AD 2013-15-11

Airworthiness directive · Stabilizers · Boeing 727-100 Series, 727-100C Series, 727-200 Series and 3 more

Effective
September 20, 2013
Published
August 16, 2013 · 78 FR 49906–49908
Issued
July 21, 2013
Models
727-100 Series, 727-100C Series, 727-200 Series, 727-200F Series, 727 Series, 727C Series
Data sheet
TCDSA3WE
Registered aircraft
25 matched by model
Product
Aircraft · Large airplane
ATA chapter
55 · Stabilizers
Amendment
39-17527
Docket
FAA-2013-0361
Project
2013-NM-026-AD
Issued as
Final rule

Unofficial copy from the Federal Register XML, document 2013-18098. Only the govinfo PDF is the legal edition. DRS record last changed May 30, 2024.

On this page

Summary

We are adopting a new airworthiness directive (AD) for all The Boeing Company Model 727 airplanes. This AD was prompted by a report of cracking in the left-side chord of the fin closure rib on the vertical stabilizer. This AD requires repetitive inspections of the left and right side chords of the fin closure rib for cracking and corrosion, and related investigative and corrective actions if necessary. We are issuing this AD to detect and correct cracking and corrosion in the left- and right-side chords of the fin closure rib, which could lead to widespread cracking in the chords that might weaken the fin closure rib structure and result in loss of airplane control due to lack of horizontal stabilizer support.

The airworthiness directive

2013-15-11 The Boeing Company: Amendment 39-17527; Docket No. FAA-2013-0361; Directorate Identifier 2013-NM-026-AD.

(a) Effective Date

PDF page 2

This AD is effective September 20, 2013.

(b) Affected ADs

PDF page 2

None.

(c) Applicability

PDF page 2

This AD applies to all The Boeing Company Model 727, 727C, 727-100, 727-100C, 727-200, and 727-200F series airplanes, certificated in any category.

(d) Subject

PDF page 2

Joint Aircraft System Component (JASC)/Air Transport Association (ATA) of America Code 55, Stabilizers.

(e) Unsafe Condition

PDF page 2

This AD was prompted by a report of cracking in the left-side chord of the fin closure rib on the vertical stabilizer. We are issuing this AD to detect and correct cracking and corrosion in the left- and right-side chords of the fin closure rib, which could lead to widespread cracking in the chords that might weaken the fin closure rib structure, and result in loss of airplane control due to lack of horizontal stabilizer support.

(f) Compliance

PDF page 2

Comply with this AD within the compliance times specified, unless already done.

(g) Detailed and High Frequency Eddy Current (HFEC) Inspections

PDF page 2

Within 24 months after the effective date of this AD: Do a detailed inspection for cracking and corrosion of the left- and right-side chords of the fin closure rib, and do a HFEC inspection of the left- and right-side chords for cracking, in accordance with the Accomplishment Instructions of Boeing Special Attention Service Bulletin 727-55-0095, dated September 24, 2012. If any cracking or corrosion is found, before further flight, repair or replace the affected right- or left-side chord using a method approved in accordance with the procedures specified in paragraph (h) of this AD. Repeat the detailed inspection and HFEC inspection thereafter at intervals not to exceed 26 months.

(h) Alternative Methods of Compliance (AMOCs)

PDF page 3

(1) The Manager, Seattle Aircraft Certification Office (ACO), FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the ACO, send it to the attention of the person identified in the Related Information section of this AD. Information may be emailed to: 9-ANM-Seattle-ACO-AMOC-Requests@faa.gov.

(2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office.

(3) An AMOC that provides an acceptable level of safety may be used for any repair required by this AD if it is approved by the Boeing Commercial Airplanes Organization Designation Authorization (ODA) that has been authorized by the Manager, Seattle ACO, to make those findings. For a repair method to be approved, the repair must meet the certification basis of the airplane, and the approval must specifically refer to this AD.

(i) Related Information

PDF page 3

For more information about this AD, contact Berhane Alazar, Aerospace Engineer, Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office, 1601 Lind Avenue SW., Renton, Washington 98057-3356; phone: 425-917-6577; fax: 425-917-6590; email: berhane.alazar@faa.gov.

