N663AW
Service difficulty reports · 253
Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model. Newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE n_number = 'N663AW' AND registry_match = 'registration' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE n_number = 'N663AW' AND registry_match = 'registration' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR AWXA200200882Power Supply · dischargedPHX - EEL - DURING INSPECTION EMERGENCY EXIT LIGHTS FAILED TEST FROM PROGRAMMING AND TEST PANEL. MAINTENANCE FOUND THE RT EMERGENCY POWER SUPPLY UNIT INOPERATIVE. REPLACED EMERGENCY POWER SUPPLY UNIT (12WL); OPERATIONAL CHECK WAS GOOD.SDR AWXA200200106Flashlight · defectivePHX - EEL - C - FLASHLIGHT AT FORWARD FLIGHT ATTENDANT STATION HAS NO FLASHING RED CHARGE LIGHT. MAINTENANCE REMOVED AND REPLACED WITH SERVICEABLE FLASHLIGHT.SDR AWXA200100680Power Supply · dischargedPHX - EEL - C - EMERGENCY LIGHT SYSTEM FAILED TEST DURING INSPECTION. MAINTENANCE TROUBLESHOT AND REPLACED THE LT AND RT CENTER CABIN EMERGENCY POWER SUPPLIES 11WL AND 12WL IAW AMM 33-51-38-400-001.
Back to N663AW