AD 84-04-03

Airworthiness directive · Jumper Cords · JR Aerosports Firefly 7B

Effective
April 9, 1984
Model
Firefly 7B
Data sheet
TCDSA14SO
Registered aircraft
29 matched by model
Product
Aircraft · Balloon
Amendment
39-4821

Unofficial copy of the text in the FAA’s Dynamic Regulatory System. The FAA’s own copy is the authoritative one. DRS record last changed May 30, 2024.

On this page

The airworthiness directive

84-04-03 THE BALLOON WORKS: Amendment 39-4821. Applies to Model Firefly 7B (Twelve Gore) (Serial Numbers F7B-009, F7B-011 through F7B-044, and F7B-046 through F7B- 080) Hot Air Balloons certificated in any category.

Compliance: Required within the next 10 hours time in service after the effective date of this AD, unless already accomplished.

To prevent breakage of jumper cords, which may result in uncontrollable descent, accomplish the following:

(a) Lengthen each envelope jumper cord, shorten each centering cord, inflate envelope and examine valve fit and adjust, if necessary, in accordance with The Balloon Works Service Bulletin No. B20, dated June 29, 1983.

(b) An equivalent means of compliance with this AD may be used if approved by the Manager, Atlanta Aircraft Certification Office, FAA Central Region, 1075 Inner Loop Road, College Park, Georgia 30337.

This amendment becomes effective on April 9, 1984.

Affected TCDS · 1

The type certificate data sheets for the models this AD names, matched by model and maker.

Registered aircraft · 29

Registered aircraft whose airframe or engine model this AD names. Matched by model only, so check each against the AD’s applicability.

By aircraft maker
  • Balloon Works26 aircraft
  • Firefly Balloons3 aircraft
By year built
19812006
Registered aircraft by year built: 18 aircraft
19815
19824
19835
19871
20041
20062

11 with no year recorded

By model

Aircraft

See all 29 aircraft