Unofficial copy from the Federal Register XML, document E6-17941. Only the govinfo PDF is the legal edition. DRS record last changed May 30, 2024.
Copies of the files this page was built from, with their SHA-256. Retrieved October 18, 2026.
| File | Size | SHA-256 | Original |
|---|---|---|---|
| Official PDF | 155 KB | d765c316…917a3b9 | E6-17941.pdf on govinfo.gov |
| Federal Register XML | 26 KB | 4ccc5ae6…0a28a84 | E6-17941.xml on federalregister.gov |
| FAA DRS HTML attachment | 78 KB | fe368765…e65aed8 | FAA DRS (API key needed) |
| FAA DRS PDF | 67 KB | 16b3483c…9b9afec | FAA DRS (API key needed) |
On this page
Summary
The FAA is adopting a new airworthiness directive (AD) for certain Boeing Model 747 airplanes. This AD requires repetitive mid- and low-frequency eddy current inspections for cracks in the overlapped skin panels in the fuselage skin lap joints in sections 41, 42, 44, and 46, and corrective actions if necessary. This AD results from a report indicating that an operator found multiple small cracks in the overlapped skin panels in the fuselage skin lap joints. We are issuing this AD to detect and correct cracks in the overlapped skin panels, which could join together and result in reduced structural capability in the skin and consequent rapid decompression of the airplane.
Rule preamble
The FAA’s background, reasoning and cost estimate, published with the AD.
DatesPage 1
This AD becomes effective December 1, 2006.
The Director of the Federal Register approved the incorporation by reference of a certain publication listed in the AD as of December 1, 2006.
AddressesPage 1
You may examine the AD docket on the Internet at http://dms.dot.gov or in person at the Docket Management Facility, U.S. Department of Transportation, 400 Seventh Street, SW., Nassif Building, Room PL-401, Washington, DC.
Contact Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington 98124-2207, for service information identified in this AD.
For further information contactPage 1
Ivan Li, Aerospace Engineer, Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 917-6437; fax (425) 917-6590.
Examining the DocketPage 1
You may examine the airworthiness directive (AD) docket on the Internet at http://dms.dot.gov or in person at the Docket Management Facility office between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The Docket Management Facility office (telephone (800) 647-5227) is located on the plaza level of the Nassif Building at the street address stated in the ADDRESSES section.
DiscussionPage 1
The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to include an AD that would apply to certain Boeing Model 747 airplanes. That NPRM was published in the Federal Register on March 14, 2006 (71 FR 13055). That NPRM proposed to require repetitive mid- and low-frequency eddy current inspections for cracks in the overlapped skin panels in the fuselage skin lap joints in sections 41, 42, 44, and 46, and corrective actions if necessary.
CommentsPage 1
We provided the public the opportunity to participate in the development of this AD. We have considered the comments received.
Support for the NPRMPage 1
Boeing supports the NPRM as proposed.
Request to delay final rule pending new service informationPage 1
Japan Airlines (JAL) states that Boeing Alert Service Bulletin 747-53A2501, dated March 24, 2005, which was referenced as the appropriate source of service information for accomplishing the actions proposed in the NPRM, contains various errors and omissions. For example, the alert service bulletin does not have inspection procedures for certain internal structural details that cover the lap, and there is no inspection procedure specific to the Boeing Model 747-400 converted freighter. JAL would like us to delay issuing the final rule until Boeing has revised the alert service bulletin.
We partially agree with JAL. We agree that there are details and configurations that could be changed in future revisions of the alert service bulletin. The issues JAL mentions would require an alternative method of compliance (AMOC) to the inspection instructions as given in the original issue of the alert service bulletin. Operators may request an AMOC in accordance with the procedures in paragraph (j) of the final rule. We disagree that we should delay the final rule until Boeing revises the alert service bulletin. We have identified an unsafe condition, and delaying issuance of the final rule until Boeing revises its service information would result in an unwarranted delay of the inspections that are intended to address that unsafe condition. We have not changed the final rule in this regard.
Request to revise inspection thresholdPage 1
Air Transport Association (ATA), on behalf of its member Northwest Airlines (NWA), requests that we allow the initial inspection to occur within 3,000 flight cycles after the most recent Supplemental Structural Inspection Document (SSID) inspection for items F-25K, F-25L, and F-25M in Boeing SSID D6-35022.
We disagree with the commenters. The SSID program is an exploratory inspection program. The inspection intervals in the SSID were derived from required damage tolerance ratings (DTRs) that were based on “fleet crack” criteria. This means that at the time the DTRs were developed, there was no known cracking in the area; therefore, the required DTRs could remain at a lower level until cracking was discovered. However, operators subsequently found cracking in certain lap joint lower skins, and Boeing issued Alert Service Bulletin 747-53A2501 to detect and correct this cracking. The required DTRs that drive the thresholds and intervals were developed using “first crack” criteria, which is higher than “fleet crack” criteria. “First crack” criteria must detect cracking that is known to have occurred on other airplanes and, therefore, cannot rely on a worldwide fleet of airplanes as a statistical sample group.
