AC 43.13-1A

Historical

Advisory circular · Acceptable Methods, Techniques, and Practices - Aircraft Inspection and Repair

A newer version is currentThis is a historical version. AC 43.13-1B CHG 1 Ed Update is the version in force, approved September 27, 2001.
Approved
January 1, 1972
Last reviewed
June 11, 2024
Cancels
AC43.13-1
Cancelled by
AC43.13-1A CHG 1
Family
AC 43.13-1 · 7 versions
Revision
A
14 CFR parts
43
Cited by
95 ADs

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 21, 2025.

Show pages 23–34
Page 35OCROpen in PDF

: 43.13-1A Page vil 72 TABLE OF CONTENTS- Continued Section 2. REPAIR OF WOOD AND COMPOSITION PROPELLERS Paragraph Page

567. General 215

668. Repair of Wood Propellers 215

569. Repair of Composition Blade 220

570. Refinishing 222

571. Propeller Balancing 222

572.-582. Reserved 222 Section 3. REPAIR OF METAL PROPELLERS 228 Steel Blades 228

585. Aluminum Propeller Repaire 228 Repair Tolerances 229 Propeller Balance 228

588. Steel Hubs and Hub Parts 280 Propeller Hub and Flange Repair 280

590. Control Systema 280

591. Deicing Systems 280

592.-602. Reserved 280 Section 4. OVERHAUL OF PROPELLERS

608. Hub and Hub Parts 282

604. Plating for Hubs and Parts 282

605. Inspection of Aluminum Propellers and Blades 282

606. Assembly 288

607.-617. Reserved 288 Section 5. ASSEMBLY OF PROPELLER TO ENGINE

618. Fixed-Pitch Propellers 284

619.-629. Reserved 284 Section 6. PRECAUTIONS

680. Blade-Tip Identification 285

631. Ground-Handling Practices 285

682. Composition Propeller Service Limits 285

688.-648. Reserved 285 Section 7. MAINTENANCE OF ROTOR BLADES

644. General 286

645.-655. Reserved 241 Chapter 13. WEIGHT AND BALANCE

656. General 248

657. Terminology 248

658. Weighing Procedure 250

659. Weight and Balance Computations 258

660. Weight and Balance Extreme Conditions 258

661. Loading Conditions and/or Placards 257

662. Equipment List 257

668. Sample Weight and Balance Report 257

664. Installation of Ballast 258

665. Loading Schedule 265

666.-676. Reserved 265

Page 36OCROpen in PDF

Page vill AC 43.13- 19 TABLE OF CONTENTS- Continued Chapter 14. ENGINES AND FUEL SYSTEMS Section 1. ENGINES Paragraph Page

677. General 267

678. inspection 267

679. Powerplant Sudden Stoppage - 267

680. Crankshafts - 269

681. Replacement Parts in Certificated Engines 289

682. Cylinder Holddown Nuts and Capscrews 270

688. Reuse of Safetying Devices 270

684. Self-Locking Nuts for Aircraft Engines and Accessories 270

685. Welding of Highly Stressed Engine Parts 271

686. Welding of Minor Engine Parte 271

687. Metallizing 271

688. Plating 271

689. Engine Accessories 272

690. Corrosion 272

691. Engine Run-In 272

692. Compression Testing of Aircraft Engine Cylinders 212

698. Spark Plugs 274

694. Ignition Harnesses 278

695. Magneto Inspection 278

696. Magneto-to-Engine Timing 280 697-707. Reserved 280 Section 2. FUEL SYSTEMS

708. General 281

709. Fuel Lines and Fittings 281

710. Fuel Tanks and Cella 282

711. Fuel Tank Caps, Vents, and Overflow Lines 282

712. Fuel Crossfeed, Firewall Shutoff, and Tank Selector Valves 288

718. Fuel Pumps 288

714. Fuel Filters, Strainers, and Drains 288

716. Indicator Systems 288

716. Turbine Fuel Systems 288

717.-727. Reserved 284 Section 3. EXHAUST SYSTEMS

728. General

729. Muffer/Heat Exchanger Failures

780. Manifold/Stack Failures 285

781. Internal Muffler Failures 285 782- Inspection 288

788. Repairs 288

784. Turbosupercharger 290

785. Augmentor Systems 290

786.-746. Reserved 290 Chapter 15. RADIO AND ELECTRONIC SYSTEMS Section 1. MAINTENANCE OF RADIO AND ELECTRONIC SYSTEMS

