N115HQ

Service difficulty reports · 112

Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model. Newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE n_number = 'N115HQ' AND registry_match = 'registration'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR R61A20120022Cable · brokenCREW REPORTED R-2 DOOR WOULDN'T ARM. MAINTENANCE REPORTED R-2 DOOR WOULDN'T ARM. MAINTENANCE REMOVED AND REPLACED R-2 DOOR ARM/DISARM CABLE PER EMB AMM, OPS CHECK GOOD.Jan 8, 2012 · N115HQ · Emb ERJ170200LR · Service DoorsSDR R61A20110441Nut Plate · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON THE NUT PLATES OF THE FORWARD CARGO DOOR BUMP PLATE. MAINTENANCE REMOVED AND REPLACED THE NUT HOLDERS (PLATES) AT THE FORWARD CARGO DOOR CUT-OUT BUMP PLATES IAW EMB 175 SRM 51-41-02. REFEREDec 20, 2011 · N115HQ · Emb ERJ170200LR · Cargo/Baggage DoorsSDR R61A201112190442Beam · corrodedDURING HEAVY CHECK, FOUND CORROSION ON RT BEAM FR-86-88. MX REMOVED AND REPLACED RT BEAM, AND SHEET GUSSET PN 170-86101-001 IAW SRM 51-40-02, 51-41-01, 51-42-01, 51-43-01.Dec 19, 2011 · N115HQ · Emb ERJ170200LR · Fuselage Main, StructureSDR R61A20110438Panel · corrodedWHILE AIRCRAFT WAS IN HEAVY CHECK MAINTENANCE FOUND CORROSION ON CENTER INTERCOSTAL/SHEAR PANEL FRAME 87 TO FRAME 88. MAINTENANCE REMOVED AND REPLACED SHEAR PANEL ON FR 87 TO FR 88 IAW EMB 175 SRM 51-40-02, 51-21-01 AND 51-42-01. THE AIRCRAFT IS OUT OF SERVIDec 19, 2011 · N115HQ · Emb ERJ170200LR · Fuselage Miscellaneous StructureSDR R61A20110436Panel · corrodedWHILE AIRCRAFT WAS IN HEAVY CHECK MAINTENANCE FOUND CORROSION ON RT SHEAR PANEL/INTERCOSTAL FRAME 87 TO 88. MAINTENANCE REMOVED AND REPLACED RT SHEAR PANEL/INTERCOSTAL FRAME 87 TO 88 IAW EMB 175 SRM 51-40-02, 51-42-01, AND 51-42-02. THE AIRCRAFT IS OUT OF SEDec 19, 2011 · N115HQ · Emb ERJ170200LR · Fuselage Miscellaneous StructureSDR R61A20110437Panel · corrodedWHILE AIRCRAFT WAS IN HEAVY CHECK MAINTENANCE FOUND CORROSION ON LT INTERCOSTAL/SHEAR PANEL FR 87 TO FR 88. MAINTENANCE REMOVED AND REPLACED THE LT INTERCOSTAL/ SHEAR PANEL IAW EMB 175 SRM 51-40-02, AND 51-42-01. THE AIRCRAFT IS OUT OF SERVICE IN HEAVY CHECKDec 18, 2011 · N115HQ · Emb ERJ170200LR · Fuselage Miscellaneous StructureSDR R61A20110432Gusset · corrodedWHILE AIRCRAFT WAS IN HEAVY CHECK MAINTENANCE FOUND CORROSION ON GUSSET AT FRAME 90 RT I BEAM. MAINTENANCE REMOVED AND REPLACED GUSSET AT FR 90 RT I BEAM IAW EMB 175 SRM 51-41-02. THE AIRCRAFT IS OUT OF SERVICE IN HEAVY CHECK.Dec 18, 2011 · N115HQ · Emb ERJ170200LR · Fuselage Miscellaneous StructureSDR R61A20110349Arming Lever · out of adjustCREW REPORTED R-1 ARMING LEVER WAS DIFFICULT TO USE. MAINTENANCE ADJUSTED R-1 DOOR ARMING LEVER PER EMB AMM, OPS CHECK GOOD.Nov 2, 2011 · N115HQ · Emb ERJ170200LR · Service DoorsSDR R61A20110039Control Module · failedCREW REPORTED A STEER FAIL MESSAGE ON APPROACH, AN EMERGENCY WAS DECLARED AND THE A/C LANDED WITHOUT INCIDENT AT CLT. MAINTENANCE RESET STEERING SYSTEM AND PERFORMED OPS CHECKS PER EMB AMM, A/C WAS THEN RETURNED TO SERVICE. PER ENGINEERING INSTRUCTION R170EIFeb 16, 2011 · N115HQ · Emb ERJ170200LR · Landing Gear Steering SystemSDR R61A20110033Girt Bar · stuckCREW REPORTED L-1 DOOR WAS DIFFICULT TO ARM. MAINTENANCE FREED THE GIRT BAR DOOR AND PERFORMED OPS CHECKS PER EMB AMM, OPS CHECK GOOD.Feb 10, 2011 · N115HQ · Emb ERJ170200LR · Emergency EquipmentSDR R61A20100193Door · bindsCREW REPORTED L-1 DOOR WAS HARD TO OPEN FROM THE OUTSIDE. MAINTENANCE PERFORMED OPERATIONAL CHECK OF L-1 DOOR PER EMB AMM, NO DEFECTS WERE NOTED.May 8, 2010 · N115HQ · Emb ERJ170200LR · Passenger/Crew DoorsSDR R61A20100094Wire Harness · faultyCREW REPORTED A WING A/I LEAK IN FLIGHT, DECLARED AN EMERGENCY AND RETURNED TO FIELD AT PHL, AND LANDED WITHOUT INCIDENT. MTX WAS DISPATCHED TO THE AIRCRAFT TO TROUBLESHOOT, AND FOUND THE LT NR 4 SLAT HARNESS AT FAULT, REPLACED IT PER EMB AMM AND AIRCRAFT WASFeb 26, 2010 · N115HQ · Emb ERJ170200LR · Ice/Rain Protection System Wiring
Back to N115HQ