AD 90-25-06

Airworthiness directive · DME Antenna Cable Connectors · Cessna 650

Effective
December 11, 1990
Model
650
Data sheet
TCDSA9NM
Registered aircraft
201 matched by model
Product
Aircraft · Large airplane
Amendment
39-6818
Docket
90-NM-253-AD

Unofficial copy of the text in the FAA’s Dynamic Regulatory System. The FAA’s own copy is the authoritative one. DRS record last changed May 30, 2024.

On this page

The airworthiness directive

90-25-06 CESSNA AIRCRAFT COMPANY: Amendment 39-6818. Docket No. 90-NM-253-AD.

Applicability: Model 650 Series airplanes; Serial Nos. 650-0094 through -0096, -0098, -0136 through -0139, -0149, -0161, -0167, -0170, -0172, -0173, -0176 through 0182, -0184 through -0189, and -0192; equipped with Honeywell SPZ-8000 Digital Automatic Flight Control System; certificated in any category.

Compliance: Required within 25 hours time-in-service after the effective date of this AD, unless previously accomplished.

To prevent complete loss of the pilots' primary flight instrument displays, accomplish the following:

A. Replace the distance measuring equipment (DME) antenna cable connectors in accordance with Steps l through 3 of the Accomplishment Instructions of Cessna Citation Alert Service Bulletin A650-34-68, dated November 2, 1990.

B. Accomplish either subparagraph B.1. or B.2., below:

1. Check the electrical bonding of the DME antennas to airplane structurein accordance with Step 4 of the Accomplishment Instructions of Cessna Citation Alert Service Bulletin A650-34-68, dated November 2, 1990.

a. If the resistance is greater than 0.010 Ohms, prior to further flight, rework the antennas installation in accordance with Step 4 of the service bulletin.

b. If the resistance is equal to or less than 0.010 Ohms, restore the system for use in accordance with Steps 5 through 7 of the Accomplishment Instructions of the service bulletin.

2. Rework the antenna installation in accordance with Step 4 of Cessna Citation Alert Service Bulletin A650-34-68, dated November 2, 1990; and restore the system for use in accordance with Steps 5 through 7 of the Accomplishment Instructions of the service bulletin.

C. An alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Wichita Aircraft Certification Office (ACO), ACE-130W, FAA, CentralRegion.

NOTE: The request should be submitted directly to the Manager, Wichita ACO, and a copy sent to the cognizant FAA Principal Inspector (PI). The PI will then forward comments or concurrence to the Manager, Wichita ACO.

D. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base in order to comply with the requirements of this AD.

All persons affected by this directive who have not already received the appropriate service information from the manufacturer may obtain copies upon request to Cessna Aircraft Company, Customer Services, P.O. Box 1521, Wichita, Kansas 67201. This information may be examined at the FAA, Northwest Mountain Region, Transport Airplane Directorate, 1601 Lind Avenue S.W., Renton, Washington; or at the FAA, Central Region, Wichita Aircraft Certification Office, 1801 Airport Road, Room 100, Wichita, Kansas.

This amendment (39-6818, AD 90-25-06) becomes effective on December 11, 1990.

Affected TCDS · 1

The type certificate data sheets for the models this AD names, matched by model and maker.

Registered aircraft · 201

Registered aircraft whose airframe or engine model this AD names. Matched by model only, so check each against the AD’s applicability.

By aircraft maker
  • Cessna201 aircraft
By year built
19822000
Registered aircraft by year built: 179 aircraft
19821
19834
198422
198514
198613
19878
198810
19892
19908
19918
199211
199314
199413
199514
19968
19975
19986
199910
20008

22 with no year recorded

By model

Aircraft

See all 201 aircraft