747. General 291

748. Maintenance of Equipment 291

749. Replacement of Components 291

760. Inspection of Installations 291

Page 37OCROpen in PDF

AC 43,13-14 Page ix 1972 TABLE OF CONTENTS- Continued Paragraph Page

751. Cleaning 291

752. Contact Cleaners 291

758. Operational Checks 292

754.-765. Reserved 292 Section 2. MAINTENANCE OF WIRING AND CABLES

766. Wiring and Cable Integrity 767- Protection from Fluids

768. Wire and Cable Clamps

769. Conduit

770. Plastic Wire Sleeving

771. Electrical Tape

772.-782. Reserved Section 3. JUNCTION BOXES AND TERMINAL STRIPS

788. Junction Boxes

784. Internal Arrangement

785. Terminal Strips

786. Pluge and Receptacles

787.-797. Reserved Section 4. POWER SOURCES AND DISTRIBUTION SYSTEMS

798. Battery Electrolyte Corrosion 285

799. Generators and Alternators 295

800. Alternator Diodes 295

801. Diode Protection 295

802. Alternator/Battery Connections 295

808. Static Electrical Power Convertera 295

804. Cleaning and Preservation 295

805. Miscellaneous Check Items 295

806. Adjustment and Repair 296

807. Electrical Switch Inspection 296

808. Radio Equipment Operation 296

809.-819. Reserved 296 Section 5. NOISE SUPPRESSION

820. General 297

821. Bonding 297

822. Shielding 297

828. Spark Plugs 297

824. Filters 297

825. Precipitation Static 297

826. Static Dischargers 297

827. Maintenance of Static Dischargers 297

828.-888. Reserved 298 Section 6. ANTENNAS

889. Fixed and Trailing Wire Antennas 299

840. Whip and Blade Antennas 299

841. Flush Mounted Antennas 299

842. Coaxial Cables and Fittings 299

843. Radomes 299

844. Radome Inspection 299

845. Radome Maintenance and Repair 800

846. Loop Antennas 800

847. Loop Quadrantal Error 800

Page 38OCROpen in PDF

Page x AC 43.13 1A 1972 TABLE OF CONTENTS Continued Paragraph Pane

848. Compensation for Quadrantal Error 800

849. Ground Calibration 801

850. Air Calibration 801

851. Calibration Points 801

852. Calibration Procedure 801

858. Calibration Data 801

854.-868. Reserved 801 Chapter 16. INSTRUMENTS Section 1. MAINTENANCE OF INSTRUMENTS General 808

865. Definition 808

866. Maintenance of Instruments 808

867. Test/Adjustment of Instruments 808

868. Replacement of Components 804

869.-879. Reserved 804 Section 2. INSPECTION AND CHECKS

880. General 805

881. Periodic Inapection 805

882. Additional Inspectiona 805

888.-899. Reserved 805 Section 3. INSTRUMENT POWER SOURCES

894. Electrical Compatibility 806

895. Vacuum Systems 806

896.-906. Reserved 806 Section 4. PITOT-STATIC SYSTEMS

907. System Components 807

908. Pitot-Static Tubes and Lines 807

909. Pressure Porta or Vents 807

910. Cleaning of System 807

911. Heater Elements 807

912. System Leak Testing 807

918. Static System Test 807

914. Pitot System Test 808

915. Precautions in Teating 308

916.-926. Reserved 808 Section 5. MECHANICAL ADJUSTMENT OF MAGNETIC DIRECTION

INDICATORS

927. Correction for Errors 809

928. Ground Swinging 809

929. Remote Gyro Compass Systems 809

980.-940. Reserved 809 Section 6. PRESERVATION AND PACKAGING

941. Preservation 810

942. Storage 810

943. Shipping 810 924-954. Reserved 810 Appendix 1. Cross Reference Table of Paragraph Number Changes 811 Appendix 2. Cross Reference Table of Illustration Number Changes 815

