Service difficulty reports · 9
Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model.
SDR 04278426Relay · failedAFTER DEPARTURE, CREW RECEIVED NORMAL ELEVATOR TRIM FAIL INDICATION. RETURNED TO FIELD SAFELY. MX REMOVED AND REPLACED RELAYS 42CC AND 45CC IAW JIC 27-32-00.SDR 04277426Pump · defectiveHYDRAULIC B FAILURE, DIVERTED. MECHANIC REMOVED AND REPLACED SYSTEM B HYD PUMP. LEAK AND OPS CHECK GOOD.SDR 04147426Battery · dischargedDURING INSPECTION THE EMERGENCY LIGHTS IN THE CENTER OF CABIN WERE FOUND INOPERATIVE. THE BATTERY PACK WAS FOUND INOPERATIVE AND REPLACED. A SATISFACTORY OPERATIONAL CHECK WAS PERFORMED AND AIRCRAFT RETURNED TO SERVICE.SDR 04125426Bulb · burned outDURING INSPECTION THE FOWARD DOME EMERGENCY LIGHT WAS FOUND INOPERATIVE AND REPLACED. A SATISFACTORY OPERATIONAL CHECK WAS PERFORMED AND AIRCRAFT RETURNED TO SERVICE.SDR 04077426Bulb · burned outDURING INSPECTION THE FORWARD OVERHEAD CABIN EMERGENCY LIGHT WAS FOUND INOPERATIVE. THE BULB WAS REPLACED AND A SATISFACTORY OPERATIONAL CHECK WAS PERFORMED. AIRCRAFT WAS RETURNED TO SERVICE.SDR 04075426Battery · dischargedDURING INSPECTION OF THE AIRCRAFT SEVERAL EMERGENCY LIGHTS WERE FOUND INOPERATIVE. THE BATTERIES WERE FOUND DISCHARGED AND REPLACED. A SATISFACTORY OPERATIONAL CHECK WAS PERFORMED AND AIRCRAFT WAS RETURNED TO SERVICE.SDR 04048426Battery · dischargedDURING INSPECTION THE MIDDLE SECTION OF ESCAPE PATH LIGHTING WAS FOUND INOPERATIVE. THE BATTERY WAS REPLACED AND A SATISFACTORY OPERATIONAL CHECK WAS PERFORMED. AIRCRAFT WAS RETURNED TO SERVICE UPON INSPECTION.SDR 03196426Control Panel · faultyDURING CRUISE, THE CREW REPORTED A TOTAL GENERATOR FAILURE. MAINTENANCE PERSONNEL REMOVED AND REPLACED THE 1VE PANEL. AN OPERATIONAL CHECK WAS SATISFACTORY AND THE AIRCRAFT WAS RETURNED TO SERVICE.SDR 03148426Blade · separatedDURING CLIMB, THE CREW REPORTED A RT ENGINE ITT EXCEEDANCE. THE FLIGHT RETURNED TO RDU AND LANDED WITHOUT INCIDENT. FOUND HPT NR 1 BLADE SEPARATION. MAINTENANCE PERSONNEL REMOVED AND REPLACED RT ENGINE. OPERATIONAL CHECKS WERE SATISFACTORY AND AIRCRAFT WAS