JASC 2822
Service difficulty reports · 2,745
Reports filed under 2822 · Fuel Boost Pump, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '2822' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '2822' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR AALA201705249008Pump · faultyMAIN CENTER FUEL TANKS LEFT PUMP FAULTED. REMOVED AND REPLACED THE FUEL BOOST PUMP.SDR CALA2017051901457Pump · failedON CLIMBOUT FUEL IMBALANCE OF 2000 POUNDS HAD TO CROSSFEED WITH RIGHT CENTER PUMP OFF. REMOVED AND REPLACED RT CTR FUEL BOOST PUMP IAW MM REF 28-22-03. OPS AND LEAK CKS GOOD AT THIS TIME. OK TO CONTINUE.SDR AALA201705159038Pump · faultyLEFT MAIN FUEL TANK FORWARD FUEL BOOST PUMP LOW PRESSURE LIGHT DISAGREES WITH PUMP STATUS. FUEL BOOST PUMP INTERMITTENT. REMOVED AND REPLACED LEFT FORWARD FUEL BOOST PUMP IAW AMM 28-22-41. OPS CHECKED GOOD. AIRCRAFT WAS GROUNDED.SDR AALA201705159037Pump · false indicationRIGHT CENTER TANK FUEL BOOST PUMP LOW PRESSURE LIGHT, DISAGREES WITH PUMP STATUS. PRIMED CENTER BOOST PUMPS IAW AMM 28-22-41-420-801. OPS CHECKED GOOD.SDR CA200102011Pump · malfunctioned(CAN) THE TEST RESULTS FOR TWO FUEL PUMPS WERE CALLED INTO QUESTION DURING THE 2018 PVI. THE OUT OF TOLERANCE CONDITIONS WERE DOCUMENTED ON NON-CONFORMANCE REPORTS AND APPROVED INTERNALLY BY QA, ENGINEERING AND THE PRM IN MAY 2017. PUMP S/NS 8071 AND 8074 COULSDR UIEA2017050500715Relay · not seatedLEFT AFT FUEL PUMP EICAS MESSAGE ON APPROACH, QRH COMPLETE. RESEATED RELAY K10705 BOOST PUMP OPERATED NORMAL. NO EICAS MESSAGE DISPLAYED IAW AMM 28-22-03.SDR AALA201705049025Pump · faultyLEFT CENTER TANK FUEL PUMP EICAS MESSAGE. TURNED OFF PUMP PER PROCEDURES. REMOVED AND REPLACED FUEL OVERRIDE PUMP IAW AMM 28-22-05. OPS CHECKED GOOD.SDR UIEA2017050400695Pump · malfunctionedLEFT AND RIGHT CENTER OVERRIDE PUMPS INOPERATIVE. PERFORMED A FUNCTIONAL TEST OF LEFT AND RIGHT CENTER TANK OVER RIDE, JETTISON FUEL PUMP. FAILED ON PROTECTION SYSTEM IAW AMM 28-22-00 POST SB 767-28A0085 TEST PASS ON BOTH PUMP, NO FAULTS NOTED. OPS NORMALSDR AALA201705019005Contactor · faultyCONTROL FUEL TANK NR 1 PUMP FAULT. REPLACED THE NR 1 CENTER TANK FUEL PUMP GFI CONTACTOR.SDR UIEA2017042700665Pump · inoperativeRIGHT AFT FUEL PUMP INOPERATIVE. REMOVED AND REPLACED RT AFT FUEL BOOST PUMP IAW MM 28-22-03. OPS AND LEAK CHECKED OK.SDR AALA201704259006Pump · unserviceableAFTER CENTER FUEL TANK IS EMPTY, LEFT AND RIGHT TANKS HAVE A FUEL IMBALANCE. FUEL FLOW ON BOTH ENGINES UNREADABLE. REMOVED AND INSPECTED CENTER TANK LEFT BOOST PICKUP WITH NO DEFECTS NOTED. REMOVED AND REPLACED LEFT CENTER FUEL BOOST/OVERRIDE PUMP FOR COMPANYSDR P5CA2017042000092Lamp · inoperativeLEFT ENGINE SPAR VALVE FAILED OPERARTIONAL CHECK. THE ENG SPAR VALVE LAMP WAS REPLACED. OPS CHECHED OK IAW AMM 28-22-00, NO FAULTS FOUND.SDR UIEA2017050900763Pump · failedLEFT PUMP INOPERATIVE EICAS MESSAGE. REMOVED