Page 39OCROpen in PDF

C 43,13-1A Page xi 972

LIST OF ILLUSTRATIONS Pigure Page

1.1 Tapering of Face Plates .. 1

1.2 Selection and Properties of Aircraft Wood

1.8 Consideration of Grain Direction When Making Scarf Joints 6 Method of Splicing Solid or Laminated Rectangular Spars

1.5 Method of Splicing Solid "I" Spars --

1.6 Repaira to Bullt-Up "I' Spar .. 9 1,7 Method of Splicing Box-Spar Flanges (Plate Method) 10

1.8 1.9 Method of Splicing Box-Spar Webs Method of Reinforcing a LongitudInal Crack and/or Local Damage 11 in a Solld or Internally Routed Spar .. 12

1.10 Repair of Wood Ribs 18

1.11 Typical Wing Compression Rib Repairs 14

1.12 Minimum Recommended Bend Radii for Aircraft Plywood 15

1.18 Splayed Patch 16

1.1₫ Surface Patches 18

1.15 Scarf Patches Back of Skin Accessible 19

1.16 Scarf Patches-Back of Skin Not Accessible 20

1.17 Oval Plug Patch Assembly 21

1.18 Round Plug Patch Assembly 22

2.1 Current and Polarity Selection for Inert Gas Welding 29

2.2 Specifications Guide for Welding 81

2.8 Strengths of Welded Joints 82 2,4 Members Dented at a Cluster 88

2.5 Members Dented in a Bay-Repairs by Welded Sleeve 84 2,6 Welded Patch Repair 85

2.7 Splicing by Inner Sleeve Method 86

2.8 Splicing by Outer Sleeve Method-Replacement by Welded Outside Sleeve 87

2.9 Tube Replacement at a Station by Welded Outer Sleeves 88

2.10 Splicing Using Larger Diameter Replacement Tube 89

2.11 Repairs at Built-In Fuselage Fittings 41

2.12 Streamline Tube Splice Using Round Tube (Applicable to Landing Gears) 42

2.18 Streamline Tube Splice Using Split Sleeve (Applicable to Wing and Tail Surface Brace Struts and Other Members) 48

2.14 Streamline Tube Splice Using Split Insert (Applicable to Landing Gears) 44

2.15 Streamline Tube Splice Using Plates (Applicable to Landing Gears) 45

2.16 Representative Types of Repairable and Nonrepairable Axle Assemblies 46

2.17 Recommended Radii for 90° Bends in Aluminum Alloys 50

2.18 Rivet Hole Spacing and Edge Distance for Single-Lap Sheet Splices 52

2.19 Riveting Practice and Rivet Imperfections 58

2.20 Typical Repair Method for Tubular Members of Aluminum Alloy 55

2.21 Typical Repair for Buckled or Cracked Formed Metal Wing Rib Capstripa 56 Typical Metal Rib Repaire (Usually Found on Small and Medium-Size Aircraft) 57

2.28 Typical Repairs of Trailing Edges .. 58 2-24 Typical Repairs of Stressed Sheet Metal Covering 59

2.25 Typical Stringer and Flange Splices 61

2.26 Example of Stringer Splice (Material-2017 Alloy) ₴2

Page 40OCROpen in PDF

Page xil AC 43.13-1 197 LIST OF ILLUSTRATIONS- Continued Figure Page

2.27 Application of Typical Flange Splices and Reinforcement 68

2.28 Number of Rivets Required for Splices (Single-Lap Joint) in Bare 2014-T6, 8024-18, 2024-T86, and 7075-T6 Sheet, Clad 2014-T6, 2024-T8, 2024-T96 and 7075-T6 Sheet, 2024-T4, and 7075-T6 Plate, Bar, Rod, Tube, and Extrusions, 2014-T6 Extrusions 64

