AD 70-26-03

Airworthiness directive · Main Landing Gear Trunnion Support Beam · Boeing 727-100 Series, 727-100C Series, 727-200 Series and 3 more

Effective
October 8, 1971
Models
727-100 Series, 727-100C Series, 727-200 Series, 727-200F Series, 727 Series, 727C Series
Data sheet
TCDSA3WE
Registered aircraft
25 matched by model
Product
Aircraft · Large airplane
Amendment
39-1307

Unofficial copy of the text in the FAA’s Dynamic Regulatory System. The FAA’s own copy is the authoritative one. DRS record last changed May 30, 2024.

On this page

The airworthiness directive

70-26-03 BOEING: Amdt. 39-1130 as amended by Amendment 39-1161 is further amended by Amendment 39-1307. Applies to all Model 727 series airplanes.

Compliance required on all airplanes with 10,000 or more landings as follows:

(1) Within 300 landings after the effective date of this AD where not previously inspected in accordance with these procedures; or (2) Within 2000 landings since the initial inspection where previously inspected in accordance with these procedures; and (3) Thereafter at intervals not to exceed 2000 landings since the last such inspection. To detect cracks in the main landing gear trunnion support beam, P/N 65-16230, accomplish the following:

(a) Inspect in accordance with Boeing Service Bulletin 57-115, dated November 20, 1970, or later FAA approved revisions, or an equivalent inspection approved by the Chief, Aircraft Engineering Division, FAA Western Region.

(b) If cracks are found, before further flight, accomplish one of the following: (1) Rework the beam in accordance with rework instructions in Boeing Service Bulletin 57-120, dated 30 April 1971, or later FAA approved revisions, and repeat the inspection required in (3) above, or (2) Repair the beam in a manner approved by the Chief, Aircraft Engineering Division, FAA Western Region, and repeat the inspection required in (3) above, or (3) Replace the beam with a serviceable beam. If this beam is a previously reworked beam, or has 10,000 or more landings, repeat the inspection required in (3) above. (c) Where records maintained by the operator are such as will permit a clear determination of the number of landings accumulated by the main landing gear trunnion support beam, P/N 65-16230, installed on the airplane, the inspection times prescribed by this AD may be applied to the beam rather than to the airplane. (d) Inspections prescribed by this AD do not apply. (1) To replacement beams P/N 65-62335; or (2) To replacement beams P/N65-16230 until the replacement beams (P/N 65- 16230) have accumulated 10,000 landings. For the purpose of this AD the number of landings may be determined by dividing each airplane's hours' time in service by the operator's fleet average time from takeoff to landing for the airplane type. Amendment 39-1130 became effective December 30, 1970. Amendment 39-1161 became effective March 6, 1971. This amendment 39-1307 becomes effective October 8, 1971.

Affected TCDS · 1

The type certificate data sheets for the models this AD names, matched by model and maker.

Registered aircraft · 25

Registered aircraft whose airframe or engine model this AD names. Matched by model only, so check each against the AD’s applicability.

By aircraft maker
  • Boeing25 aircraft
By year built
19711982
Registered aircraft by year built: 18 aircraft
19711
19731
19752
19763
19772
19782
19791
19815
19821

7 with no year recorded

By model

Aircraft

See all 25 aircraft