AND REPLACED THE LEFT AFT FUEL PUMP IAW AMM 28-22-03. OPS AND LEAK CHECKED OK.SDR AALA201704219003Warning Message · false activationECAM DISPLAYED FOR RIGHT WING FUEL TANK PUMP NR 1, LOW PRESSURE. TURNED PUMP OFF PER SCAM PROCEDURES. PERFORMED SATISFACTORY OPERATIONAL CHECK IAW AMM 28-21-00-710-007-A. AIRCRAFT WAS GROUNDED.SDR UIEA2017041400582Pump · not reportedCIRCUIT BREAKER, RIGHT FUEL OVERRIDE PUMP. REMOVED AND REPLACED R/H OVERRIDE PUMP IAW AMM 28-22-05, AND 28-22-05-404-078-022. OPS CHECKED GOOD IAW AMM 28-31-00.SDR ASAA2017041320458Relay · failedONE HOUR AND 20 MINUTES INTO FLIGHT, NR 2 AFT LOW PRESSURE FUEL LIGHT ILLUMINATED. RAN QRH FUEL PUMP SWITCH OFF. CENTER TANK 5.01, NR 1 TANK 8.50, NR 2 TANK 8.63. ACFT GROUNDED. REMOVED AND REPLACED THE NR 2 AFT BOOST PUMP GFI RELAY IAW AMM 28-22-18. OPS CHSDR ASAA2017041020432Motor · failedDURING CRUISE, NR 2 MAIN TANK FUEL AFT LOW PRESSURE LIGHT ILLUMINATED. LIGHT EXTINGUISHED WHEN PUMP STARTED RUNNING QRH. LIGHT EXTINGUISHED BEFORE PUMP TURNED OFF. ACFT GROUNDED. REPLACED THE NR 2 AFT FUEL BOOST PUMP IAW AMM 28-22-41-400-801. LEAK AND OPS SDR AALA201704109029Ufi · malfunctionedAIRCRAFT WAS NOT GROUNDED. LEFT CENTER FUEL PUMP IS INOPERATIVE. LIGHT ILLUMINATED WITH EICAS MESSAGE. TURNED OFF PUMP FOR TAKEOFF. ACCOMPLISHED FIM 28-22-99 WITH NO FAULTS FOUND. ACCOMPLISHED RESET OF THE UNIVERSAL FAULT INTERRUPTER. OPERATIONAL CHECK GSDR 2017FA0000343Pump · leakingFUEL WAS LEAKING ONTO THE GROUND FROM THE RUBBER DRAIN TUBE OUT OF THE LOWER COWL AND WOULD NOT STOP UNTIL FUEL SELECTOR WAS TURNED TO THE OFF POSITION. REMOVED RUBBER DRAIN HOSE FROM PUMP AND FUEL WAS VISIBLY DRIPPING FROM PUMP DRAIN WHEN FUEL SELECTOR WAS TSDR AALA201704049009Pump · inoperativeCENTER FUEL PUMP NR 1 INOPERATIVE. REMOVED AND REPLACED THE NR 1 FUEL PUMP.SDR ASAA2017040320348Motor · failedNR 2 AFT FUEL PUMP LOW PRESSURE LIGHT ILLUMINATED DURING CRUISE. ACFT GROUNDED. DISCONNECTED AND INSPECTED THE NR 2 AFT FUEL PUMP AND PRESSURE SWITCH CONNECTORS. NO DAMAGE NOTED. RECONNECTED FUEL PUMP PRESSURE SWITCH CONNECTOR. ALT DEACTIVATION REVERSED. CHECSDR ASAA2017033120313Pump · failedBEING AWARE OF PREVIOUS FUEL IMBALANCE WRITE UP, WE MONITORED FUEL TANK LEVEL. AT 4 HOURS AND 10 MINUTES INTO FLIGHT AT 38,000 FEET NR 2 FUEL TANK WAS 800 LBS. LOWER THAN NR 1 TANK (LEFT SIDE). TO PREVENT A LIMIT FUEL IMBALANCE OF 1,000 LBS. WE CROSSFEED THE TSDR ASAA2017032620275Pressure Switch · failedENROUTE, STRAIGHT AND LEVEL FLIGHT AT FL340 IN SMOOTH AIR, NR 2 AFT FUEL PUMP LOW PRESSURE LIGHT ILLUMINATED FOR APPROXIMATELY ONE MINUTE. AS QRH WAS BEING ACCOMPLISHED LIGHT EXTINGUISHED BEFORE PUMP BEING TURNED OFF. ACFT GROUNDED. REMOVED AND REPLACED PRESDR AALA201703209036Pressure Switch · failedCENTER TANK PUMP NR 2, LOW PRESSURE MESSAGE, IN AUTO MODE INTERMITTENT WITH NO FUEL IN CENTER TANK. OPERATIONS NORMAL