2.29 Number of Rivete Required for Splices (Single-Lap Joint) in 2017, 2017 Alclad, 2024-T86 and 2024-T86 Alclad Sheet, Plate, Bar, Rod, Tube, and Extrusions - 65

2.80 Number of Rivets Required for Splices (Single-Lap Joint) in 5052 (All Hardnesses) Sheet 66

2.81 Example of Splice of Intermediate Frame (Material 2017 AL Alloy) 67

2.82 Typical Methods of Repalring Cracked Leading and Trailing Edges and Rib Intersections - 68

2.88 Typical Methods of Replacing Cracked Members at Fittinga 69

2.84 Typical Methods of Repairing Cracked Frame and Stiffener Combinations 70

2.85 Typical Repairs to Rudder and to Fuselage at Tail Post 71

2.86 Typical Methods of Repairing Elongated or Worn Bolt Holes 72

2.87 Typical Laminate (Facing) Repair 74 2,88 Typical Core and Facing Repair - 75

2.89 Typical Stepped Joint Repair 75

2.40 Typical Scarfed Joint Repair 78

2.41 Typical One Side Blind Repair 76

2.42 Typical Metal Facing Patch

2.48 Typical Types of Core Replacement 78

2.44 Typical Undercut Core Material Cavity 78

8.1 Textile Fabric Used in Aircraft Covering 88

3.2 Miscellaneous Textile Materials 84

8.8 Typical Methods of Attaching Fabric 85

3.4 Standard Knot for Rib Lacing and Terminating a Sewed Seam (Modified Seine Knot) 86

8.6 Splice Knot 87

3.6 Starting Stitch for Rib Stitching 88

8.7 Standard Double Loop Lacing 89

8.8 Standard Knot for Double Loop Lacing 90

8.9 Fabric Attachment Spacing 91

3.10 Repair of Tears in Fabric 95

4.1 Cable Cross Section 99

4.2 Strength of Steel Cable 100

4.8 Straight-Shank Terminal Dimensiona 101

4.4 Insertion of Cable into Terminal 101

4.5 Gauging Terminal Shank After Swaging 101

4.6 Typical Cable Splices 102

4.7 Typical Terminal Gauge 102

4.8 Copper Oval Sleeve Data 108

4.9 Typical Thimble-Eye Splice 108

4.10 Copper Stop Sleeve Data 104

4.11 Typical Terminal Gauge 104

4.12 Preparation of a Woven Cable Splice 106

4.18 Preparation of a Wrapped Soldered Terminal 108

4.14 Cable Inspection Technique 107

4.15 Cable Wear Patterns .- 107

4.16 Worn Cable (Replacement Necessary) 108

4.17 Worn Cable (Replacement Recommended) 108

4.18 Internal Cable Wear 108

4.19 Corrosion 109

4.20 Manufacturer's Wire Splice 109

4.21 Pulley Wear Patterns 110

Page 41OCROpen in PDF

AC 43.13-1A Page xill 1972 LIST OF ILLUSTRATIONS- Continued Figure Page 4,22 Turnbuckle Safetying Guide 112

