AD 2005-15-07

Historical

Airworthiness directive · Electrical cables of the S routes · Airbus A320-111, A320-211, A320-212 and 4 more

Effective
August 30, 2005
Published
July 26, 2005 · 70 FR 43024–43025
Issued
July 13, 2005
Superseded by
AD2016-19-02
Models
A320-111, A320-211, A320-212, A320-214, A320-231, A320-232, A320-233
Data sheet
TCDSA28NM
Registered aircraft
563 matched by model
Product
Aircraft · Large airplane
Amendment
39-14196
Docket
FAA-2005-21023
Project
2004-NM-262-AD
Issued as
Final rule

Unofficial copy from the Federal Register XML, document 05-14391. Only the govinfo PDF is the legal edition. DRS record last changed August 7, 2025.

On this page

Summary

The FAA is adopting a new airworthiness directive (AD) for certain Airbus Model A320-111 airplanes and Model A320-200 series airplanes. This AD requires installing insulator and cable ties to the electrical cables of the S routes at the gaps in the raceway in the wing trailing edge and the wing tip and wing root areas. This AD results from fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent injection of high voltage current into the low voltage wiring that passes through the fuel tanks, which could result in a possible fuel tank explosion.

The airworthiness directive

2005-15-07 Airbus: Amendment 39-14196. Docket No. FAA-2005-21023; Directorate Identifier 2004-NM-262-AD.

(a) Effective Date

PDF page 2

(a) This AD becomes effective August 30, 2005.

(b) Affected ADs

PDF page 2

(b) None.

Applicability: (c) This AD applies to Airbus Model A320-111 airplanes; and Model A320-211, -212, -214, -231, -232, and -233 airplanes; certificated in any category; except those modified in production by Airbus Modification 22626.

(d) Unsafe Condition

PDF page 2

(d) This AD was prompted by the results of fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent injection of high voltage current into the low voltage wiring that passes through the fuel tanks, which could result in a possible fuel tank explosion.

Compliance: (e) You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.

(f) Modification

PDF page 2

(f) Within 60 months after the effective date of this AD, install insulator and cable ties to the electrical cables of the S routes at the gaps in the raceway in the wing trailing edge and the wing tip and wing root areas, in accordance with Airbus Service Bulletin A320-24-1062, Revision 05, dated June 27, 2002.

(g) Alternative Methods of Compliance (AMOCs)

PDF page 2

(g) The Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19.

(h) Related Information

PDF page 2

(h) French airworthiness directive F-2004-173, dated October 27, 2004, also addresses the subject of this AD.

(i) Material Incorporated by Reference

PDF page 2

(i) You must use Airbus Service Bulletin A320-24-1062, Revision 05, dated June 27, 2002, to perform the actions that are required by this AD, unless the AD specifies otherwise. The Director of the Federal Register approved the incorporation by reference of this document in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Contact Airbus, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex, France, for a copy of this service information. You may review copies at the Docket Management Facility, U.S. Department of Transportation, 400 Seventh Street SW., Room PL-401, Nassif Building, Washington, DC; on the internet at http://dms.dot.gov; or at the National Archives and Records Administration (NARA). For information on the availability of this material at the NARA, call (202) 741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

Rule preamble

The FAA’s background, reasoning and cost estimate, published with the AD.

DatesPage 1

Effective August 30, 2005.

The Director of the Federal Register approved the incorporation by reference of a certain publication listed in the AD as of August 30, 2005.

AddressesPage 1

You may examine the AD docket on the Internet at http://dms.dot.gov or in person at the Docket Management Facility, U.S. Department of Transportation, 400 Seventh Street SW., Nassif Building, Room PL-401, Washington, DC.

Contact Airbus, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex, France, for service information identified in this AD.

For further information contactPage 1

Tim Dulin, Aerospace Engineer, International Branch, ANM-116, FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (425) 227-2141; fax (425) 227-1149.

Examining the DocketPage 1

You may examine the AD docket on the Internet at http://dms.dot.gov or in person at the Docket Management Facility office between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The Docket Management Facility office (telephone (800) 647-5227) is located on the plaza level of the Nassif Building at the street address stated in the ADDRESSES section.

DiscussionPage 1

The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to include an AD that would apply to certain Airbus Model A320-111 airplanes and Model A320-200 series airplanes. That NPRM was published in the Federal Register on April 21, 2005 (70 FR 20724). That NPRM proposed to require installing insulator and cable ties to the electrical cables of the S routes at the gaps in the raceway in the wing trailing edge and the wing tip and wing root areas.

CommentsPage 1

We provided the public the opportunity to participate in the development of this AD. We have considered the comment that has been received on the NPRM.

Support for the Proposed ADPage 1

One commenter supports the NPRM.

Explanation of Change to ApplicabilityPage 1

We have revised the applicability of this AD to identify model designations as published in the most recent type certificate data sheet for the affected models.

ConclusionPage 1

We have carefully reviewed the available data, including the comment that has been received, and determined that air safety and the public interest require adopting the AD with the change described above.

Costs of CompliancePage 2

This AD affects about 54 airplanes of U.S. registry. The actions take about 35 work hours per airplane, at an average labor rate of $65 per work hour. Required parts cost about $0 per airplane. Based on these figures, the estimated cost of the AD for U.S. operators is $122,850, or $2,275 per airplane.

Authority for This RulemakingPage 2

Title 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. Subtitle VII, Aviation Programs, describes in more detail the scope of the Agency's authority.

We are issuing this rulemaking under the authority described in subtitle VII, part A, subpart III, section 44701, “General requirements.” Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action.

Regulatory findingsPage 2

We have determined that this AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.

For the reasons discussed above, I certify that this AD:

(1) Is not a “significant regulatory action” under Executive Order 12866;

(2) Is not a “significant rule” under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and

(3) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.

We prepared a regulatory evaluation of the estimated costs to comply with this AD and placed it in the AD docket. See the ADDRESSES section for a location to examine the regulatory evaluation.

Adoption of the amendmentPage 2

Accordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows:

1. The authority citation for part 39 continues to read as follows:

2. The Federal Aviation Administration (FAA) amends § 39.13 by adding the following new airworthiness directive (AD):

Affected TCDS · 1

The type certificate data sheets for the models this AD names, matched by model and maker.

Registered aircraft · 563

Registered aircraft whose airframe or engine model this AD names. Matched by model only, so check each against the AD’s applicability.

By aircraft maker
  • Airbus377 aircraft
  • Airbus Industrie184 aircraft
  • Airbus S A S2 aircraft
By year built
19912019
Registered aircraft by year built: 525 aircraft
19913
199213
19938
19941
19954
19967
19978
199825
199932
200035
200136
200225
200319
200418
200518
200625
200720
200820
200920
201017
201126
201232
201329
201419
201522
201614
201716
201811
20192

38 with no year recorded