapter 4. CONTROL CABLES AND TERMINALS Section 1. INSPECTION AND REPAIR

193. General

104. Cable Specifcations

195. Replacement of Cables

196. Mechanically Fabricated Cable Assemblies

107. Hand Fabricated Cable Assemblles

108. Cable System Inspection 107

190. Cable Tension Adjustment 110

200. Corrosion and Rust Prevention 110

201.-211. Reserved 111 Sechion 2. SAFETY METHODS FOR TURNBUCKLES

212. General

218. Double Wrap Method

214. Single Wrap Method 114

215. Special Locking Devices 114

216.-220. Reserved 114 Chapter 5. AIRCRAFT HARDWARE Section 1. IDENTIFICATION AND USE OF AIRCRAFT HARDWARE Bolte 115 Screws 117 Taper Ping (AN-385 and AN-880) 118 Nuts 119 Washers - 120

282. Types of Rivets 121

233. Material Applications 121

284. Fasteners (Cowl and Falring) 122

235. Unconventional Attachments 122 Reserved 122 Chapter 6. CORROSION PROTECTION

247. Types of Corrosion -. 123

248. Corrosion Protection Measures for Basic Materials 124

249. Construction of Corrosion Resistant Structure 126

250. Corrosion Removal - 126

251. Corroslon Proofing of Landplanes and Seaplanes 127

252. Corrosion Proofing of Landplanes Converted to Seaplanes 127

258. Cleaners, Polishes, Brighteners 128 *255-284. Regerved 254. Handling and Care of Alrcraft Recovered from Water Immersion 128-3 128*

Page 31OCROpen in PDF

Page iv AC 43.13-1A CHG 1 1975 TABLE OF CONTENTS-Continued Chapter 7. IDENTIFICATION, TESTING, AND INSPECTION

OF MATERIALS Paragraph Page Section 1. IDENTIFICATION OF METALS

205. Identificatlon of Steel Stock - 129

266. Interchangeability of Steel Tubing 129

267. Identification of Aluminum --- 129

268.-278. Reserved 181 Section 2. TESTING OF METALS

279. Hardness Testing 182 Brinell Hardness Test 182

281. Rockwell Hardness Test 182 Vickers Hardness Test 182

283. Testing Aluminum 182

284.-294. Reserved 182 Section 3. NONDESTRUCTIVE TESTING

205. General 186

298. Inspection by Magnifying Glass After Welding 136

297. Magnetic Particle Inspection 186

298. X-Ray or Radiographic Inspection 187

209. Fluorescent Penetrant 138

300. Dye Penetrants 138

801. Ultrasonic Flaw Detection 139

802.-312. . Reserved 189 Section 4. IDENTIFICATION OF FABRICS AND PLASTICS

318. Identification of Fabric 140 *

314. Identification of Plastics 140

815.-320. Reserved 140 * Section 5. CABIN INTERIOR MATERIALS, FIRE PROTECTION QUALITIES

321. Requirements for Fire Protection 140-1 322,-325. Reserved 140-1* Chapter 8. AIRCRAFT EQUIPMENT Section 1. LANDING GEAR EQUIPMENT

826. General 141

827. Inspection 141

328. Clenning and Lubricating 145

329. Emergency Systems 145

830. Speclal Inspections 145

331. Retraction Tests 145

332. Tires 145 * 333. Tire Slippage

334. Tire Maintenance

335.-343. Reserved 150 Section 2. LIFE PRESERVERS AND LIFERAFTS

844. General 151

345. Inspection Procedure for Life Preservers 151

346. Repair of Hife Preservers 151

397. Inspection Procedure for Liferafts. 151

348. Repair of Liferafts - 152

349.-359. Reserved 152

Page 32OCROpen in PDF

AC 43.13-1A CHG 1 Page iv-I 1975 TABLE OF CONTENTS-Continued Paragraph Page Section 3. MISCELLANEOUS EQUIPMENT