4.28 Safetying Turnbuckles 118

4.24 Clip Type Locking Device 114

5.1 Bolt Indentification 116

5.2 Recommended Torque Values For Nut-Bolt Combinations-(without lubrication) . 118

5.8 Torque Wrench With Various Adapters 119

7.1 Numerical System for Steel Identification 129

7.2 Basic Temper Designationa and Subdivisions for Aluminum Alloys 180

7.8 Rockwell C Scale Steel Hardneas Numbers Comparison Table 188 7,4 Hardness Values for Aluminum Alloys 182

7.5 Maximum Recommended X-Ray Kilovolts 188

8.1 Typical Bolt Cracks 141

8.2 Typical Cracke Near Boltholes 142

8.8 Typical Bolthole Cracka 142

8.4 Typical Rod-End Cracks 142

8.5 Typical Torque Tube Bolthole Elongation 142 8,6 Aircraft Tire Types and Ratings 146

8.7 Oxygen Cylinder Damage 155

8.8 Cylinder Brackets and Clamps 156

9.1 Stop-Drilling Cracks 160

9.2 Surface Patches 160

9.8 Plug Patch Repair 161

10.1 Tube Data 165

10.2 Hose Assembly Instructions 167

10.8 Aircraft Hose Specificationa 168

10.4 Proper Hose Installations 169

10.5 Minimum Bend Radif 170

10.6 Ball Diameters for Testing Hose Restrictions or Kinking 171

10.7 Suggested Handling of Preformed Hose 171

10.8 Minimum Bend Radil-Teflon Hose 172

11.1 Wire and Circuit Protector Chart 177

11.2 Switch Derating Factors 177

11.8 Examples Determining Voltage Drop from Electric Wire Chart (Fig. 11.7) 179

11.4 Examples Determining Voltage Drop from Electric Wire Chart (Fig. 11.7) 179

11.5 Copper Electric Wire Current Carrying Capacity 180

11.8 Aluminum Electric Wire Current Carrying Capacity 180

11.7 Electric Wire Chart 182

11.78 Wire Used in Aircraft Installations 188

11.8 Staggered Splices in Wire Bundle 186

11.9 Cable Clamp at Bulkhead Hole 187

11.10 Cable Clamp and Grommet at Bulkhead Hole 187

11.11 Allowable Nicked or Broken Strands .. 188

11.12 Stud Bonding or Grounding to Flat Surface 189

11.18 Plate Nut Bonding or Grounding to Flat Surface 190

11.14 Bolt and Nut Bonding or Grounding to Flat Surface 191

11.15 Copper Jumper Connection to Tubular Structure 192

11.16 Bonding Conduit to Structure 192

11.17 Aluminum Jumper Connection to Tubular Structure 192

11.18 Sizes of Identification Sleeving 104

11.19 Identification of Wire Bundles and Harnesses 195

11.20 AN Connectors 107

11.21 Classes of AN Connectors 187

11.22 AN Connector Marking .. 198

11.28 Spare Wires for Potting Connector 199

11.24 Bend Radil for Rigid Conduit 201

Page 42OCROpen in PDF

Page xiv AC 43.19-1 197 LIST OF ILLUSTRATIONS- Continued Pioure Page

11.25 Minimum Bending Radii for Flexible Aluminum or Brass Conduit 202

11.26 Group and Bundle Ties 208

11.27 Comb for Straightening Wires in Bundles 208

11.28 Slack Between Supports 204

11.29 Drainage Hole in Low Point of Tubing 204

11.80 Separation of Wires from Plumbing Lines 205

11.81 Safe Angle for Cable Clamps .. 206

11.82 Typical Mounting Hardware for MS-21919 Cable Clamps 206

11.88 Installing Cable Clamp to Structure - 207

11.84 Installing Cable Clamps to Tubular Structure 207

11.85 Single Cord Lacing 208

11.86 Double Cord Lacing 209

11.87 Making Ties.. 209

11.88 Lead-Acid Battery Electrolyte Freezing Points 210

11.89 Sulfuric Acid Temperature Correction 211

12.1 Propeller Repair by Addition of Small Inlay 217

12.2 Method of Repairing Surface Cracks, Nicks, etc., on Aluminum Alloy Propellers 224

12.8 Correct and Incorrect Method of Reworking Leading Edge of Aluminum Alloy Propellers 225

12.4 Repair Limits to Blade Section Width and Thickness for Aluminum Alloy Propellers 226

12.5 Method of Repairing Damaged Tip of Aluminum Alloy Propellers 227

12.6 Protractor and Method of Measuring Angle of Bend in Aluminum Alloy Propellers 228

12.7 Repair of Fixed-Pitch Hub and Propeller With Elongated or Damaged Boltholes 281

12.8 Blade Leading Edge and Trim Tab 287

12.9 Blade Bonding and Crack Location 288

12.10 Blade Damage Location 288

12.11 Blade Cross-Section 289

12.12 Blade Retention and Link Attach Points 240

18.1 Typical Datum Locations 244

18.2 Illustration of Arm (or Moment Arm) 245

18.8 Example of Moment Computation . 246

18.4 Empty Weight Center-of-Gravity Formulas 247

18.5 Empty Welght and Empty Weight Center-of-Gravity-Tail-Wheel Type Aircraft - 248 18,6 Empty Weight and Empty Weight Center-of-Gravity--Nose-Wheel Type Aircraft 249