IN MANUAL MODE. BOTH CENTER TANK PUMPS SHOW GREEN WITH VALVE CLOSED IN AUTO MODE. MAINTENANCE REPLACED THE NR 2 CENTER PUMP LOW PRESSURE SWSDR AALA201703149015Pressure Switch · failedFUEL BOOST PUMP INOPERATIVE. REMOVED AND REPLACE THE BOOST PUMP PRESSURE SWITCH.SDR AALA201703179020Module · faultyLEFT CENTER FUEL PUMP LOW PRESSURE LIGHT ILLUMINATED. REMOVED AND REPLACED LEFT CENTER FUEL PUMP RELAY ADAPTER MODULE IAW AMM 28-22-99. OPERATIONAL CHECK GOOD. AIRCRAFT WAS GROUNDED.SDR AALA201703169034Pump · faultyAIRCRAFT WAS NOT GROUNDED. AFTER TAKEOFF, WITH BOTH CENTER PUMPS ON, NR 1 MAIN TANK FUEL QUANTITY DROPPED 600 POUNDS BELOW NR 2 MAIN TANK. NR 1 CENTER TANK APPEARS TO BE INOPERATIVE. REMOVED AND REPLACED LEFT CENTER FUEL BOOST PUMP OVERRIDE IMPELLER MOTOR ASDR HALA2017030400047Pump · failedRIGHT AFT FUEL PRESSURE LIGHT ILLUMINATED. REMOVED AND REPLACED THE RT BOOST PUMP IAW AMM 28-22-03. OPS CHECKED GOOD. SECURITY CHECKED OK. LEAK CHECKED OK. OK FOR SERVICE.SDR UIEA2017022000205Housing · corrodedLEFT WING BOOST PUMP HOUSING SHUT OFF SLEEVE HAS CORROSION TO THE INSIDE FUEL PATH SURFACE. REMOVED AND REPLACED THE BOOST FUEL PUMP HOUSING IAW AMM 28-92-03-404-027.SDR UIEA2017022000206Housing · corrodedRIGHT WING BOOST PUMP HOUSING SHUT OFF SLEEVE HAS CORROSION.SDR VQIA2017080900037Pump · failedTHE FLIGHT CREW ON ACFT REPORTED THE LEFT FUEL TANK NR 1 FAULT. R & R FUEL PUMP AT FIN NR 21QA IAW AMM 282151, PB401. OPS CHECKED GOOD. NO FURTHER ISSUES REPORTED ON SUBSEQUENT FLIGHTS.SDR IL7A2017062800001Shaft · shearedLEFT ENGINE SHUTDOWN AT APPROXIMATELY 1500. JUST BEFORE DESCENT, THE LEFT ENGINE LOST TORQUE AND % RPM AND LOW OIL PRESSURE WAS INDICATED. CROSSED CHECKED THE ENGINE INSTRUMENTS TO DETERMINE IF IT WAS A FAULTY INDICATOR, THEN FEATHERED THE LEFT ENGINE AND FOSDR ASAA2017021919856Motor · failedLEFT CENTER FUEL PUMP LOW PRESSURE ILLUMINATED DURING CLIMB. ACFT GROUNDED. REMOVED AND REPLACED LEFT CENTER TANK BOOST PUMP IAW AMM 28-22-41. OPS AND LEAK CHECKED GOOD.SDR ASAA2017021719855Pump · failedNR 1 ENGINE AFT FUEL PUMP LOW PRESSURE LIGHT INTERMITTENTLY ILLUMINATED AT CRUISE FL360 WITH 4200 LBS IN TANK. ACFT GROUNDED. OPENED THE CIRCUIT BREAKER ON P92 PANEL AND ATTACHED MIG 51 A D1 IAW AMM 28-22-41-000-801 STEP G.(3). PERFORMED ALTERNATE DEACTIVATIOSDR HALA2017021400033Warning System · false activationETOPS SIGNIFICANT SYSTEM, R1 FUEL PUMP ECAM FAULT ON THEN OFF INFLIGHT. PERFORMED MAIN & STBY PUMP OPERATION TEST PER AMM 28-21-00 & R1 FUEL PUMP OPS CHK'D OK.SDR HALA2017021300023Pump · malfunctionedDURING LANDING ROLL OUT, LEFT FUEL PUMP EICAS MESSAGE ILLUMINATED WITH PRESSURE LIGHT. REMOVED THE LT AFT BOOST PUMP IAW AMM 28-22-03. REMOVED AND INSTALLED THE BOOST PUMP IAW AMM 28-22-03. OPS CHECKED OK. OK FOR SERVICE.SDR XYZA20170228001Carburetor · contaminatedAFTER TAKEOFF AT APPROXIMATELY 200-250 FEET AGL THE