360. Parachutes 153

881. Safety Belts 158

862. Flares 154

363. Oxygen Systems 154

361.-874. Reserved 158

Page 33OCROpen in PDF

C 43.13-1A Page v 1972 TABLE OF CONTENTS-Continued Chapter 9. WINDSHIELDS, ENCLOSURES, AND EXITS Section 1. PLASTIC WINDSHIELDS AND ENCLOSURES Paragraph Page

975. General 159

376. Replacement Panels 159

877. Installation Procedures 159

378. Repair of Plastics 160

879. Cleaning and Polishing Transparent Plastic 161

980. Emergency Exits 161

881.-891. Reserved 164 Chapter 10. HYDRAULIC AND PNEUMATIC SYSTEMS Section 1. HYDRAULIC SYSTEMS

392. General 165

394. Hydraulic Components 393. Hydraulic Lines and Fittings 165 172

395.-405. Reserved 172 Chapter 11. ELECTRICAL SYSTEMS Section 1. CARE OF ELECTRICAL SYSTEMS

406. General 178

407. Inspection and Operation Checka . 178

408. Cleaning and Preservation 178

409. Adjustment 174

410. Insulation of Electrical Equipment . 174

411. Bus Bar Maintenance 174

412. Junction Boxes 174

418.-423, Reserved 174 Section 2. EQUIPMENT INSTALLATION

424. Electrical Load Limits 176

425. Generators 175

426. Acceptable Means of Controlling or Monitoring the Electrical Load 175

427. Inverters, Alternators, and Similar Aircraft Electrical Power Sources 176

428. Determination of Electrical Load - 178

429. Circuit Protection Devices 176

430. Switches 176

481.-441. Reserved 178 Section 3. ELECTRIC WIRE

442. General 179

448. Aircraft Electric Wire 180

444. Instructions for Use of Electric Wire Chart 181

445. Splices in Electric Wire 186

446. Open Wiring 186

447. Heat Precautions 187

448. Protection Against Chafing 187

449. Stripping Insulation 187

450. Terminals 188

451. Attachment of Terminals to Studs 188

452. Bonding Jumper Installations 188

458.-463. Reserved 198

Page 34OCROpen in PDF

Pope vi AC 43.13- TABLE OF CONTENTS-Continued Section 4. WIRE MARKING Paragraph Page

464. Wire Identification 194

465. Sleeve Selection for Identification 194

466. Identification of Wire Bundles and Harnesses 194 467-477. Reserved 195 Section 5. CONNECTORS

478. General Purpose Connectors 196

479. Types of Connectors 198

480. AN Connector Identification 196

481. Special Purpose Connector 198

482. Potting Compounds 198

483. Potting Connectors 199

484. Through Bolts 200

485. Terminal Strips 200

486.-496. Reserved 200 Section 6. CONDUITS

497. General 201

498. Size of Conduit 201

499. Conduit Fittings 201

500. Conduit Installation 201

501. Rigid Conduit 201

502. Flexible Conduit 201

508.-518. Reserved 202 Section 7. ROUTING, TYING, LACING, AND CLAMPING

614. General 208

515. Wire Bend Radii 208

516. Slack 208

517. Routing Wires 208

518. Clamping 205

619. Ties and Lacing 205

520.-580. Reserved 205 Section 8. STORAGE BATTERIES

581. General 210

582. Battery Overheat Failure 210

588. Battery Freezing 210

584. Temperature Correction 210

685. Checking Lead-Acid Batteries 210

586. Checking Nickel-Cadmium Batteries 211

587. Electrolyte Corrosion 211

588. Noxious Fumes 211

589. Installation Practices 211

540.-552. Reserved 212 Chapter 12. PROPELLERS, ROTORS, AND ASSOCIATED EQUIPMENT Section 1. INSPECTION OF PROPELLERS

568. Wood or Composition Propellers and Blades 218

554. Metal Propellers and Blades 214

555. Lubrication 214

556.-566. Reserved 214