18.7 Operating Center-of-Gravity Range 250

18.8 Weighing Point Centerline 251

18.9 Empty Weight and Empty Weight Center-of-Gravity When Aircraft is Weighed With Oil 252

18.10 Example of Check of Most Forward Weight and Balance Extreme 254

18.11 Example of Check of Most Rearward Weight and Balance Extreme 255

18.12 Loading Conditions: Determination of the Number of Passengers and Baggage Permissible with Full Fuel 256

18.18 Loading Conditions: Determination of the Fuel and Baggage Permissible with Maximum Passengers 258

18.14 Loading Conditions: Determination of the Fuel and the Number and Location of Passengers Permissible with Maximum Baggage 259

18.15 Effects of the Addition of Equipment Items on Balance 260

18.16 Example of Moment and Weight Changes Resulting from Equipment Changes 261

18.17 Sample Welght and Balance Report To Determine Empty Weight Center-of-Gravity 262

Page 43OCROpen in PDF

C 43.13-14 Page xY 973 LIST OF ILLUSTRATIONS- Continued Pinurs Page

18.18 Sample Weight and Balance Report Including an Equipment Change for Aircraft Fully Loaded 268

13.19 Permanent Ballast Computation Formula 264

14.1 Schematic of Typical Differential Pressure Compression Tester 278

14.2 Spark Plug Heat Ranges 214

14.8 Spark Plug Reach 275

14.4 Method of Checking Spark Plug Gap . 275

14.58 Typical Carbon Fouled Spark Plug . 276

14.5b Typical Lead Fouled Spark Plug 276

14.бе Typical Oil Fouled Spark Plug 276

14.6а Typical Eroded Spark Plug 277

14.6b Typical Spark Plug With Copper Runout 277

14.7 Typical Spark Plug With Bridged Electrodes 277

14.8 Spark Plug Well Flashover 278

14.9 Typical Method of Clamping Leads 278

14.10 Normal Contact Point -- 279

18.11 Point With Minor Irregularities 279

14.12 Point With Well-Defined Mound 279

14.18 Location of Clamps at Tube Bends 281

14.14 Typical Muffler Wall Fatigue Failure at Exhaust Outlet 285

14.15 Typical Muffer Wall Failure .. 286

14.16 Typical Muffler Wall Fatigue Failure 286

14.17 Typical Fatigue Failure of Muffler End Plate at Stack Inlet 287

14.18 Section of Muffler Showing Typical Internal Baffle Fallure 287

14.19 Loose Pieces of Failed Internal Baffle .. 287 14,20 Failed Internal Baffle Partially Obstructing Muffler Outlet 288

14.21 Failed Internal Baffle Completely Obstructing Muffer Outlet 288

14.22a Example of Exhaust Outlet Guard ... 288

14.22b Example of Exhaust Outlet Guard Installed 289

14.28 Effect of Improperly Positioned Exhaust Pipe/Muffler Clamp 289

14.24 Primary Inspection Areas 290

Page 44OCROpen in PDF

AC 43.13-1A Page 1 1972 Chapter 1. AIRCRAFT WOOD STRUCTURES Section 1. MATERIALS AND PRACTICES

1. MATERIALS. Three forms of wood are commonly used in aircraft: solid wood, plywood, and laminated wood. Although several kinds of modified wood are sometimes used for special purposes, these three forms constitute the bulk of all wood aircraft construction materials.

a. Quality of Wood. All wood and plywood used in the repair of aircraft structures should be of aircraft quality. Figure 1.2 fists the permissible variations in characteristics and properties of aircraft wood.

bracing and checking or splitting of wood members.

A few suggestions for minimizing these shrinkage effects are:

(1) Use bushings that are slightly short so that when the wood member shrinks the bushings do not protrude and the fittings may be tightened firmly against the member.