ENGINE POWER DECREASED AND SUBSEQUENTLY WOULD NOT GO ABOVE IDLE. AIRCRAFT MADE AN EMERGENCY LANDING SAFELY PAST THE END OF THE RUNWAY IN A GRASSY AREA. TROUBLESHOOTING REVEALED CARBURETOR TO BE CONTAMINATED WSDR HALA2017021000026Circuit Breaker · trippedETOPS SIGNIFICANT SYSTEM - L AFT FUEL PUMP EICAS MESSAGE AFTER PUSH RETURN TO GATE. FOUND LT AFT FUEL PUMP BREAKER OUT, RESET AND OPS CK OK, PUMP PRESS OK AND BREAKER STAYED SET OK TO CONT.SDR AALA201702089010Relay · faultedCENTER TANK NR 1 PUMP FAULTED. REPLACED 69QA RELAY.SDR R61A201702050097Pump · inoperativeCREW RECEIVED A FUEL 2 LOW LEVEL MESSAGE. DECLARED AN EMERGENCY, RETURNED TO DEPARTURE AND LANDED WITHOUT INCIDENT. MAINTENANCE TROUBLESHOT, REMOVED AND REPLACED SCAVENGE EJECTOR PUMP IAW AMM AND OPS CHECKED GOOD.SDR ASAA2017020419666Pump · failedNR 1 AFT BOOST PUMP LOW PRESSURE LIGHT ILLUMINATED. ACFT GROUNDED. REMOVED AND REPLACED THE BOOST PUMP IAW AMM 28-22-41. OPERATIONAL AND LEAK CHECKED GOOD.SDR IPXA2017020313639Pump · malfunctionedLT FWD FUEL PUMP EICAS MESSAGE CAME ON TWICE ONE CLIMBOUT THROUGH 37000FT,THE OTHER TIME ON LEVEL OFF AT 41000FT. LT FWD FUEL PUMP PLACED ON MEL IAW 28-22-1-0-1. R & R IAW AMM 28-42-07. OPS CHECKED OK.SDR UIEA2017012400105Pump · damagedRIGHT FWD BOOST PUMP HAS SIGNIFICANT CORROSION AND EROSION. REMOVED & REPLACED THE BOOST PUMP IAW AMM 28-22-03</P>)SDR AALA201702019004Contactor · faultedLEFT WING NR 1 TANK FUEL PUMP FAULTED. REPLACED THE FUEL PUMP SUPPLY CONTACTOR.SDR AALA20170201029Pump · faultyAIRCRAFT WAS GROUNDED. AFTER BURNING CENTER TANK DOWN TO ZERO, WITH CENTER PUMP OFF, CENTER TANK QUANTITY INCREASED. REMOVED AND REPLACED LEFT WING FUEL SCAVENGE JET PUMP IAW AMM 28-22-17. LEAK AND OPERATIONAL CHECK GOOD.SDR AALA201701229009Pump · inoperativeAIRCRAFT WAS NOT GROUNDED. CENTER TANK FUEL PUMP NR 2 INOPERABLE. MAINTENANCE REPLACED CENTER TANK FUEL PUMP NR 2 PER AMM 28-21-51-400-002-A.SDR AALA20170124014Pump · faultyAIRCRAFT WAS GROUNDED. DURING CRUISE WITH ALL FUEL PUMPS ON, THE RIGHT MAIN WENT TO 1000 LBS OUT OF BALANCE. REMOVED AND REPLACED RIGHT CENTER FUEL BOOST PUMP IAW AMM 28-22-41 AND ENGINE CROSSFEED VALVE IAW AMM 28-22-21(AALA20170124015). LEAK AND OPERATIONAL CSDR AALA20170119025Warning Message · false indicationAFTER TAKEOFF, INDICATION OF NR 1 CENTER FUEL PUMP FAULT. ACCOMPLISHED TSM 28-21-00 AND FOUND GROUND FAULT INTERRUPTION NOT TRIPPED. COULD NOT DUPLICATE FAULT. OPS CHECKED GOOD.SDR SWAA2017011311167Pump · inoperativeCENTER TANK WILL NOT FEED BOTH CENTER TANK LOW PRESSURE LIGHTS ILLUMINATED WITH PUMP SWITCHES ON 1220 FUEL IN CENTER TANK. REPAIRED PRIMARY CENTER BOOST PUMP IAW AMM.SDR SWAA2017011311164Pump · inoperativeCENTER TANK WILL NOT FEED BOTH CENTER TANK LOW PRESSURE LIGHTS ILLUMINATED WITH PUMP SWITCHES ON 1220 FUEL IN CENTER TANK. REPAIRED SECONDARY CENTER BOOST PUMP IAW AMM.
Back to JASC 2822