The inspection specified in Boeing Alert Service Bulletin 747-53A2501 is an internal medium frequency eddy current (MFEC) inspection, which is able to detect a crack size smaller than that detectable by the external low frequency eddy current (LFEC) inspection required by the SSID program. Both inspection techniques are used to detect cracks on the outer surface of the lower skin panel at the lower row of fasteners of the lap splice. However, the LFEC inspection looks through the upper skin panel; the MFEC technique uses a probe that is in direct contact with the lower skin panel on the inner surface. Therefore, a 3,000-flight-cycle repetitive interval using an LFEC method does not provide the same level of certainty as a 3,000-flight-cycle repetitive inspection using the MFEC method.
We have not changed the final rule in this regard.
Request To Change Costs of CompliancePage 2
ATA, on behalf of NWA, also requests that we change the costs of compliance. NWA states that it has determined that approximately 120 work hours would be required to accomplish the non-destructive test procedures specified in Boeing Alert Service Bulletin 747-53A2501. The NPRM gives a cost estimate of 68 hours to do this task. NWA states that it is worth noting that if the inspection has to be performed independent of other major fuselage internal inspections, then over 1,000 additional hours of access and restoration labor will be required. NWA states that this scenario is likely if the initial inspection is required independent of the SSID or fuselage fatigue inspection programs. The 1,000-flight-cycle initial inspection threshold could prompt such a scenario.
We disagree with the request to change the costs of compliance. The 68 work-hour estimate represents the time necessary to perform only the action actually required by the AD. The action in the NPRM reflects only the direct costs of the specific required action (inspection) based on the best available data from the manufacturer. The cost analysis in AD rulemaking actions typically does not include incidental costs such as the time required to gain access and close up, time necessary for planning, or time necessary for other administrative tasks. Those incidental costs, which may vary significantly among operators, are almost impossible to calculate. We have not changed the final rule in this regard.
Request to revise compliance timePage 2
ATA also recommends that we align the compliance period for the non-destructive test procedures specified in Boeing Alert Service Bulletin 747-53A2501, with scheduled maintenance intervals in order to avoid the order-of-magnitude increase in the effect of the proposed actions if they must be accomplished on an unscheduled basis.
We disagree with the request to revise the compliance time. We acknowledge that for certain airplanes the inspections may have to be performed independent of the SSID or fuselage fatigue inspection programs. In developing an appropriate compliance time for this action, including the 1,000-flight-cycle initial inspection threshold, we considered the urgency associated with the subject unsafe condition, the manufacturer's recommendations, and the practical aspect of accomplishing the required inspections within a period of time that corresponds to the normal scheduled maintenance for most affected operators. We have not changed the final rule in this regard. However, according to the provisions of paragraph (j) of the final rule, we may approve requests to adjust the compliance time if the request includes data that prove that the new compliance time would provide an acceptable level of safety.
ConclusionPage 2
We have carefully reviewed the available data, including the comments received, and determined that air safety and the public interest require adopting the AD as proposed.
Costs of CompliancePage 2
There are about 1,081 airplanes of the affected design in the worldwide fleet. The following table provides the estimated costs for U.S. operators to comply with this AD.
| Action | Work hours | Average labor rate per hour | Cost per airplane | Number of U.S.-registered airplanes | Fleet cost |
|---|---|---|---|---|---|
| Inspection for Model 747SP series airplanes | 48 | $80 | $3,840, per inspection cycle | 10 | $38,400, per inspection cycle. |
| Inspection for all other Model 747 series airplanes | 68 | 80 | $5,440, per inspection cycle | 196 | $1,066,240, per inspection cycle. |
Authority For this RulemakingPage 2
Title 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, Section 106, describes the authority of the FAA Administrator. Subtitle VII, Aviation Programs, describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in Subtitle VII, Part A, Subpart III, Section 44701, “General requirements.” Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action.
Regulatory findingsPage 2
We have determined that this AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a “significant regulatory action” under Executive Order 12866;
(2) Is not a “significant rule” under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and
(3) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.
We prepared a regulatory evaluation of the estimated costs to comply with this AD and placed it in the AD docket. See the ADDRESSES section for a location to examine the regulatory evaluation.
Adoption of the amendmentPage 2
Accordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows:
1. The authority citation for part 39 continues to read as follows:
Affected TCDS · 1
The type certificate data sheets for the models this AD names, matched by model and maker.
Registered aircraft · 63
Registered aircraft whose airframe or engine model this AD names. Matched by model only, so check each against the AD’s applicability.
| 1969 | 1 |
|---|---|
| 1970 | 2 |
| 1971 | 1 |
| 1975 | 2 |
| 1976 | 1 |
| 1989 | 2 |
| 1990 | 4 |
| 1991 | 6 |
| 1992 | 2 |
| 1993 | 2 |
| 1994 | 3 |
| 1995 | 1 |
| 1997 | 4 |
| 1998 | 1 |
| 1999 | 4 |
| 2000 | 1 |
| 2001 | 1 |
| 2002 | 3 |
| 2003 | 1 |
| 2004 | 1 |
| 2005 | 3 |
| 2007 | 3 |
14 with no year recorded