(2) Gradually drop off plywood face plates either by feathering or by shaping as shown in figure 1.1.

b. Species Substitution. The species used to repair a part should be the same as that of the original whenever possible; however, permissible substitutes are given in figure 1.2.

c. Effects of Shrinkage. When the moisture content of wood is lowered, its dimensions decrease. The dimensional change is greatest in a tangential direction (across the fibers and parallel to the growth rings), somewhat less in a radial direction (across the fibers and perpendicular to the growth rings), and is negligible in a longitudinal direction (parallel to the fibers). These dimensional changes can have several detrimental effects upon a wood structure, such as loosening of fittings and wire

2. REPLACEMENT OF DRAINHOLES AND SKIN STIF- FENERS. Whenever repairs are made that require replacing a portion that includes drainholes, skin stiffeners, or any other items, the repaired portion must be provided with similar drainholes, skin stiffeners, or items of the same dimensions in the same location. Reinforcing, under skin repairs, that interferes with the flow of water from some source, such as inspection holes, is to be provided with drainholes at the lowest points.

3. CONTROL SURFACE FLUTTER PRECAUTIONS.

When repairing control surfaces, especially on high-performance airplanes, care must be exer-

FEATHERED END/ SPADED END- FIGURE 1.1.-Tapering of face plates.

Chap 1 Par 1

Page 45OCROpen in PDF

Page 2 AC 43.13-1A 1972 FIGURE 1.2.—Selection and properties of aircraft wood.

Maximum utrength permisaible Species of wood properties as compared to ation (alope Frain devi- Remarks spruce of grain) Spruce (Picea) Sitka (P. Bit- 100% 1:15 Excellent for all us. Considered as standchensle) Red (P. Bubra) ard for this table.

White (P. Glauce).

Douglas Fir (Paeudotsuga Taxi- Exceeds spruce 1:16 May be need as substitute for spruce in same folia). sizes or in alightly reduced sizes providing reductions are substantiated. Difficult to work with hand tools. Some tendency to split and splinter during fabrication and considerable more care in manufacture is necessary. Large solid pleces should be avoided due to Inspection difficulties. Gluing satisfactory.

Noble Fir (Ables Noblies) - Slightly exceede spruce 1:15 Satlafactory characteristics with respect to except 8 percent workability, warping, and splitting. May be deficient in shear. used as direct substitute for spruce In same sizes providing shear does not become critical.

Hardness somewbat less then spruce. Gluing satisfactory.

Western Hemlock (Truga Het- Slightly exceeds spruce 1:15 Less uniform in texture than spruce. Afay be eropbylia). used as direct substitute for spruce. Upland growth superior to lowland growth. Gluing satisfactory.

Pine, Northern White (Pinus Properties hetween 85 1:15 Excellent working qualities and uniform in Strobus). percent and 96 per- propertles but somewhat low in hardness and cent those of spruce. abock-resisting capacity. Cannot be used as substitute for spruce without increase in sizes to compensate for lesser strength. Gluing satisfactory.

White Cedar, Port Oxford Exceeds spruce - (Charaecyparla Lawsoniana).

1:15 Nay be used as substitute for spruce In same sizes or in slightly reduced sizes proriding reductione are substantiated. Easy to work with band toola. Gluing difficult but satistactory joints can be obtained if suitable precau tlone are taken.

Poplar, Yellow (Lirlodendron Slightly leas than 1:15 Excellent working qualities. Should not be Tulipifera). spruce except in used as a direct aubstitute for spruce without compression (crush- carefully accounting for slightly reduced ing) and shear. strength properties. Somewhat low in shockresisting capacity. Gluing satisfactory.

(Bee notes follosoing table.)

Notes for Agure 1.2.