(j) Material Incorporated by Reference

PDF page 3

(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.

(2) You must use this service information as applicable to do the actions required by this AD, unless the AD specifies otherwise.

(i) Boeing Special Attention Service Bulletin 727-55-0095, dated September 24, 2012.

(ii) Reserved.

(3) For service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; telephone 206-544-5000, extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com.

(4) You may view this service information at FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221.

(5) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

Rule preamble

The FAA’s background, reasoning and cost estimate, published with the AD.

DatesPage 1

This AD is effective September 20, 2013.

The Director of the Federal Register approved the incorporation by reference of a certain publication listed in the AD as of September 20, 2013.

AddressesPage 1

For service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; telephone 206-544-5000, extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com. You may review copies of the referenced service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221.

For further information contactPage 1

Berhane Alazar, Aerospace Engineer, Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office, 1601 Lind Avenue SW., Renton, Washington 98057-3356; phone: 425-917-6577; fax: 425-917-6590; email: berhane.alazar@faa.gov.

DiscussionPage 1

We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to include an AD that would apply to the specified products. The NPRM published in the Federal Register on May 2, 2013 (78 FR 25662). The NPRM proposed to require repetitive inspections of the left- and right-side chords of the fin closure rib for cracking and corrosion, and related investigative and corrective actions if necessary.

CommentsPage 2

We gave the public the opportunity to participate in developing this AD. We have considered the comments received. Boeing stated that it supports the NPRM (78 FR 25662, May 2, 2013).

FedEx Express commented that it has four airplanes that will be affected by the NPRM (78 FR 25662, May 2, 2013). This commenter also noted that the proposed inspection threshold and intervals can be accomplished within its planned scheduled maintenance checks, that the work-hours and elapsed time to accomplish the proposed inspections will not impact the overall span-time of the planned scheduled maintenance check, and that the proposed inspections do not require any special inspection techniques, training, or tooling.

ConclusionPage 2

We reviewed the relevant data, considered the comments received, and determined that air safety and the public interest require adopting this AD as proposed—except for minor editorial changes. We have determined that these minor changes:

• Are consistent with the intent that was proposed in the NPRM (78 FR 25662, May 2, 2013) for correcting the unsafe condition; and

• Do not add any additional burden upon the public than was already proposed in the NPRM (78 FR 25662, May 2, 2013).

Costs of CompliancePage 2

We estimate that this AD affects 98 airplanes of U.S. registry.

We estimate the following costs to comply with this AD:

Estimated Costs
ActionLabor costParts costCost per productCost on U.S. operators
Inspections17 work-hours × $85 per hour = $1,445 per inspection cycle$0$1,445 per inspection cycle$141,610 per inspection cycle.

We have received no definitive data that would enable us to provide cost estimates for the on-condition actions specified in this AD.

Authority for This RulemakingPage 2

Title 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. Subtitle VII: Aviation Programs, describes in more detail the scope of the Agency's authority.

We are issuing this rulemaking under the authority described in Subtitle VII, Part A, Subpart III, Section 44701: “General requirements.” Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action.

Regulatory findingsPage 2

This AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.

For the reasons discussed above, I certify that this AD:

(1) Is not a “significant regulatory action” under Executive Order 12866,

(2) Is not a “significant rule” under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979),

(3) Will not affect intrastate aviation in Alaska, and

(4) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.

Adoption of the AmendmentPage 2

Accordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows:

Adoption of the amendmentPage 2

1. The authority citation for part 39 continues to read as follows:

2. The FAA amends § 39.13 by adding the following new airworthiness directive (AD):

Affected TCDS · 1

The type certificate data sheets for the models this AD names, matched by model and maker.

Registered aircraft · 25

Registered aircraft whose airframe or engine model this AD names. Matched by model only, so check each against the AD’s applicability.

By aircraft maker
  • Boeing25 aircraft
By year built
19711982
Registered aircraft by year built: 18 aircraft
19711
19731
19752
19763
19772
19782
19791
19815
19821

7 with no year recorded

By model

Aircraft

See all 25 aircraft