N103HQ

Service difficulty reports · 109

Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model. Newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE n_number = 'N103HQ' AND registry_match = 'registration'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR R61A20110196Web · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON FR87-88 CENTER WEB. MX REMOVED AND REPLACED FR87-88 CENTER WEB IAW EMB 175 SRM 51-40-02, 51-42-01, 51-42-02. P/N 170-65928-001. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION.Jul 26, 2011 · N103HQ · Emb ERJ170200LR · Fuselage Miscellaneous StructureSDR R61A20110194Shear Web · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION AT FR 87-88 RT WEB. MX REMOVED AND REPLACED RT SHEAR WEB AT FR 87-88 IAW EMB 175 SRM 51-40-02, 51-42-01, 51-43-01. P/N 170-91919-001. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION.Jul 26, 2011 · N103HQ · Emb ERJ170200LR · Fuselage Miscellaneous StructureSDR R61A20110193Mount Bracket · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION AT FR 86 LT AFT SIDE MOUNT BRACKET. MX REMOVED AND REPLACED MOUNT BRACKET IAW EMB 175 SRM 51-41-01, P/N 170-66796-001. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION.Jul 26, 2011 · N103HQ · Emb ERJ170200LR · Fuselage Miscellaneous StructureSDR R61A20110192Floorbeam · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON FR 85-86 FLOORBEAM. MX REMOVED AND REPLACED FLOORBEAM IAW EMB 175 SRM 51-41-01, 51-43-01. P/N 170-65669-004. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION.Jul 26, 2011 · N103HQ · Emb ERJ170200LR · Fuselage Main, Floor BeamSDR R61A20110113Unknown · malfunctionedCREW REPORTED AVNX MAU 3B FAIL IN FLIGHT, DECLARED AN EMERGENCY, AND LANDED WITHOUT INCIDENT AT BOS. MAINTENANCE INSPECTED MAU 3 POWER SUPPLY AND PERFORMED OPS CHECKS PER EMB AMM, NO FAULTS NOTED AND RETURNED AIRCRAFT TO SERVICE.May 15, 2011 · N103HQ · Emb ERJ170200LR · Central ComputersSDR R61A20100574Warning System · false activationCREW REPORTED EMERGENCY BATTERY FAULT ON EICAS, MX RESET AC POWER PER EMB AMM MESSAGE CLEARED AC OK FOR SERVICE.Dec 24, 2010 · N103HQ · Emb ERJ170200LR · Emergency LightingSDR R61A20100296Spar · damagedDUE TO A GROUND A/C INCIDENT IN PVD WHERE THE AC SUFFERED WINGTIP DAMAGE WITH ANOTHER AC. PERFORMING A MAJOR REPAIR TO THE RT WING SPAR 11 TIP. MAINTENANCE HAS EVALUATED THE DAMAGE AND REQUESTED EMB ENGINEERING ASSISTANCE, AND WAS INSTRUCTED TO REPAIR THE DAJun 30, 2010 · N103HQ · Emb ERJ170200LR · Wing SparSDR R61A20100091Processor · failedCREW REPORTED MAU 3A FAIL IN FLIGHT ALONG WITH VARIOUS OTHER FAULTS, AND EICAS MSGS. CREW DIVERTED TO PIT AND PERFORMED AN EMERGENCY LANDING WITH EMERGENCY EQUIPMENT VEHICLES DISPATCHED, LANDED WITHOUT INCIDENT. MAINTENANCE WAS DISPATCHED TO THE A/C TO TROUBFeb 25, 2010 · N103HQ · Emb ERJ170200LR · Central ComputersSDR R61A20090038Battery · dischargedCREW REPORTED THE EMERGENCY LIGHTS WOULDN'T TEST CORRECTLY. MAINTENANCE WAS DISPATCHED TO THE AIRCRAFT, AND TROUBLESHOT. MTX FOUND THE NR 2 AND NR 3 ELPU TO BE AT FAULT, AND REPLACED BOTH PER EMB AMM. A/C WAS THEN RELEASED BACK INTO SERVICE.Aug 15, 2009 · N103HQ · Emb ERJ170200LR · Emergency Lighting
Back to N103HQ