1. Defeots Permitted.

a. Oross grain. Spiral grain, diagonal grain, or a combination of the two is acceptable providing the grain does Par 3

Page 46OCROpen in PDF

AC 43.13-1A Page 3 1972 not diverge from the longitudinal axis of the material more than specifed in column 8. A check of all four faces of the board is necessary to determine the amount of divergence. The direction of free-flowing ink will frequently assist in determining grain direction.

b. Wacy, ourly, and interlocked grain. Acceptable, if local irregularities do not exceed limitations specifed for spiral and diagonal grain.

c. Eard knots. Sound bard knots up to ¼-inch In maximum diameter are acceptable prorlding: (1) they are not in projecting portions of I-beams, niong the edges of rectangular or beveled unrouted beams, or along the edges of manges of box beams (except in lowly stressed portions); (2) they do not cause grain divergence at the edges of the board or in the fanges of a beam more than specifed in column 8; and (B) they are in the center third of the beam and are not closer than 20 inches to another knot or other defect (pertains to %-inch knots-smaller knots may be proportionately closer). Knote greater than ¾-inch must be used with caution.

d. Pin knot olusters. Small clusters are acceptable providing they produce only a small effect on grain direction.

e. Pitoh pookots. Acceptable, in center portion of a beam providing they are at least 14 inches apart when they lie in the same growth ring and do not exceed 1½ inch length by %-inch width by ⅛-inch depth and providing they are not along the projecting portions of I-beams, along the edges of rectangular or beveled unronted beams, or along the edges of the flanges of box beams.

f. Afineral streaks. Acceptable, providing careful inspection falls to reveal any decay.

2. Defects Not Permitted.

a. Cross grain. Not acceptable, unless within limitations noted in 1a.

D. Wavy, curly, and interlocked grain. Not acceptable, unless within limitatlons noted in 1b.

c. Hard knots. Not acceptable, unless within limitations noted in 1c.

d. Pin knot oluaters. Not acceptable, If they produce large effect on grain direction.

e. Spike knots. These are knots running completely through the depth of a beam perpendicular to the annual ringe and appear most frequently in quartersawed lumber. Reject wood containing this defect.

1. Pitch pockets. Not acceptable, unless within limitations noted in le.

g. fineral streaks. Not acceptable. If accompanied by decay (see 1f).

b. Checks, shakes, and aplits. Checks are longitudinal cracks extending, in general, across the annunl rings.

Shakes are longitudinal cracks usually between two annual rings. Splits are longitudinal cracks induced by artificially induced stress. Reject wood containing these defects.

1. Compression cood. This defect is very detrimental to strength and is difficult to recognize readily. It la characterized by high specific gravits; has the appenrance of an excessive growth of summer wood; and in inost species shows but little contrast in color between epring wood and summer wood. In doubtful cases reject the material, or subject samples to a tonghness machine test to establish the quality of the wood. Reject all materlal containing compression mood.

j. Compressio» failures. This defect ia caused from the wood belng overstressed in compresslon due to natural forces during the growth of the tree, felling trees on rough or irregular ground, or rough handling of logs or lnmber.

Compression failures are choracterized by a buckling of the fbers that appear as streaks on the surface of the piece substantially at right angles to the grain, and rary from pronounced fallures to very fine hairlines that require close inspection to detect. Reject wood containing obvious failures. In doubtful cases reject the wood, or make a further inspection in the form of microscopic examination or toughness test, the latter means being the more rellable.

k. Decay. Examine all stains and discolorations carefully to determine whether or not ther are harmless, or in a stage of preliminary or advanced decay. All pleces must he free from rot, dote, red heart, purple heart, and all other cised that the repairs do not involve the addition of weight aft of the hinge line. Such a procedure may adversely disturb the dynamic and static balance of the surface to a degree which would induce flutter. As a general rule, it will be necessary to repair control surfaces in such a manner that the structure is identical to the original so that the weight distribution and resulting mass balance are not affected in any way.

4. GLUING PRECAUTIONS. Satisfactory glue Chap 1 joints in aircraft will develop the full strength of wood under all conditions of stress. To produce this result, the gluing operation must be carefully controlled so as to obtain a continuous, thin, uniform film of solid glue in the joint with adequate adhesion to both surfaces of the wood. Some of the more important conditions involve:

o. Properly prepared wood surfaces.

b. Glue of good quality, properly prepared.

c. Good gluing technique.

Par 3