N14105

Service difficulty reports · 55

Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model. Newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE n_number = 'N14105' AND registry_match = 'registration'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR C2XA06SH018Floorbeam · corrodedSHV - DURING C-CHECK THE CENTER OMEGA BEAM WAS FOUND TO BE CORRODED AT FRAME 20. MAINTENANCE REMOVED AND REPLACED THE AFFECTED BEAM IAW EMB 145 SRM 51-40-02. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.Feb 9, 2006 · N14105 · Emb EMB145XR · Fuselage Main, Floor BeamSDR C2XA05IA037Light · inoperativeCLE - FLIGHT 3393, DURING POST FLIGHT INSPECTION, THE CREW REPORTED THAT THE AISLE PATH LIGHTING BY THE GALLEY WAS INOPERATIVE. MAINTENANCE REMOVED AND REPLACED THE AFFECTED LIGHT STRIP, OPERATIONALLY CHECKED WITH NO DEFECTS NOTED, AND THE AIRCRAFT WAS APPROVMar 3, 2005 · N14105 · Emb EMB145XR · Emergency LightingSDR C2XA04TY156Crossbeam · corrodedDURING A SCHEDULED C CHECK INSPECTION, THE FWD CROSS MEMBER AT FRAME 20 WAS FOUND TO HAVE CORROSION AT BOTH ENDS. MANTENANCE REMOVED CORRODED AREAS, INSTALLED FILLER, SHIMS AND DOUBLER IAW THE MFG SRM. ACFT PENDING RELEASE UPON COMPLETION OF C-CHECK.Aug 19, 2004 · N14105 · Emb EMB145XR · Fuselage Miscellaneous StructureSDR C2XA04TY153Floorbeam · corrodedDURING A SCHEDULED 1C INSPECTION CORROSION WAS FOUND BETWEEN FR 24 AND FR 25 ON THE LT OMEGA BEAM. MAINTENANCE CUTOUT THE CORRODED AREA, FAB A DOUBLER AND SHIMS AND REINSTALL IAW SRM 53-21-01. ALL WORK WAS ACCOMPLISHED AND WILL BE REL. UPON COMPLETION OF ALAug 16, 2004 · N14105 · Emb EMB145XR · Fuselage Main, Floor BeamSDR C2XA03BT083Relay · failedBAG EXTINGUISHER NOT ILLUMINATED DURING FIRE DETECT TEST. REMOVED AND REPLACED RELAY NR I01. OPS CHECK GOOD IAW EMB145 MM 26-23-00.Aug 22, 2003 · N14105 · Emb EMB145XR · Fire Bottle, Fixed
Back to N14105